KPMG Actuaries Pty Limited | ||||||
Australian Financial Services Licence No: 227 328 | ABN: 77 002 882 000 | |||||
10 Shelley Street | PO Box H67 | Telephone: +61 2 9335 8900 | ||||
Sydney NSW 2000 | Australia Square | Facsimile: +61 2 9335 8911 | ||||
Australia | Sydney NSW 1213 | Email: [email protected] | ||||
Australia |
KPMG Actuaries Pty Limited | ||||||
Australian Financial Services Licence No: 227 328 | ABN: 77 002 882 000 | |||||
10 Shelley Street | PO Box H67 | Telephone: +61 2 9335 8900 | ||||
Sydney NSW 2000 | Australia Square | Facsimile: +61 2 9335 8911 | ||||
Australia | Sydney NSW 1213 | Email: [email protected] | ||||
Australia |
Yours sincerely |
||
Richard Wilkinson BSc FIA FIAA
|
Neil Donlevy MA FIA FIAA | |
Director
|
Director | |
KPMG Actuaries Pty Ltd
|
KPMG Actuaries Pty Ltd | |
Fellow of the Institute of Actuaries
|
Fellow of the Institute of Actuaries | |
(London)
|
(London) | |
Fellow of the Institute of Actuaries of
|
Fellow of the Institute of Actuaries of | |
Australia
|
Australia |
i
| Amaca Pty Ltd (formerly James Hardie & Coy); | ||
| Amaba Pty Ltd (formerly Jsekarb); and | ||
| ABN60 Pty Ltd (formerly James Hardie Industries Ltd). |
ii
iii
iv
March | ||||||||||||||||||||
September 2006 | 2006 | June 2005 | ||||||||||||||||||
$m | $m | $m | ||||||||||||||||||
Gross of | Net of | Net of | Net of | |||||||||||||||||
insurance | Insurance | insurance | insurance | insurance | ||||||||||||||||
recoveries | recoveries | recoveries | recoveries | recoveries | ||||||||||||||||
Total projected
cashflows in current
dollars (uninflated and
undiscounted) |
1,718.7 | 239.7 | 1,479.0 | 1,478.5 | 1,596.9 | |||||||||||||||
Future inflation
allowance (base and
superimposed inflation) |
2,038.2 | 273.3 | 1,764.9 | 1,763.2 | 1,709.1 | |||||||||||||||
Total projected cash-flows with inflation
allowance |
3,756.9 | 512.9 | 3,244.0 | 3,241.7 | 3,306.0 | |||||||||||||||
Discounting allowance |
(1,929.0 | ) | (275.0 | ) | (1,654.0 | ) | (1,650.2 | ) | (1,654.3 | ) | ||||||||||
Net present value
liabilities (pre cost
savings) |
1,827.9 | 237.9 | 1,590.0 | 1,591.5 | 1,651.7 | |||||||||||||||
Net present value
liabilities allowing for the DDT Act 2005
applying in NSW only* |
1,788.3 | 233.5 | 1,554.8 | 1,517.0 | 1,568.4 | |||||||||||||||
Net present value
liabilities allowing for procedural reforms
applying nationally** |
1,762.0 | 230.5 | 1,531.5 | 1,468.0 | 1,513.3 |
* | This is based on our estimate that NSW represents 50% of the future liabilities. All future figures showing NSW only use this estimate. | |
** | As noted in Section 6.3.1, the estimation of the legal cost savings arising from the other States is subject to considerably greater uncertainty than those assessed for NSW. |
v
| An increase in projected future claim numbers, especially for asbestosis claims; and | |
| An increase in the rate of future claims inflation assumed based on recent emerging trends in overall claim cost inflation; |
| A lower assumed overall average cost per claim based on recent trends; and | |
| An increase in the proportion of mesothelioma claims which are expected to settle for nil costs. |
vi
$m | ||||
Net
liability at start of valuation period allowing for cost savings on NSW only
|
1,517.0 | |||
Expected net claims payments |
(35.1 | ) | ||
Unwind of discount |
41.0 | |||
Expected liability at end of valuation period |
1,522.9 | |||
Change in discount rate |
(0.4 | ) | ||
Expected net liability at end of valuation period
adjusted for discount rate |
1,522.5 | |||
Impact of Change in valuation bases: |
||||
- Claim numbers and peak year |
62.6 | |||
- Nil settlement rate |
(8.5 | ) | ||
- Average claims costs and legal costs |
(50.2 | ) | ||
- Claims inflation |
43.4 | |||
- Emerging experience on reported claims and pending
claims |
(15.0 | ) | ||
Total development in net liability |
32.3 | |||
Net liability at end of valuation period allowing for
cost savings in NSW only |
1,554.8 |
vii
Net Liability | Net Liability | Net Liability | ||||||||||||||||||||||
at Sept 2006 | at March 2006 | at June 2005 | ||||||||||||||||||||||
$m | $m | $m | ||||||||||||||||||||||
Net claim costs (excl Claims Legal Costs) | 1,230.3 | 1,190.6 | 1,222.2 | |||||||||||||||||||||
Total Claims Legal Costs (plaintiff and defendant costs) | 359.7 | 400.9 | 429.5 | |||||||||||||||||||||
Net Liability before cost savings | 1,590.0 | 1,591.5 | 1,651.7 | |||||||||||||||||||||
NSW | Australia | NSW | Australia | NSW | Australia- | |||||||||||||||||||
Only | -wide | Only | -wide | Only | wide | |||||||||||||||||||
Estimate of cost
savings |
(35.2 | ) | (58.5 | ) | (74.5 | ) | (123.5 | ) | (83.3 | ) | (138.4 | ) | ||||||||||||
Net Liability after
savings |
1,554.8 | 1,531.5 | 1,517.0 | 1,468.0 | 1,568.4 | 1,513.3 | ||||||||||||||||||
Claims Legal Costs
after savings |
324.5 | 301.2 | 326.4 | 277.4 | 346.2 | 291.1 | ||||||||||||||||||
Claims Legal Costs, as
% of gross costs of
settlements |
22.1 | % | 20.5 | % | 22.8 | % | 19.4 | % | 24.2 | % | 20.3 | % | ||||||||||||
Claims Legal Costs, as
% of net costs of
settlements |
26.4 | % | 24.5 | % | 27.4 | % | 23.3 | % | 28.3 | % | 23.8 | % |
viii
| Discounted Central Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, after allowing for Insurance and Other Recoveries. | ||
| Term Central Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, in each case which are reasonably expected to become payable up to 31 March 2045, after allowing for Insurance and Other Recoveries. | ||
| Period Actuarial Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, in each case which are reasonably expected to become payable in the next three years, before allowing for Insurance and Other Recoveries. |
Post cost savings | ||||
(NSW only) | ||||
Discounted Central Estimate (net of cross-claim
recoveries, Insurance and Other Recoveries) |
1,554.8 | |||
Period Actuarial Estimate (net of cross-claim
recoveries, gross of Insurance and Other
Recoveries) comprising: |
199.9 | |||
Discounted value of cashflow in 2006/07 |
37.0 | |||
Discounted value of cashflow in 2007/08 |
75.0 | |||
Discounted value of cashflow in 2008/09 |
88.0 | |||
Term Central
Estimate (net of cross-claim recoveries, Insurance and Other Recoveries) |
1,550.9 |
ix
| the net asset position of the Special Purpose Fund at that time; | ||
| the free cash flow amount of the JHINV Group in the preceding financial year; and | ||
| the Period Actuarial Estimate in the latest Annual Actuarial Report. |
| The difficulty in quantifying the extent and pattern of past asbestos exposures and the number and incidence of the ultimate number of lives that may be affected by asbestos related diseases arising from such past asbestos exposures; | ||
| The propensity of individuals affected by diseases arising from such exposure to file common law claims against defendants; | ||
| The extent to which the Liable Entities will be joined in such future common law claims; | ||
| The fact that the ultimate severity of the impact of the disease and the quantum of the claims that will be awarded will be subject to the outcome of events that have not yet occurred, including: |
| medical and epidemiological developments; | ||
| court interpretations; | ||
| legislative changes; | ||
| changes to the form and range of benefits for which compensation may be awarded (heads of damage); | ||
| public attitudes to claiming; | ||
| the impact of new (and future) procedural reforms in NSW upon the legal costs incurred in managing and settling claims; | ||
| the potential for future procedural reforms in other States affecting the legal costs incurred in managing and settling claims in those States; | ||
| potential third-wave exposures; and | ||
| social and economic conditions such as inflation. |
x
xi
We have been provided with the following information by the MRCF and ACS: | |||
| MRCF claims database at 30 September 2006 with individual claims listings; | ||
| MRCF accounting database at 30 September 2006 (which includes individual claims payment details); | ||
| MRCF Monthly Management Information Reports to 30 September 2006; | ||
| MRCF Home Renovator Reports at various dates; and | ||
| Detailed insurance bordereaux information (being a listing of claims filed with the insurers of the Liable Entities) provided by ACS as at 30 September 2006. |
xii
1 Scope and Purpose |
1 | |||
1.1 Introduction |
2 | |||
1.2 Purpose of this report |
3 | |||
1.3 Scope of report |
5 | |||
1.4 Areas of potential exposure not included |
11 | |||
1.5 Data reliances and limitations |
12 | |||
1.6 Uncertainty |
12 | |||
1.7 Distribution and use |
13 | |||
1.8 Author of the report |
13 | |||
1.9 Professional standards and compliance |
14 | |||
2 Exposure history of James Hardies former subsidiaries |
15 | |||
2.1 Overview |
15 | |||
2.2 Baryulgil mining activities |
15 | |||
2.3 Asbestos cement |
17 | |||
2.4 Insulation products |
17 | |||
2.5 Brake linings |
18 | |||
3 Areas of Potential Exposure |
19 | |||
3.1 Overview |
19 | |||
3.2 Potential changes to the number of future claims |
19 | |||
3.3 Potential changes to claims costs |
22 | |||
3.4 Medical developments |
28 | |||
4 Data |
30 | |||
4.1 Data provided to KPMG Actuaries |
30 | |||
4.2 Data limitations |
31 | |||
4.3 Data verification |
32 | |||
4.4 Data interpretation and analysis |
36 | |||
4.5 The Second Cost Consultants Report: July 2005 |
39 | |||
4.6 Data conclusion |
40 | |||
5 Valuation Methodology and Approach |
41 | |||
5.1 Previous valuation work and methodology changes |
41 | |||
5.2 Overview of current methodology |
41 | |||
5.3 Disease type and class subdivision |
43 | |||
5.4 Numbers of future claims notifications |
45 | |||
5.5 Numbers of claim settlements from future claim notifications |
47 | |||
5.6 Proportion of claims settled for nil amounts |
49 | |||
5.7 Average claim costs of IBNR claims |
50 | |||
5.8 Pending claims |
52 | |||
5.9 Insurance Recoveries |
55 |
5.10 Bad debt allowance |
58 | |||
5.11 Cross-claim recoveries |
58 | |||
5.12 Discounting cashflows |
60 | |||
6 Cost Savings Arising from the DDT Act 2005 |
61 | |||
6.1 Background to the DDT Act 2005 |
61 | |||
6.2 Methodology |
63 | |||
6.3 Potential cost savings in other States |
65 | |||
6.4 Savings achieved to date |
67 | |||
7 Economic Assumptions |
69 | |||
7.1 Overview |
69 | |||
7.2 Claims inflation |
69 | |||
7.3 Discount rates: Commonwealth bond zero coupon yields |
74 | |||
7.4 Consistency of economic assumptions |
75 | |||
8 Analysis of Claims Experience Claim Numbers |
77 | |||
8.1 Overview |
77 | |||
8.2 Mesothelioma claims |
78 | |||
8.3 Asbestosis claims |
85 | |||
8.4 Lung cancer claims |
89 | |||
8.5 ARPD & Other claims |
89 | |||
8.6 Workers Compensation and wharf claims |
89 | |||
8.7 Summary of base claims numbers assumptions |
90 | |||
8.8 Exposure information |
91 | |||
8.9 Latency model |
94 | |||
8.10 Peak year of claims and estimated future notifications |
97 | |||
8.11 Baryulgil |
100 | |||
9 Analysis of Experience Average Claims Costs |
101 | |||
9.1 Overview |
101 | |||
9.2 Mesothelioma claims |
103 | |||
9.3 Asbestosis claims |
110 | |||
9.4 Lung cancer claims |
111 | |||
9.5 ARPD & Other claims |
113 | |||
9.6 Workers Compensation claims |
114 | |||
9.7 Wharf claims |
116 | |||
9.8 Large claim size and incidence rates |
117 | |||
9.9 Average defendant legal cost for non-nil and nil claim settlements (before allowance for cost savings) |
119 | |||
9.10 Superimposed inflation |
122 | |||
9.11 Ageing of claimants |
125 | |||
9.12 Summary assumptions |
126 | |||
10 Analysis of Claims Experience Nil Settlement Rates |
127 |
10.1 Nil settlement rate |
127 | |||
10.2 Mesothelioma claims |
128 | |||
10.3 Asbestosis claims |
131 | |||
10.4 Lung cancer claims |
132 | |||
10.5 ARPD & Other claims |
133 | |||
10.6 Workers Compensation claims |
134 | |||
10.7 Wharf claims |
135 | |||
10.8 Summary assumptions |
136 | |||
11 Product and Public Liability Insurance Programme |
137 | |||
11.1 Overview |
137 | |||
11.2 Allowance for Insurance Recoveries |
138 | |||
11.3 Bad debt allowance on Insurance Recoveries |
139 | |||
11.4 Bolton Metropolitan Borough Council vs. Municipal Mutual Insurance Ltd (UK) and Commercial Union |
139 | |||
11.5 Expected Insurance Recoveries |
143 | |||
12 Valuation Results |
145 | |||
12.1 Central estimate liability |
145 | |||
12.2 Comparison with previous valuations |
147 | |||
12.3 Claims and legal costs |
149 | |||
12.4 Cashflow projections |
150 | |||
12.5 Final Funding Agreement calculations |
152 | |||
12.6 Accounting liability calculations |
154 | |||
13 Uncertainty |
155 | |||
13.1 Overview |
155 | |||
13.2 Sensitivity testing |
156 | |||
13.3 Results of sensitivity testing |
158 |
Table 1.1: Summary of valuation assessments by KPMG Actuaries |
3 | |||
Table 2.1: History of Baryulgil mine |
15 | |||
Table 4.1: Comparison of results from claims and accounting databases at 30 September 2006 |
34 | |||
Table 5.1: Assumed latency periods by disease type |
46 | |||
Table 5.2: Settlement pattern of claims awards by delay from claim reporting |
49 | |||
Table 5.3: Projected savings as a % of case estimates: 2002-2006 |
53 | |||
Table 5.4: Component of cost arising from pending claims |
54 | |||
Table 5.5: Cross-claim recoveries by settlement year |
59 | |||
Table 6.1: Cost Consultants estimates of legal costs Old Process ($) |
64 |
Table 6.2: Cost Consultants estimates of legal costs New Process ($) |
64 | |||
Table 6.3: Estimated future proportion of liabilities by State |
66 | |||
Table 6.4: Estimated proportion of legal costs saved by State |
67 | |||
Table 7.1: Annualised rates of CPI and AWOTE |
71 | |||
Table 7.2: Claims inflation assumptions |
74 | |||
Table 7.3: Zero coupon yield curve by duration |
75 | |||
Table 8.1: Number of claims reported annually |
77 | |||
Table 8.2: Number of mesothelioma claims by location of claim filing |
80 | |||
Table 8.3: Number of asbestosis claims by location of claim filing |
87 | |||
Table 8.4: Base claim numbers assumptions |
90 | |||
Table 8.5: Peak year of claim notifications |
98 | |||
Table 8.6: Number of claim notifications by disease type |
99 | |||
Table 9.1: Average attritional non-nil claim award (inflated to 2006/07 money terms) |
102 | |||
Table 9.2: Contribution rate for direct mesothelioma claims: 1994-2006 |
103 | |||
Table 9.3: Average mesothelioma claims assumptions |
110 | |||
Table 9.4: Average asbestosis claims assumptions |
111 | |||
Table 9.5: Average lung cancer claims assumptions |
113 | |||
Table 9.6: Average ARPD & Other claims assumptions |
114 | |||
Table 9.7: Average Workers Compensation claims assumptions |
116 | |||
Table 9.8: Average wharf claims assumptions |
117 | |||
Table 9.9: Summary average cost assumptions |
126 | |||
Table 10.1: Nil settlement rates by class and disease type |
127 | |||
Table 10.2: Average cost per attritional mesothelioma claim |
130 | |||
Table 10.3: Summary nil settlement rate assumptions |
136 | |||
Table 11.1: Insurance recoveries at 30 September 2006 |
143 | |||
Table 12.1: Comparison of central estimate of liabilities |
146 | |||
Table 12.2: Analysis of change: March 2006 to September 2006 |
148 | |||
Table 12.3: Breakdown of components of net central estimate liabilities |
150 | |||
Table 12.4: Final Funding Agreement calculations ($m) NSW cost savings scenario |
153 |
Figure 1.1: Illustrative distribution of liability outcomes |
5 | |||
Figure 2.1: Person years of exposure by year of exposure for Baryulgil mine workers: 1944 to 1979 |
16 | |||
Figure 5.1: Settlement pattern derivation for mesothelioma claims |
47 | |||
Figure 5.2: Settlement pattern derivation for non-mesothelioma claims |
48 |
Figure 5.3: Size distribution of non-nil mesothelioma claims split by contribution from each year of exposure (award only) |
57 | |||
Figure 6.1: Split of total award cost of claims by State in current money terms |
65 | |||
Figure 7.1: Trends in Bond Yields: 1996 2006 |
70 | |||
Figure 7.2: Trends in CPI and AWOTE: 1970 - 2005 |
72 | |||
Figure 8.1: Proportion of claims by disease type: 2000-2006 |
78 | |||
Figure 8.2: Monthly notifications of mesothelioma claims: 2000-2006 |
79 | |||
Figure 8.3: Quarterly reporting pattern of mesothelioma claims |
82 | |||
Figure 8.4: Rolling annualised averages of mesothelioma claim notifications |
83 | |||
Figure 8.5: Change in mesothelioma claims projections at successive valuations |
85 | |||
Figure 8.6: Monthly notifications of asbestosis claims: 2000-2006 |
86 | |||
Figure 8.7: Rolling annualised averages of asbestosis claim notifications |
88 | |||
Figure 8.8: Consumption and production indices Australia 1920-2002 |
91 | |||
Figure 8.9: Exposure (person-years) of all Liable Entities claimants to date |
92 | |||
Figure 8.10: Exposure (person years) of all claimants to date by report year and exposure year |
93 | |||
Figure 8.11: Latency of mesothelioma claims |
95 | |||
Figure 8.12: Latency of asbestosis claims |
95 | |||
Figure 8.13: Latency of lung cancer claims |
96 | |||
Figure 8.14: Latency of ARPD & Other claims |
96 | |||
Figure 8.15: Expected future claim notifications by disease type |
99 | |||
Figure 9.1: Distribution of contribution rates for direct mesothelioma claims |
104 | |||
Figure 9.2: Distribution of claims by number of defendants |
105 | |||
Figure 9.3: Average number of unique defendants per claim |
106 | |||
Figure 9.4: Contribution of individual bands of claims to overall average attritional mesothelioma claim costs (inflated to 2006/07 money terms) |
107 | |||
Figure 9.5: Distribution of claims awards for mesothelioma claims (inflated to 2006/07 money terms) |
108 | |||
Figure 9.6: Inflated average awards and number of non-nil claims settlements for mesothelioma claims: 1994 to 2006 |
109 | |||
Figure 9.7: Inflated average awards and number of non-nil claims settlements for asbestosis claims: 1994 to 2006 |
110 | |||
Figure 9.8: Inflated average awards and number of non-nil claims settlements for lung cancer claims: 1994 to 2006 |
112 | |||
Figure 9.9: Inflated average awards and number of non-nil claims settlements for ARPD & Other claims: 1994 to 2006 |
113 | |||
Figure 9.10: Inflated average awards and number of non-nil claims settlements for Workers Compensation claims: 1994 to 2006 |
115 | |||
Figure 9.11: Inflated average awards and number of non-nil claims settlements for Wharf claims: 1994 to 2006 |
116 |
Figure 9.12: Scatter plot of large claims by settlement year |
118 | |||
Figure 9.13: Inflated average defendant legal costs for non-nil claims by closure year |
120 | |||
Figure 9.14: Inflated average defendant legal costs for nil claims by closure year |
121 | |||
Figure 9.15: Inflated average mesothelioma awards: 1995/96 to 2006/07 |
123 | |||
Figure 9.16: Age profile of claimants: 1991/92 to 2006/07 by report year |
125 | |||
Figure 10.1: Mesothelioma nil claims experience: 1994 to 2006 |
128 | |||
Figure 10.2: Asbestosis nil claims experience: 1994 to 2006 |
131 | |||
Figure 10.3: Lung cancer nil claims experience: 1994 to 2006 |
132 | |||
Figure 10.4: ARPD & Other nil claims experience: 1994 to 2006 |
133 | |||
Figure 10.5: Workers Compensation nil claims experience: 1994 to 2006 |
134 | |||
Figure 10.6: Wharf nil claims experience: 1994 to 2006 |
135 | |||
Figure 12.1: Composition of claim settlements: 2003-2005 |
149 | |||
Figure 12.2: Past cashflow of the MRCF from 1 January 2003 to 30 September 2006 |
151 | |||
Figure 12.3: Cashflow projections 30 September 2006 ($m) |
152 | |||
Figure 13.1: Sensitivity testing results Impact around the net central estimate (discounted) (in $m), based on application of the DDT Act 2005 in NSW only |
159 | |||
Figure 13.2: Sensitivity testing results Impact around the net central estimate (undiscounted) (in $m), based on application of the DDT Act 2005 in NSW only |
160 |
A.Credit rating default rates by duration |
162 | |||
B.Summary results ($m) |
164 | |||
B.1 Prior to cost savings |
164 | |||
B.2 Post cost savings in NSW only |
165 | |||
B.3 Post cost savings applied Australia-wide |
166 | |||
C.Projected cashflows ($m) |
167 | |||
C.1 Prior to cost savings |
167 | |||
C.2 Post cost savings in NSW only |
168 | |||
C.3 Post cost savings applied Australia-wide |
169 | |||
D.Projected discounted cashflows ($m) |
170 | |||
D.1 Prior to cost savings |
170 | |||
D.2 Post cost savings in NSW only |
171 | |||
D.3 Post cost savings applied Australia-wide |
172 | |||
E. Comparison of costs: 30 September 2006 |
173 | |||
F.Actuarial valuation assumptions |
174 |
F.1 Total number of claims notifications (past & future) |
174 | |||
F.2 Latency model |
174 | |||
F.3 Assumed peak year of notifications |
175 | |||
F.4 Projected average Liable Entities share of claim award costs of non-nil settlements (pre cost savings) |
176 | |||
F.5 Projected average Liable Entities defendant costs of nil settlements (pre cost savings) |
176 | |||
F.6 Projected average Liable Entities share of defendant claims legal costs of non-nil settlements (pre cost savings) |
177 | |||
F.7 Large claims loading (for claims in excess of $1m in 2005/06 money terms) |
178 | |||
F.8 Nil claim settlement rate |
178 | |||
F.9 Cross-claim recoveries and Other Recoveries rate |
179 | |||
F.10 Margin in case estimates |
179 | |||
F.11 Economic assumptions excluding discount rate |
179 | |||
F.12 Discount rate by year |
180 | |||
G. Pending claims reserve adequacy additional analysis |
181 | |||
G.1 MRCF analysis |
181 | |||
G.2 Actuarial estimate of future savings on pending claims |
182 | |||
H. Australian asbestos consumption and production data: 1920-2002 |
184 | |||
I. Derivation of US GAAP accounting liability |
185 | |||
J. Additional claims information at 30 September 2006 |
186 | |||
K. Glossary of terms |
187 |
1 | SCOPE AND PURPOSE |
Page 1
1.1 | Introduction | |
1.1.1 | Chronology of events | |
In February 2001, the Medical Research & Compensation Foundation (MRCF) was established as a charitable trust to meet the asbestos-related liabilities of two former subsidiaries of the James Hardie Group of Companies, namely Amaca Pty Ltd (formerly James Hardie & Coy) and Amaba Pty Ltd (formerly Jsekarb). | ||
In February 2004, the NSW Government established the Special Commission of Inquiry into the Establishment of the MRCF. In September 2004, one of the findings of the Inquiry was that the MRCF was under-funded insofar as it would not have sufficient assets to meet its expected future liabilities. | ||
During the Special Commission of Inquiry, James Hardie Industries NV (James Hardie) made an offer to fund the liabilities of the Liable Entities subject to certain conditions and shareholder approval. Subsequent to the Special Commission of Inquirys findings, negotiations began to establish the basis on which the funding may take place. | ||
A Heads of Agreement was signed on 21 December 2004 between James Hardie, the ACTU, a representative of the Asbestos Victims Groups, UnionsNSW and the NSW Government. This was a non-binding agreement which set out the principles upon which the Final Funding Agreement would be based. | ||
The Final Funding Agreement was signed by James Hardie and the NSW Government on 1 December 2005 and will, subject to lender and shareholder approval and the meeting of all of the Conditions Precedent, provide a basis for the ongoing funding of those asbestos-related disease liabilities which are intended to be met by the Special Purpose Fund. | ||
1.1.2 | Liability assessments undertaken by KPMG Actuaries | |
KPMG Actuaries Pty Ltd (KPMG Actuaries) was retained by James Hardie and Allens Arthur Robinson (AAR) during the Special Commission of Inquiry to provide an assessment of the asbestos-related disease liabilities of the MRCF at 30 June 2003. | ||
Within the valuation as at 30 June 2003, KPMG Actuaries estimated the discounted value of the quantifiable liabilities of the MRCF on a central estimate basis as $1,573.4m (equivalent to an undiscounted estimate of $3,403.1m), based on the then current economic and legal environment, net of insurance recoveries and after allowance for claims-related legal costs. |
Page 2
Since that time, KPMG Actuaries has been retained to provide updated assessments of the liabilities at various dates. | ||
The following table shows the valuation assessments made by KPMG Actuaries. |
Discounted | Undiscounted | |||||||||||||||
Report | Central | central | ||||||||||||||
Valuation | Based on | release | Estimate | estimate | ||||||||||||
Date | data as at | date | ($m) | ($m) | ||||||||||||
30/06/03 |
30/06/03 | 07/06/04 | 1,573.4 | 3,403.1 | ||||||||||||
30/06/04 |
18/10/04 | 21/11/04 | 1,536.0 | 3,585.6 | ||||||||||||
31/03/05 |
31/03/05 | 14/05/05 | 1,684.9 | 3,603.7 | ||||||||||||
30/06/05 (a) |
24/06/05 | 01/12/05 | 1,568.4 | 3,131.0 | ||||||||||||
31/03/06 (a) |
28/02/06 | (b) | 15/05/06 | 1,517.0 | 3,079.2 | |||||||||||
30/09/06 (a) |
30/09/06 | 13/11/06 | 1,554.8 | 3,168.9 |
The precise scope of the liability assessment of the various historic reports has varied, including varying from the scope of this Report which quantifies the liabilities which are to be met by the Special Purpose Fund as set out in the Final Funding Agreement. The reports at 31 March 2006 and 30 June 2005 were also prepared in accordance with the Final Funding Agreement. | ||
Accordingly, comparison between the various estimates of liabilities requires some care and should be regarded as indicative only. | ||
1.2 | Purpose of this report | |
Both the Heads of Agreement and the Final Funding Agreement envisage the completion of an Annual Actuarial Report evaluating the potential asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund. |
Page 3
1.2.1 | Liable Entities | |
The Liable Entities are defined as being the following entities: |
| Amaca Pty Ltd (formerly James Hardie & Coy); | ||
| Amaba Pty Ltd (formerly Jsekarb); and | ||
| ABN60 Pty Ltd (formerly James Hardie Industries Ltd). |
The Board of James Hardie have agreed that Personal Asbestos Claims arising out of mining activities at Baryulgil will also be met by the Special Purpose Fund (these liabilities are referred to in the Final Funding Agreement as liabilities in relation to Marlew Claims). | ||
1.2.2 | Personal asbestos claims | |
Under the Final Funding Agreement, the liabilities to be met by the Special Purpose Fund relate to personal asbestos-related disease liabilities of the Liable Entities. | ||
Such claims must relate to exposure which took place in Australia and which have been brought in a Court in Australia. | ||
The precise scope of the liabilities is detailed in Section 1.3 and in Appendix K. | ||
1.2.3 | Purpose of report | |
KPMG Actuaries has been retained by James Hardie to provide an actuarial valuation report, consistent with the Annual Actuarial Report as envisaged under the Final Funding Agreement. The prior written consent of KPMG Actuaries is required for any other use of this report or the information contained in it. | ||
Our valuation is intended to be effective as at 30 September 2006 and has been based on claims data and information provided as at 30 September 2006 provided to us by Amaca Claims Services (ACS). | ||
The Medical Research and Compensation Foundation, Amaca Pty Limited and Amaba Pty Limited are not responsible for, and did not request, the preparation of this report. | ||
Nonetheless, the MRCF have requested to see, and will be provided with, a copy of this report. | ||
We thank the MRCF and ACS for the provision of the data, the availability of their staff and for their general assistance and co-operation. |
Page 4
1.3 | Scope of report | |
We have been requested by James Hardie to provide an actuarial assessment as at 30 September 2006 of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund, consistent with the terms of the Final Funding Agreement. | ||
The assessment is on a central estimate basis and is based on the claims experience as at 30 September 2006. The Discounted Central Estimate takes into account the anticipated cost savings arising from the procedural reforms resulting from the DDT Act 2005. | ||
A central estimate liability assessment is an estimate of the expected value of the range of potential future liability outcomes. In other words, if all the possible values of the liabilities are expressed as a statistical distribution, the central estimate is an estimate of the mean of that distribution. The central estimate liability represents the expected present value of the future asbestos-related claim payments by the Liable Entities in relation to future Proven Claims and Claims Legal Costs to be met by the Special Purpose Fund. | ||
The following chart illustrates the central estimate (the vertical black line) in comparison to the range of potential future outcomes (shown by the blue curve). |
Page 5
The chart provides an illustration of the distribution of possible outcomes and indicates that the actual out-turn could be significantly above, or below, the central estimate assessment we have made within this report. | ||
It is of note that our liability assessment: |
| Relates to the Liable Entities and Marlew (in relation to Marlew Claims arising from asbestos mining activities at Baryulgil); | ||
| Is intended to cover: |
§ | The amount of settlements, judgments or awards for all Personal Asbestos Claims. | ||
§ | Claims Legal Costs incurred by the Special Purpose Fund in connection with the settlement of Personal Asbestos Claims. |
| Is not intended to cover: |
§ | Personal injury or death claims arising from exposure to asbestos which took place outside Australia. | ||
§ | Personal injury or death claims, arising from exposure to Asbestos, which are brought in Courts outside Australia. | ||
§ | Claims for economic loss, other than any economic loss forming part of an award for damages for personal injury and/or death. | ||
§ | Claims for loss of property, including those relating to land remediation. | ||
§ | The costs of asbestos or asbestos product removal relating to asbestos or asbestos products manufactured or used by or on behalf of the Liable Entities. |
| Includes an allowance for: |
§ | Compensation to the NSW Dust Diseases Board or a Workers Compensation Scheme by way of a claim by such parties for contribution or reimbursement from the Liable Entities, but only to the extent that the cost of such claims is less than the limits of funding for such claims as outlined within the Final Funding Agreement. |
Page 6
§ | Workers Compensation claims, being claims from current and former employees of the Liable Entities, but only to the extent that such liabilities are not met by a Workers Compensation Scheme or Policy (see section 1.3.1). |
| Assumes that the product and public liability insurance policies of the Liable Entities will continue to respond to claims as and when they fall due. We have not made any allowance for the impact of any disputation concerning Insurance Recoveries nor of any legal costs that may be incurred in resolving such disputes. | ||
| Makes no allowance for potential Insurance Recoveries that could be made on product and public liability insurance contracts placed from 1986 onwards which were placed on a claims made basis. | ||
| Makes no allowance for the future Operating Expenses of the Liable Entities or the Special Purpose Fund. | ||
| Assumes a continuation of the existing legal environment in relation to claims settlements. | ||
| Makes no additional allowance for the inherent uncertainty of the liability assessment. That is, no additional provision has been included in excess of a central estimate. | ||
| Makes allowance for an estimate of the potential savings arising from the procedural reforms in NSW resulting from the enactment of the DDT Act 2005 which became an Act on 26 May 2005 and became effective on 1 July 2005. |
Readers of this report may refer to our previous reports (as set out in Section 1.1.2) which are available at www.ir.jameshardie.com.au. | ||
1.3.1 | Workers Compensation | |
Workers Compensation claims are claims made by current and former employees of the Liable Entities. Such past, current and future reported claims were insured with, amongst others, Allianz Australia Limited (Allianz) and the various State-based Workers Compensation Schemes. |
Page 7
Under the Final Funding Agreement, the part of future Workers Compensation claims that are met by a Workers Compensation Scheme or Policy of the Liable Entities are outside of the Special Purpose Fund. The Special Purpose Fund is, however, to provide for any part of a claim not covered by a Workers Compensation Scheme or Policy (e.g. as a result of the existence of limits of indemnity and policy deductibles on those contracts of insurance). | ||
On this basis our liability assessment in relation to Workers Compensation claims and which relates to the Special Purpose Fund, includes only the amount borne by the Liable Entities in excess of the anticipated recoveries due from a Workers Compensation Scheme or Policy. | ||
In making our assessment we have assumed that the Workers Compensation insurance programme will continue to respond to claims by current and former employees of the Liable Entities as and when they fall due. To the extent that they were not to respond owing to (say) insurer insolvency, insurer guarantee funds should be available to meet such obligations. | ||
1.3.2 | ABN60 Liability | |
Overall our current assessment is that the asbestos-related disease liabilities of ABN60 are not material within the context of the overall liability of the Liable Entities. We have formed this view based on the following considerations. | ||
To date, there have been 98 claims filed against ABN60 or James Hardie Industries Limited, of which 3 were filed in 2001/02, 1 filed in 2002/03 and 2 filed in 2004/05. To our knowledge there were no claims filed against ABN60 in 2005/06 or in 2006/07 to date. | ||
We note that the claims against ABN60 have been in relation to: |
| Claims by former employees of JHIL employed prior to 1937 (9); | ||
| New Zealand claims (16); | ||
| Cross-claims by Pacific Power (37); | ||
| Claims from Baryulgil (9); and | ||
| Other cross-claims (27). |
Page 8
We understand many of these claims (particularly from New Zealand, Pacific Power and Baryulgil) have not resulted in any judicial determination of liability against ABN60 and that the level of cost arising from these claims has been relatively insubstantial. In terms of employee claims the latest date of exposure should be 1937. | ||
All claims made to date in relation to ABN60 have been settled or dismissed. | ||
1.3.3 | Baryulgil | |
In light of the agreement by the Board of James Hardie to incorporate claims arising from mining activities at Baryulgil (called Marlew Claims in the Final Funding Agreement) into the Special Purpose Fund, where they are not otherwise recoverable from other sources, we have made allowance for the potential liabilities arising from exposure at Baryulgil, specifically: |
| Claims made against Amaca Pty Ltd or ABN60 resulting from their past ownership of the mine, or in the case of Amaca also in relation to their joint venture with Wunderlich, are to be covered by the Special Purpose Fund. | ||
| Claims made against the subsequent owner of the mine (following its sale by James Hardie Industries to Woodsreef in 1976), being Marlew Mining Pty Ltd (Marlew) which is in liquidation, are to be met by the Special Purpose Fund except where such claims are Excluded Marlew Claims, which are recoverable by the Claimant from other sources. |
Baryulgil claims are discussed further in Section 8.11. | ||
1.3.4 | Risk Margins | |
It has been common practice for insurance companies, and in some cases non-insurance companies, to hold claims provisions at a level above the central estimate basis to reflect the uncertainty attaching to the liability assessment and to include an allowance in respect of that uncertainty. | ||
A risk margin is an additional amount held, above the central estimate, which is held so as to increase the likelihood of adequacy of the provisions to meet the ultimate cost of settlement of those liabilities. | ||
We have not provided an assessment of any risk margins to supplement the central estimate of the liabilities. | ||
We have, however, provided sensitivity tests on the central estimate of the liabilities based upon a range of different scenarios. This has been addressed in Section 13. |
Page 9
We note in this context that the Final Funding Agreement envisages the ongoing financing of the Special Purpose Fund is to be based on a central estimate approach and that the Annual Actuarial Report should provide a Discounted Central Estimate valuation. | ||
1.3.5 | Cost savings | |
Our 30 September 2006 liability assessment includes an allowance for an estimate of the future cost savings anticipated from the procedural reforms in NSW arising from the enactment of the DDT Act 2005 in NSW. | ||
The DDT Act 2005 was introduced following the NSW Government Review which was conducted by Mr Laurie Glanfield AM, Director-General of the Attorney Generals Department and Ms Leigh Sanderson, Deputy Director-General of the Cabinet Office. The DDT Act 2005 became an Act on 26 May 2005 and became effective on 1 July 2005. | ||
Our report makes allowance for the estimated future impact of the DDT Act 2005 applying in NSW and for the cost savings that have already emerged to date, whether as a result of cost savings initiatives implemented by ACS or the impact to date of the DDT Act 2005. | ||
We have also been asked to quantify the potential impact if reforms similar to the DDT Act 2005 are applied in the other States. Throughout this report we refer to Australia-wide or DDT Act 2005 applying nationally in this regard. | ||
We note that technically and legally the DDT Act 2005 cannot apply in the other States and readers should note that our comments are a short-hand way of expressing the impact of the application, where appropriate, of similar reforms to those enacted under the DDT Act 2005. | ||
A further review of the Dust Diseases Claims Resolution Process has recently been announced (the Current Review), with the Current Review again being conducted by Mr Laurie Glanfield AM, Director-General of the Attorney Generals Department and Ms Leigh Sanderson, Deputy Director-General of the Cabinet Office. The closing date for submissions is 24 November 2006. | ||
At this stage, we have made no allowance for any potential impact of the Current Review to reduce legal costs further than the extent to which reductions were envisaged at the time of the introduction of the DDT Act 2005. |
Page 10
1.4 | Areas of potential exposure not included | |
As identified in Section 1.3, there are other potential sources of claims exposure beyond those directly considered within this report. However, while many of them are possible they are by no means certain and in a number of cases they are unquantifiable even if they have the potential to generate claims. This is especially the case for those sources of future claim where there has been no evidence of claims to date. | ||
Areas of potential changes in claims exposure we have not explicitly allowed for in our valuation include: |
| Future significant individual landmark and precedent-setting judicial decisions; | ||
| Significant medical advancements; | ||
| Unimpaired claims, i.e. claims for fear, stress, pure nervous shock or psychological illness; | ||
| A change in the basis of compensation for asymptomatic pleural plaques for which no associated physical impairment is exhibited; | ||
| A proliferation of third-wave claims, i.e. claims arising as a result of indirect exposure such as home renovation, washing clothes of family members that worked with asbestos, or from workers involved in removal of asbestos or demolition of buildings containing asbestos; | ||
| Changes in legislation, especially those relating to tort reform for asbestos sufferers; | ||
| Introduction of new, or elimination of existing, heads of damage; | ||
| Exemplary and aggravated or punitive damages (being damages awarded for personal injuries caused as a result of negligence or reckless conduct); | ||
| Changes in the basis of apportionment of awards for asbestos-related diseases for claimants who have smoked; | ||
| Any changes to GST or other taxes; and | ||
| Future bankruptcies of other asbestos claim defendants (i.e. other liable manufacturers or distributors). |
Page 11
Nonetheless, some implicit allowance is made in respect of some of these items in the allowance for superimposed inflation included in our liability assessment and to the extent that some of these have emerged in past claims experience. | ||
We have made no allowance for the risk of further development in relation to New Zealand exposures and the rights of claims from New Zealand claimants in Australian courts (as per Frost vs. Amaca Pty Ltd (2005), NSWDDT 36 although we understand this decision has now been successfully appealed in the NSW Court of Appeal but an application for Special Leave to Appeal has been granted) nor for the risk of additional exposures from overseas. This is because, as noted in Section 1.3, the Special Purpose Fund will not meet the cost of these claims as they are Excluded Claims. | ||
We discuss these matters further in Section 3.2.1. | ||
1.5 | Data reliances and limitations | |
KPMG Actuaries has relied upon the accuracy and completeness of the data with which it has been provided. KPMG Actuaries has not verified the accuracy or completeness of the data, although we have undertaken steps to ensure its consistency with data previously received. However, KPMG Actuaries has placed reliance on the data previously received, and currently provided, as being accurate and complete in all material respects. | ||
Our assessment of the asbestos-related disease liabilities of the Liable Entities does not have regard to the way in which the liabilities may be funded by James Hardie or the Special Purpose Fund. Depending on how the liabilities are funded or financed, including the earnings experience of any assets held to back the liabilities, the ultimate cost of meeting the liabilities may vary significantly from the liability amounts shown in this report. | ||
1.6 | Uncertainty | |
It must be understood that estimates of asbestos-related disease liabilities are subject to considerable uncertainty. This is due to the fact that the ultimate disposition of future claims, will be subject to the outcome of events that have not yet occurred. Examples of these events, as noted in Section 1.4, include jury decisions, court interpretations, legislative changes, epidemiological developments, medical advancements, public attitudes, potential third-wave exposures and social and economic conditions such as inflation. |
Page 12
It should therefore be expected that the actual emergence of the liabilities will vary, perhaps materially, from any estimate. Thus, no assurance can be given that the actual liabilities of the Liable Entities to be met by the Special Purpose Fund will not ultimately exceed the estimates contained herein and that any such variation may be significant. | ||
Nonetheless, we provide our best estimates based on our current expectations of future such events. | ||
1.7 | Distribution and use | |
The purpose of this report is as stated in Sections 1.2 and 1.3. This report should not be used for any purpose other than those specified. | ||
This report is to be provided to the Board of James Hardie. We also understand this report will be provided to other professional advisers to James Hardie, and to PricewaterhouseCoopers in their capacity as auditors to James Hardie. | ||
A copy of the report will also be provided to the MRCF and ACS. | ||
KPMG Actuaries notes that this report will also be provided to the NSW Government and its advisers. | ||
We understand that this report will be filed with the ASX and placed on James Hardies website in its entirety. | ||
KPMG Actuaries provide our consent for this report to be made available to the above-mentioned parties and for the report to be distributed in the manner described above. | ||
To the extent permitted by law, KPMG Actuaries will not be responsible to third parties for the consequences of any actions they take based upon the opinions expressed within this report, including any use of or purported reliance upon this report not contemplated in Sections 1.2 and 1.3. | ||
Where distribution of this report is permitted by KPMG Actuaries, the report may only be distributed in its entirety and judgements about the conclusions and comments drawn from this report should only be made after considering the report in its entirety and with necessary consultation with KPMG Actuaries. | ||
1.8 | Author of the report | |
This report is signed by Richard Wilkinson, General Insurance Practice Leader of KPMG Actuaries, a Fellow of the Institute of Actuaries (London) and a Fellow of the Institute of Actuaries of Australia. |
Page 13
This report is co-signed by Neil Donlevy, a Director of KPMG Actuaries, a Fellow of the Institute of Actuaries (London) and a Fellow of the Institute of Actuaries of Australia. | ||
1.9 | Professional standards and compliance | |
This report details a valuation of the outstanding claims liabilities of entities which hold liabilities with features similar to general insurance liabilities as a self-insured entity, and which has purchased related insurance protection. | ||
This report complies with the current version of Professional Standard 300 of the Institute of Actuaries of Australia (PS300), Actuarial Reports and Advice on General Insurance Technical Liabilities. The effective date of the current version of PS300 is April 2002. | ||
However, as we note in Section 1.3, this report does not include an allowance for the future Operating Expenses of the Liable Entities or the Special Purpose Fund and nor does it include any allowance for a risk margin to reflect the inherent uncertainty in the liability assessment. |
Page 14
2 | EXPOSURE HISTORY OF JAMES HARDIES FORMER SUBSIDIARIES1 | |
2.1 | Overview | |
In 1916, James Hardie opened its first asbestos factory at Camellia in Sydney. Between 1916 and 1987, James Hardie and its subsidiaries produced and developed a variety of products containing asbestos including: |
| Cement pipes; | ||
| Cement sheeting and building products; | ||
| Lagging and other insulation products; and | ||
| Brake linings and other friction products. |
2.2 | Baryulgil mining activities2 | |
Asbestos Mines Pty Limited owned and operated a small chrysotile (white asbestos) mine at Baryulgil NSW. We understand the history of the Baryulgil mine to be briefly as follows: |
1940
|
Wunderlich Ltd begins developing the asbestos deposits. | |
1944
|
Wunderlich Ltd and James Hardie & Coy (now Amaca Pty Ltd) commence a joint venture to operate the mine at Baryulgil in the name of Asbestos Mines Pty Ltd. | |
1953
|
James Hardie & Coy purchases the remaining 50% interest in Asbestos Mines Pty Ltd from Wunderlich Ltd. | |
1954
|
Ownership of Asbestos Mines Pty Ltd is transferred to James Hardie Asbestos Ltd (subsequently renamed James Hardie Industries Ltd and now known as ABN60) | |
1976
|
Asbestos Mines Pty Ltd, later Marlew Mining Pty Ltd (now in liquidation), is sold by James Hardie Asbestos Ltd to Woodsreef Mines Ltd, which continued to operate the mine. | |
1979
|
Woodsreef ceased mining operations at Baryulgil. |
1 | This section is substantially based on a paper submitted to the Special Commission of Inquiry and was included as the Special Commission of Inquiry Appendix J, Paper entitled James Hardie and Asbestos (15 January 2001) prepared by Mr Wayne Attrill, a former employee of James Hardie Industries Ltd. | |
2 | This section is substantially based on the press release from James Hardie dated 24 March 2005 and on workforce statistics and information we were provided with. |
Page 15
Page 16
The chart shows that there were up to 40 people working in the mine each year, and an overall average of 20-25 people, which is consistent with the commentary provided by James Hardie. The database also shows that there were about 350 workers who ever worked at the mine. This implies that over the 35 year period, the average length of service was about 2 years per individual. However, we note that there are some workers who worked at the mine for only a matter of weeks. | ||
2.3 | Asbestos cement | |
Production of asbestos cement based products was James Hardie & Coys primary business. The products it produced came in the form of building products and asbestos cement pipes. | ||
Production of asbestos cement pipes began in 1926 but the use of asbestos cement pressure pipes for water and sewerage use did not become widespread until autoclaving of pipes was introduced in the early 1950s. | ||
Prior to the mid-1980s, James Hardie & Coy manufactured flat and corrugated asbestos cement sheets for internal and external wall cladding in buildings and for roofs, and asbestos cement water and sewer pipes. | ||
The major fibre used in the manufacture of asbestos cement products was chrysotile. | ||
Amosite (brown asbestos) was not used in James Hardie & Coy products until the 1950s, and small quantities of amosite continued to be used in asbestos cement products until about 1980. | ||
James Hardie & Coy also used crocidolite (blue asbestos) in pressure pipes and building products, such as roofing products, from the mid-1950s until about 1968. The crocidolite was sourced from the CSR mine at Wittenoom. | ||
Asbestos content of pipes was approximately 15% of which about 12% was chrysotile and the remainder amosite. During the period 19561968, crocidolite was also used (about 2%). | ||
The asbestos content of James Hardie & Coys asbestos cement sheet ranged from 8% to 15%, and was predominantly chrysotile with small amounts of amosite and crocidolite, with crocidolite only used up to 1968. | ||
2.4 | Insulation products | |
Asbestos containing insulation products were first manufactured by James Hardie & Coy in the 1930s, and by the 1950s James Hardie & Coy had established itself in the market with a product called 85% Magnesia. |
Page 17
In 1964 James Hardie & Coy formed a joint venture with CSR and Bradford Insulation known as Hardie-BI Company to make and market insulation products. | ||
Major products produced were 85% Magnesia and K-Lite. Both products contained about 15% amosite. The partnership was dissolved in 1974 and James Hardie & Coy ceased production of asbestos thermal insulation products at that time. | ||
2.5 | Brake linings | |
James Hardie & Coy had initially entered the brakes and friction products market in the early 1930s and had a well-established business by 1950 under the brand name Five Star. | ||
In 1963 James Hardie & Coy entered into the Hardie-Ferodo joint venture with Ferodo of the UK. Hardie-Ferodo carried out considerable product development work, particularly with regard to railway rolling stock brakes. The partnership dissolved in 1978 and the business was renamed Better Brakes (and later became known as Jsekarb). | ||
Jsekarb manufactured brake linings for motor vehicles, railway wagons and locomotives, and ceased using asbestos in their manufacturing process in 1987. | ||
The only asbestos used in friction products was chrysotile. |
Page 18
3 | AREAS OF POTENTIAL EXPOSURE | |
3.1 | Overview | |
In Section 1.4, we identified some sources of potential exposure that may not explicitly, or implicitly, be factored into our valuation. The impact of the emergence of these might be to increase, or decrease, the future number of claims or the overall costs in relation to the liabilities of the Liable Entities. | ||
3.2 | Potential changes to the number of future claims | |
3.2.1 | Overseas exposures | |
Whilst overseas exposures remain a source of potential exposure for the Liable Entities, they will not impact the liabilities of the Liable Entities to be met by the Special Purpose Fund as the Special Purpose Fund will not meet claims relating to: |
| Exposure to asbestos to the extent it took place overseas; and/or | ||
| Claims made overseas relating to asbestos exposure (regardless of the place of exposure). |
We note, in any event, that there have been few claims reported to date and that it is currently envisaged that the number of claims from overseas exposures should remain low given the significantly lower levels of asbestos products produced by the Liable Entities which were exported overseas | ||
3.2.2 | Third-wave claims | |
We have made some implicit allowance for so-called third-wave claims. These are claims for personal injury and / or death arising from asbestos exposure during home renovations by individuals or to builders involved in such renovations. Such claims are allowed for within the projections to the extent to which they have arisen to date and to the extent our exposure model factors in such tertiary exposures in its extrapolation. | ||
Nonetheless, we have not allowed for a surge in such claims in the future arising from renovations, but conversely we have not allowed for a tempering of those third-wave claims included within our projection as a result of improved education of individuals of the risks of such home renovations, or of any local Councils or State Governments passing laws in this regard. |
Page 19
However, it should be noted that claims for the cost of asbestos or asbestos product removal from homes and properties or any claims for economic loss arising from asbestos or asbestos products being within such homes and properties will not be met by the Special Purpose Fund. | ||
3.2.3 | Unimpaired claims | |
Unimpaired claims are claims made by plaintiffs where the plaintiff does not exhibit any physical symptoms of injury or damage. This would include claims for fear and stress. | ||
In the case of Thompson vs. CSR (NSWDDT 7/2003), the estate of Mr Thompson made a retrospective claim for fear of contracting mesothelioma 14 years before onset. In this case, Judge OMeally ruled that the fear was not compensable. The NSW Court of Appeal ((2003) 59 NSWLR 77) upheld that fear was not compensable. | ||
This case was appealed by the estate of Mr Thompson to the High Court of Australia (where it became CSR vs. Eddy) but the issue of whether fear was compensable was not the subject of that appeal. | ||
We have not allowed for the admissibility of unimpaired claims within the Australian Court system. | ||
3.2.4 | Pure nervous shock claims | |
Pure nervous shock claims are claims which are unrelated to an underlying disease. Where there is a psychiatric illness, general damages may be payable and economic loss may also be payable where the inability to work is a result of the psychiatric illness. | ||
In Western Australia in October 2004, an appeal case concerning Arturo Della Maddalena, a past employee of CSR at Wittenoom mine was heard. Mr Della Maddalena worked at Wittenoom, owned by CSR, from 1961 until it closed in 1966. During this period he was exposed to blue asbestos dust. | ||
An investigation of 42 of Mr Della Maddalenas former workmates found 39 of them had died from asbestos-related diseases. | ||
In the first Court hearing, the primary judges determination was that he did not accept there to be evidence of psychiatric illness, or evidence that it arose from asbestos exposure. | ||
However, on appeal the second judge rejected the primary judges decision as to the acceptability of the evidence placed before him. The Court of Appeal accepted Mr Maddalenas claim for psychiatric illness. |
Page 20
The defendants to the claim appealed the case to the High Court of Australia on two narrow points of law: |
| Whether an appellate court is entitled to substitute its own findings as to the credibility of a witness for that of the trial judge; and | ||
| Whether the appellate court had breached procedural fairness in expressing a preference for evidence of a particular expert witness described as being well known to the Court. |
On 2 February 2006, the High Court of Australia ordered that a new trial be held, so it is possible that further judicial consideration will be given to this question if the matter is put before the courts again. | ||
To the extent that other such cases arise in the future, in many cases they would likely represent a bringing forward of some future eventual claims, rather than outright additional claims. | ||
We have assumed that stress or fear from potential exposure, which is not accompanied by a disease, will not result in a material additional net cost of claims for compensation. | ||
3.2.5 | Pleural plaques | |
Pleural plaques are formations of scarred tissue which form on the inside of the chest wall. They are usually benign and take about 20 years to emerge following exposure to asbestos but symptoms are rarely associated with pleural plaques. Current medical opinion is that pleural plaques do not shorten life and that their existence does not increase the possibility of developing an asbestos-related disease but rather acts as an indicator that exposure to asbestos has taken place. | ||
If an individual presents benign pleural plaques without any demonstrable physical impairment, the individual would not currently be compensated within Australia for the existence of pleural plaques (see for example Torrens vs. James Hardie [1990] NSWDDT 6). | ||
Pleural plaques which are associated with a certain level of physical impairment, such as reduced total lung capacity or forced vital capacity, diffuse pleural thickening or where the plaques cause pain could be compensated within Australia (see for example Abraham vs. Wallaby Grip & Ors [2006] NSWDDT 22). | ||
Our liability assessment makes no allowance for benign pleural plaque claims without any associated physical impairment. |
Page 21
In relation to pleural plaques with associated physical injury, such claims have arisen in the past and are included within our disease category ARPD & Other. Accordingly, we have allowed for these within our liability assessment based on past experience of such claims activity. | ||
3.3 | Potential changes to claims costs | |
3.3.1 | Legal environment | |
We have not explicitly allowed for the emergence of new heads of damage or the significant extension of current heads of damage, or for any overturn or restriction of current heads of damage. | ||
However, allowance for these is, in part, implicit within the rate of superimposed inflation we have assumed. | ||
3.3.2 | Sullivan vs. Gordon | |
The decision in Sullivan vs. Gordon (1999) 47 NSWLR 31, [1999] NSWCA 338 allowed a plaintiff to claim compensation for the value of the services which the plaintiff could no longer perform to family members as a result of their injury, incapacity and/or death. | ||
Benefits could be claimed for past and future loss, including post-death gratuitous services, based on a normal life expectancy of the individual and not to the actual date of death. | ||
On 21 October 2005, the High Court of Australia passed down its decision in CSR vs. Eddy [2005] HCA64 in which it overruled Sullivan vs. Gordon and determined that such losses, if compensable, would already be compensated as general damages rather than being compensable as a separate head of damage. The High Court accordingly reduced the claim from $465,899 to $300,419 (a reduction of $165,480). | ||
Since that decision, there has been legislative action to restore the entitlement to Sullivan vs. Gordon benefits. | ||
In South Australia, the Dust Diseases Act 2005 (SA) Bill established an entitlement by the claimant to claim for Sullivan vs. Gordon benefits as a separate head of damage. | ||
Prior to the legislation, these benefits were not accepted under common law and no such damages were payable. Accordingly, the legislation will likely result in an increase in awards in South Australia. |
Page 22
In relation to the South Australian legislation, we have allowed for the estimated impact upon future awards of the revised legislation by reference to anecdotal estimates of the level of Sullivan vs. Gordon benefits, in part based on experience of such damages in NSW. | ||
The NSW Government introduced changes to the Civil Liability legislation (Civil Liability Amendment Bill 2006) which had the effect of overturning the CSR vs. Eddy decision and reinstating Sullivan vs. Gordon benefits in relation to dust diseases compensation, albeit at levels which are reduced relative to those which existed prior to the CSR vs. Eddy decision, owing to the inclusion of a minimum hours threshold of 9 hours per week and maximum hourly rate. | ||
Our approach has been to make no allowance for the potential savings that could result from the decision in CSR vs. Eddy owing to the introduction of the changes to the Civil Liability legislation by the NSW Government. We have therefore assumed that Sullivan vs. Gordon benefits are reinstated in NSW. | ||
Whilst it is possible that some future savings may result in NSW from the imposition of thresholds, an estimate of such savings is currently too subjective and not yet quantifiable and, in the context of the overall size of the liabilities, not material. | ||
In Queensland and Victoria, legislation assumes that Sullivan vs. Gordon benefits are available under common law. In ACT, there already exists a statutory entitlement to Sullivan vs. Gordon benefits. | ||
3.3.3 | Dust Diseases Board and Other Reimbursements | |
There exists a right under Section 8E (Reimbursement Provisions) of the Dust Diseases Act 1942 for the NSW Dust Diseases Board (DDB) to recover certain costs from common law defendants, excluding the employer of the claimant. | ||
This component of cost is implicitly included within our liability assessment as the claims awards made in recent periods and in recent settlements contain some allowance for DDB reimbursement where applicable. Furthermore, currently reported open claims have allowance within their case estimates for the costs of DDB reimbursement where relevant and applicable. | ||
The Final Funding Agreement indicates that the Special Purpose Fund is intended to meet Personal Asbestos Claims and that claims by the DDB or a Workers Compensation Scheme for reimbursement will only be met up to a certain specified limit, being: |
Page 23
| In the first financial year of the Special Purpose Fund a limit of $750,000 will apply; | ||
| In respect of each future financial year, that limit will be indexed in line with the Consumer Price Index; | ||
| There will be an overall aggregate cap of $30m. |
Owing to the inclusion of past DDB payments in historic claims data, and given the absence of sufficiently detailed head of damage claim data to separate the components of past DDB reimbursements from historic claims awards, it is impractical for us to separately model this component of claims cost within our liability assessment by direct assessment. | ||
We have therefore estimated the component of product and public liability claims awards which relate implicitly to DDB reimbursements by approximate methods. | ||
In arriving at our estimate of the allowance contained within the historic claims data for the DDB reimbursement costs, we have considered the following facts: |
| The proportion of claims which are heard in NSW is currently around 45%; | ||
| Of this, 36% relate to claims with some form of exposure in NSW; | ||
| In addition, 2% of all claims have NSW exposure but are heard in other States at present; | ||
| Therefore approximately 38% of all claims relate to NSW exposure; | ||
| We cannot ascertain with certainty the proportion of these claims that will involve a worker claim or will involve subrogation from the DDB. However, it is likely that most worker-related claims will have entered the DDB first and received statutory compensation. We have estimated that 50% of all NSW exposure claims will be worker claims and have received compensation in the DDB. This is based on consideration of the relative size of the NSW workforce to the NSW population and recognition that the DDB does not provide compensation to: |
§ | Claimants whose exposure did not arise during their employment (non-occupational exposures); and | ||
§ | Claimants whose exposure took place outside NSW. |
Page 24
| The average DDB payment by the Liable Entities on recent mesothelioma claims with a DDB payment, and on open claims with a DDB reserve, is $25,000 per claim. That is, around 8% of the claim cost of a typical mesothelioma claim. |
Accordingly, we have assessed the reimbursement component as 1.5% of gross product and public liability claims costs, being 38% x 50% x 8%. | ||
We have calculated the implicit reimbursement component otherwise included within our liability assessment and applied the capping rules outlined above to determine the projected payments in relation to reimbursements that will be met by the Special Purpose Fund. | ||
The cashflow and liability figures contained within this report have already removed that component of reimbursements that will not be met by the Special Purpose Fund. We estimate that the reimbursement amounts, without any cap, have a net present value of $23.5m but that $8.2m of this will not be met by the Special Purpose Fund owing to the capping rules outlined above. | ||
3.3.4 | Exemplary and aggravated or punitive damages | |
To date, there have been no awards for exemplary or punitive damages against the Liable Entities as a result of asbestos-related disease claims. | ||
To the extent that such awards are possible and could arise in the future such awards would increase the liability assessment. | ||
Of particular note is the South Australian legislation, The Dust Diseases Act 2005 (SA) Bill, which directs the Courts to consider exemplary damage awards. | ||
We have made some allowance for the potential for exemplary damages awards in South Australia through our assumed average award size. This has been based on anecdotal evidence and views as to the potential size of exemplary awards were such awards to be made. | ||
However, we note that in relation to the potential for exemplary damage awards in other States, the liability that could arise, or would arise were such claims to eventuate, is unquantifiable and has not been included in our liability assessment. |
Page 25
3.3.5 | Smoking-related diseases | |
There have been some notable cases involving the emergence of lung cancers from people with asbestos exposure but who have also smoked cigarettes. | ||
There are two prevailing views of the interaction of smoking and asbestos exposure: |
| That the emergence of asbestosis is a necessary precursor to lung cancer caused by asbestos exposure (the necessary precursor hypothesis as put forward by Hans Weill amongst others). | |
| That providing there has been exposure to asbestos sufficient to cause asbestosis it is reasonable to attribute a causal contribution to the asbestos exposure (the fibre burden hypothesis). |
It is generally accepted that the risk of developing cancer after asbestos exposure is increased in the case of a smoker (see papers by Sir Richard Doll in 1985 amongst others). | ||
In McDonald vs. State Rail Authority (1998) (16 NSWCCR 695), the judgement made by Judge OMeally was that carcinoma of the lung may be attributed to asbestos exposure in the absence of asbestosis where the exposure was sufficient to have caused asbestosis. | ||
In this case, Judge OMeally further noted that the Helsinki Criteria set this at 25 fibre/mL-year. | ||
However, Judge OMeally ruled for the defendants in relation to compensation owing to the absence of evidence that the 25 fibre/mL-year threshold had been exceeded. | ||
In Judd vs. Amaca (2002) (NSWDDT 25), there were challenges by the defendants to the McDonald decisions as to the incidence of lung cancer being related to asbestos exposure even in the absence of asbestosis. They did not succeed in that regard. | ||
What minimum exposure is sufficient to cause asbestosis is not an issue that was decided. It will therefore be necessary for future plaintiffs to prove at hearings what exposure is capable of causing asbestosis | ||
We have continued to assume that the precedents set in Judd and McDonald will continue and also that the thresholds required to attribute lung cancer to asbestos exposure will be maintained. In these circumstances we have assumed continuation of the current level of awards for lung cancer claims. |
Page 26
3.3.6 | Future bankruptcies | |
As bankruptcies and insolvencies amongst defendants occur, there is a concentration of the costs of claims amongst a decreasing pool of defendants. This would be expected to lead to an increase in the proportion of claims borne by each of the remaining solvent defendants. | ||
Allowance might be made for such bankruptcies by way of using general credit risk methods, or by reduction in the discount rate, but such allowance would require a full model of the liabilities of Australia by entity, including the interactions between entities. This is not adequately determinable at present. | ||
Consequently, within our central estimate assessment, we have not allowed for the future failure of any of the substantial asbestos defendants, insurers or governments who bear a share of the asbestos-related liabilities of Australia. | ||
3.3.7 | BHP vs. Schultz | |
On 7 December 2004, the High Court of Australia passed down its findings in relation to the matter of BHP vs. Schultz [2004] HCA 61. | ||
Mr Schultz, who worked and resided in South Australia, had worked at BHPs Whyalla shipyard from 1957 to 1964 and 1968 to 1977. He was diagnosed with asbestosis and ARPD. In 2002 he commenced proceedings in the NSW DDT against BHP in relation to his asbestosis and pleural disease. | ||
BHP unsuccessfully applied to the Supreme Court to move the matter from the DDT into the Supreme Court under the Cross-Vesting Act and to then transfer it into South Australia Supreme Court under Section 5 of the Act. | ||
Under section 5 of the Cross-Vesting Act, the court in which proceedings are to be determined is dictated by the interests of justice. BHPs application was refused and they thereafter appealed to the High Court. | ||
The High Court unanimously allowed the appeal. It held that the emphasis given to Mr Schultzs choice of State in which the claim was to be heard involved error in the application of section 5 of the Cross-Vesting Act. They ruled that Mr Schultzs case should be removed from the DDT into the Supreme Court and then transferred to the South Australia Supreme Court as the appropriate State in which the claim should be heard. | ||
As such, the law of South Australia was deemed to be the substantive law which would govern Mr Schultzs claim. |
Page 27
One consequence of the Schultz case is that it is now expected that a number of cases which would, until recently, be heard in the NSW DDT are likely in future to be heard in other jurisdictions. | ||
We would not expect the Schultz case to give rise to more, or fewer, claims in itself but rather change the profile of the Courts in which claims are heard and might potentially result in slight cost savings as, on average, settlement costs in NSW have historically been slightly higher than in other States. However, we have observed that award sizes appear to be harmonising across a number of States and we have therefore not factored in any savings from the application of the Schultz decision. | ||
3.3.8 | Frost vs. Amaca | |
In the case of Frost vs. Amaca Pty Ltd (2005) NSWDDT 36, Curtis J held that the place of tort was New South Wales whilst the residency of the plaintiff was New Zealand and the exposure took place in New Zealand. This claim was notified to Amaca in 2002 and the judgment was entered on 17 August 2005. | ||
The decision was appealed to the NSW Court of Appeal on 3 May 2006 and the judgment was handed down on 4 July 2006. | ||
The Court of Appeal unanimously determined in favour of Amaca. | ||
An application for Special Leave to appeal to the High Court of Australia has been made by the solicitors of the plaintiff but no date has yet been set for the hearing of the application. | ||
At this valuation, we have made no allowance for the potential impact of New Zealand claims, based on the unanimous decision of the Court of Appeal. | ||
If the Court of Appeal decision were overturned, plaintiffs exposed in New Zealand would be able to bring claims in Australia and this may increase the size of the liabilities to be met by the Special Purpose Fund. | ||
3.4 | Medical developments | |
Medical developments have the potential to affect claim costs, although it is uncertain as to whether such developments would likely increase or decrease claims costs. In these circumstances, we have taken what we believe to be a central estimate view. | ||
For example, there may be drugs developed which increase costs and extend life without curing mesothelioma: this might increase overall claim amounts. On the other hand, a total cure for mesothelioma would be more likely to reduce overall claim amounts. |
Page 28
Examples of drugs or treatments that are currently (or may be) used for people diagnosed with mesothelioma include: |
| Alimta; | ||
| Coramsine; | ||
| Surgery; and | ||
| Radiotherapy or Chemotherapy. |
Additionally, there continue to be new blood tests developed which may give rise to earlier diagnosis of mesothelioma (e.g. SMRP serum). Such tests have the potential to result in a change in the pattern of reporting of future claims by accelerating diagnosis of these claims. Furthermore depending on how the courts would treat claims settlement in relation to these earlier diagnoses, it could also be associated with a change in the profile of claims payments. | ||
At this stage there is no evidence of the success of any treatments to cure mesothelioma, or of SMRP to provide earlier diagnosis. | ||
Accordingly, we have made no allowance for the potential impact of such diagnostic or medical developments within the current valuation. |
Page 29
4 | DATA | |
4.1 | Data provided to KPMG Actuaries | |
We have been provided with the following information by the MRCF and ACS: |
| MRCF claims database at 30 September 2006 with individual claims listings; | ||
| MRCF accounting database at 30 September 2006 (which includes individual claims payment details); | ||
| MRCF Monthly Management Information Reports to 30 September 2006; | ||
| MRCF Home Renovator Reports at various dates; and | ||
| Detailed insurance bordereaux information (being a listing of claims filed with the insurers of the Liable Entities) provided by ACS as at 30 September 2006. |
Additional to this, we have been granted access to the General Manager and the Information Officer of ACS. They have made themselves available to provide insight into the data, answer questions that we have had in relation to the interpretation of the data, and to discuss trends in emerging experience and any matters which we have observed arising during the most recent financial year. | ||
We have allowed for the benefits of the product and public liability insurance policies of the Liable Entities based on information provided to us by the MRCF relating to the insurance programmes structure, coverage and layers. | ||
We have also considered the
claims data listings which formed the basis of our previous valuation assessments. |
||
We have been provided with a report by DSA Legal and Pattison Hardman (The Second Cost Consultants Report) which was dated 15 July 2005. |
Page 30
4.2 | Data limitations | |
We have tested the consistency of the various data sets provided to us at different valuation dates, as noted in Section 4.3 which outlines the nature of the testing and verification process undertaken. However, we have not otherwise verified the data and have instead relied on the data provided as being complete and accurate in all material respects. We have relied upon the robustness of the MRCFs and ACS operational processes and systems as to the completeness of the data provided. | ||
Consequently, should there be material errors or incompleteness in the data, our assessment could also be affected materially. | ||
Certain data that would be relevant to our analysis and liability assessment is not readily available. This includes: |
| In relation to open claims, the payment and case estimate history collected is not sufficient to allow us to track the development, or otherwise, of historic case estimates. This would allow us to determine a ground up incurred claims assessment as a cross-check and input to our calculations. | ||
| The available history of James Hardies products, such as the number of products by type, the extent of asbestos content within them and the parties who then used those products is limited. Whilst some history exists, such information is not complete, given that exposures relate back as far as the late 1930s. A reliable, complete history would provide assistance in assessing the pattern of future claims notifications arising from asbestos exposure and provide further support to the actuarial assessments. | ||
| We do not have access to detailed information in regards to the timing and form of the Health and Safety Standards implemented by James Hardie or other companies which might go towards reducing the extent of claims in future periods. Again, given the long period over which exposure took place (since the late 1930s), an incomplete history of such standards is not unexpected. Furthermore, we are not aware of any studies which have as yet been able to robustly quantify the impact of the changing standards upon future claims incidence. | ||
| The claims cost data is not split by individual component of award, i.e. heads of damage, which would enable increased understanding of the drivers of claim costs and inflation for individual award components (e.g. Griffith vs. Kerkemeyer, Sullivan vs. Gordon). |
Page 31
| Some of the date fields (e.g. date of birth, date of death) are not complete for all claimants. These would allow better analysis for the actuarial valuation if they were complete. However, the proportion of claims with complete data is increasing with time. | ||
| In addition to these data restrictions, we note that the historic data changes from year to year. Sometimes this is due to re-classification of disease types; other times we understand it is due to inherent operational processing delays. Both of these causes are common for all claims administration systems. We have undertaken investigations to understand these movements in order to satisfy ourselves as to the causation of the moving data and we address them in the body of this report. |
4.3 | Data verification | |
We have undertaken a number of tests and reconciliations to verify the accuracy of the data to the extent possible, noting the limitations outlined above. | ||
4.3.1 | Reconciliation with previous valuations data | |
We have performed a reconciliation of the claims database as at 30 September 2006 with that provided at 28 February 2006. | ||
We have reviewed the consistency of a number of key fields, on a claim-by-claim basis, including: |
| Claim notification date; | ||
| Claim settlement dates; | ||
| Disease type; and | ||
| Settlement amounts (award and legal costs separately). |
We note that there are some movements in the data between valuations. There are some movements in the notification date of claims, the settlement date of claims, and in the disease diagnosed. The following summarise the results of that reconciliation process: |
| 3 claims have changed their date of reporting, with 2 of them changing the financial year in which they were reported; | ||
| 17 claims have changed their disease type, including 6 which have changed their disease type to mesothelioma; and | ||
| 8 claims have changed their settlement date. |
Page 32
We understand that a change in disease type is often due to the data being updated over time, often as more information comes to light as to the nature of the disease, or through the correcting of any previous data errors which have emerged. | ||
Changes in the date of settlement can often arise because the previous settlement date recorded relates to the settlement with some, but not all, parties to the claim and that this information is updated when all parties have settled. | ||
As such, changing data is not unexpected or to be considered as adverse. At this valuation, we have continued to note that new claim records have been created in respect of some historic claims and some claim numbers have changed, with 23 new claim records having been created. We understand these changes have been made to aid operational procedures in regard to pursuing cross-claims recoveries for individual claims. |
||
The effect of this operational change is to increase the numbers of claims reported relative to those quoted in our previous valuation report (although it should be noted that the effect is small and varies by individual claim year). | ||
A consequential effect of this is that the average cost of claims shows some compensatory reductions and nil settlement rates have also reduced. | ||
We have identified these changes, discussed and reviewed them in conjunction with ACS and considered the extent of their impact on the data. Overall, the effect of this change is minimal in the context of the overall liability assessment. | ||
4.3.2 | Reconciliation between claims and accounting databases | |
We have compared the claims awards, the legal costs and the recoveries amounts between the claims database and the accounting database from the earliest date to the current file position. Table 4.1 shows the results of this reconciliation for all claims to date. |
Page 33
Claims | Accounting | |||||||||||||||
database | database | Difference | Difference | |||||||||||||
$m | $m | $m | % | |||||||||||||
Gross settlement
amounts |
404.1 | 402.2 | 1.9 | 0.5 | % | |||||||||||
Cross claim
recoveries |
(13.3 | ) | (12.3 | ) | (1.0 | ) | 8.1 | % | ||||||||
Net settlement
amounts |
390.8 | 389.9 | 0.9 | 0.2 | % | |||||||||||
Legal fees (defence
costs, plus plaintiff
costs when claims
settled on exclusive
basis) |
N/A | 77.1 | N/A | N/A | ||||||||||||
Estimated insurance
recoveries |
N/A | (54.1) | * | N/A | N/A |
* | This includes $18.5m which is not allocated to individual claim records (e.g. because of commutation or scheme of arrangement payment or from payments from the QBE settlement.) |
Page 34
4.3.3 | Data issues |
Page 35
| The average total settlements have shown a higher rate of increase than previously believed (i.e. evidence of higher market-wide inflationary trends); | ||
| The contribution rates have been lower than previously recorded. |
| No change to the base average cost borne by the Liable Entities as this data is not affected; | ||
| Lower contribution rate assumptions prospectively reflecting the impact of past over-statement of contribution rates; and | ||
| Higher rates of future claim inflation, in particular superimposed inflation, have been assumed. This matter is addressed in more detail later in this report. |
4.4 | Data interpretation and analysis |
4.4.1 | Grouping of claims data |
| Product and Public Liability; | ||
| Workers Compensation, being claims by current and former employees of the Liable Entities; | ||
| Wharf claims; and | ||
| Cross-claims, being claims brought by, or against, one or more Liable Entities. |
4.4.2 | Categorising a disease |
Page 36
| Mesothelioma; | ||
| Lung cancer / Other cancer; | ||
| Asbestosis; and then | ||
| ARPD and Other. |
4.4.3 | Claims included as reported claims |
| Cross-claims brought by the Liable Entities against other defendants. Where the cross-claim is brought as part of the main proceedings the claim is automatically counted in our analysis of the number of claims. However, where the cross-claim by the Liable Entities is severed from the main proceedings, the existence of a separate record on the claims file does not indicate an additional claim (or liability against the Liable Entities). In these circumstances such claims records are not counted in our analysis. | ||
| Claims with a blank report year. These are in the nature of provisional loss advices and are only included once a date of notification has been allocated to the claims. At 30 September 2006, there are four claims with no report date. All of these claims appear to have been settled, with the total settlement amount incurred by the Liable Entities being less than $100,000. |
Page 37
4.4.4 | Defining claim status |
| The plaintiff settling their award (plaintiff settlement date); | ||
| The defendant company settling their share of the award (client settlement date); and | ||
| The defendant company finalising their legal costs (client closure date). |
| Open: none of the 3 settlement date fields have information in them. | ||
| Unsettled: the plaintiff has settled their award, but the Liable Entities have not settled their share of the award and not finalised their legal costs. No aspect of the claim is settled or closed from the perspective of the Liable Entities. However, some information is available as to the total settlement which acts as a maximum liability amount. | ||
| Settled: the plaintiff has settled their award and the Liable Entities have settled their share of the award. The Liable Entities have not finalised their legal costs. Only legal costs remain to be finalised. | ||
| Closed: the plaintiff has settled their award, the Liable Entities have settled their share of the award and finalised their legal costs. This claim is finalised. |
4.4.5 | Insurance Recoveries |
Page 38
4.4.6 | Cross claims |
4.5 | The Second Cost Consultants Report: July 2005 |
Page 39
4.6 | Data conclusion |
| The data is generally consistent between valuations, with any differences in the data being readily explained; | ||
| The data appears to reconcile reasonably between the two data sources (the claims database and the accounting database); | ||
| Any data issues that have emerged are not material in relation to the size of the liabilities; and | ||
| The data is therefore appropriate for use. |
Page 40
5 | VALUATION METHODOLOGY AND APPROACH | |
5.1 | Previous valuation work and methodology changes |
5.2 | Overview of current methodology |
| Allowance for the cost of settling claims which have already been reported but have not yet been settled (pending claims); and | ||
| Allowance for the cost of settling claims which have not yet been reported but are expected to arise out of past exposure (Incurred But Not Reported or IBNR claims). |
| Project the future number of claims expected to be reported in each future year by disease type (for product and public liability) and for Workers Compensation and Wharf claims taking into account the past rate of co-joining of the Liable Entities and the expected future incidence of mesothelioma and other diseases; |
Page 41
| Analyse past average attritional claim costs of non-nil claims in current money terms. We have defined attritional claims to be claims which are less than $1m in 2005/06 money terms. We estimate a baseline attritional non-nil average claim cost in 2006/07 (current) money terms. This represents the Liable Entities share of a claim rather than the total claim settlement. For Workers Compensation claims, the average cost represents only that part of a claim which is borne by the Liable Entities (i.e. it excludes any insurance proceeds from a Workers Compensation Scheme or Policy); | ||
| Adjust historic average claim costs to recognise the impact of DDB reimbursements upon the average cost awards (reflecting the basis of the costs which are to be met by the Special Purpose Fund); | ||
| Analyse past historic average plaintiff and defendant legal costs for non-nil claim settlements; | ||
| Analyse past historic average defendant legal costs for nil claim settlements (which includes costs incurred in defending and repudiating liability); | ||
| Estimate a large claims loading for mesothelioma claims by estimating the frequency, or incidence rate, and average claim and legal cost sizes of such claims (being claims which are in excess of $1m in 2005/06 money terms); | ||
| Project the pattern and incidence of future claims settlements from the claims reporting profile projected. This is done by using a settlement pattern derived from consideration of past experience of the pattern of delay between claim reporting and claim settlement for each disease type; | ||
| Estimate the proportion of claims which will be settled with no liability against the Liable Entities by reference to past proportions of claims settled for nil claim cost (we refer to this as the nil settlement rate); | ||
| Inflate average claim, plaintiff and defence legal costs and large claim costs to the date of settlement of claims (for known and IBNR claims) allowing for base inflation and superimposed inflation; | ||
| Multiply the claims numbers which are expected to be settled for non-nil amounts in a period by the inflated average non-nil claim costs and plaintiff and defence legal costs for that period; |
Page 42
| Make allowance in defence legal costs for that proportion of settled claims which are expected to be settled for no liability but for which defence costs will be incurred in disputing liability or contribution; | ||
| Inflate average defence legal costs of nil claims to the date of settlement of claims (for known and IBNR claims) allowing for base inflation and superimposed inflation; | ||
| Multiply the claims numbers which are expected to be settled for nil amounts in a period by the inflated average defence legal costs for nil claims for that period; | ||
| Add the expected payments on pending claims; | ||
| This gives the projected future gross cashflow for each future payment year; | ||
| Estimate the recoveries resulting from cross-claims made by the Liable Entities against other parties (cross-claim recoveries); | ||
| Project Insurance Recoveries to establish the net cashflows; | ||
| Discount the cashflows using a yield curve derived from yields on Commonwealth fixed interest bonds to arrive at our present value liability assessment. |
5.3 | Disease type and class subdivision |
Page 43
| Product or Public Liability; | ||
| Workers Compensation; | ||
| Wharfside Workers; and | ||
| Cross-claims brought by the Liable Entities (specifically to determine the cross-claim recovery rate). |
| Mesothelioma; | ||
| Lung cancer and other cancer (hereafter referred to as lung cancer); | ||
| Asbestosis; and | ||
| Asbestos-Related Pleural Disease and Other (ARPD & Other). |
Page 44
5.4 | Numbers of future claims notifications |
| emerge proportional to past asbestos exposure measured by asbestos consumption per year (in metric tonnage); and | ||
| have a latency pattern that is statistically normally distributed. |
3 | World Mineral Statistics Dataset, British Geological Survey, www.mineralsuk.com |
Page 45
| The historic asbestos consumption shown in Figure 8.8 gives our assumed past asbestos exposure. | ||
| The latency pattern for mesothelioma has a mean of 35 years and a standard deviation of 10 years. This appears to be generally supported by analyses and comments by Professor Berry et al4 , by Jim Leigh et al5 and by Yeung et al6. Latency pattern assumptions for mesothelioma and other diseases have also been set with consideration of the experience to date. |
Mean | ||||||||
(years) | Std Dev (years) | |||||||
Mesothelioma |
35 | 10 | ||||||
Asbestosis |
30 | 10 | ||||||
Lung Cancer |
35 | 10 | ||||||
ARPD & Other |
30 | 11 | ||||||
Wharf |
n/a | n/a | ||||||
Workers Compensation |
n/a | n/a |
4 | Malignant pleural and peritoneal mesotheliomas in former miners and millers of crocidolite at Wittenoom, Western Australia; G Berry, N H de Klerk, et al (2004) | |
5 | Malignant Mesothelioma in Australia: 1945-2000; J. Leigh et al (2002) | |
6 | Distribution of Mesothelioma Cases in Different Occupational Groups and Industries, 1979-1995; P. Yeung, A. Rogers, A. Johnson (1999) |
Page 46
5.5 | Numbers of claim settlements from future claim notifications |
Delay to settlement (years) | |||||||||||||||||||||||||||||||||||||||||||||
No of claims | |||||||||||||||||||||||||||||||||||||||||||||
Reporting Year | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | reported | ||||||||||||||||||||||||||||||||||
1996 |
46 | 78 | 83 | 84 | 84 | 84 | 84 | 84 | 84 | 84 | 84 | ||||||||||||||||||||||||||||||||||
1997 |
64 | 93 | 93 | 95 | 96 | 99 | 99 | 100 | 101 | 111 | |||||||||||||||||||||||||||||||||||
1998 |
57 | 78 | 82 | 84 | 86 | 86 | 89 | 89 | 94 | ||||||||||||||||||||||||||||||||||||
1999 |
50 | 84 | 87 | 88 | 89 | 91 | 93 | 94 | |||||||||||||||||||||||||||||||||||||
2000 |
75 | 112 | 118 | 121 | 121 | 121 | 126 | ||||||||||||||||||||||||||||||||||||||
2001 |
85 | 138 | 145 | 150 | 151 | 161 | |||||||||||||||||||||||||||||||||||||||
2002 |
99 | 161 | 173 | 173 | 179 | ||||||||||||||||||||||||||||||||||||||||
2003 |
102 | 159 | 171 | 187 | |||||||||||||||||||||||||||||||||||||||||
2004 |
141 | 218 | 260 | ||||||||||||||||||||||||||||||||||||||||||
2005 |
105 | 210 |
Delay to settlement (years) | |||||||||||||||||||||||||||||||||||||||||
Reporting Year | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |||||||||||||||||||||||||||||||
1996 |
55 | % | 93 | % | 99 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | |||||||||||||||||||||
1997 |
58 | % | 84 | % | 84 | % | 86 | % | 86 | % | 89 | % | 89 | % | 90 | % | 91 | % | |||||||||||||||||||||||
1998 |
61 | % | 83 | % | 87 | % | 89 | % | 91 | % | 91 | % | 95 | % | 95 | % | |||||||||||||||||||||||||
1999 |
53 | % | 89 | % | 93 | % | 94 | % | 95 | % | 97 | % | 99 | % | |||||||||||||||||||||||||||
2000 |
60 | % | 89 | % | 94 | % | 96 | % | 96 | % | 96 | % | |||||||||||||||||||||||||||||
2001 |
53 | % | 86 | % | 90 | % | 93 | % | 94 | % | |||||||||||||||||||||||||||||||
2002 |
55 | % | 90 | % | 97 | % | 97 | % | |||||||||||||||||||||||||||||||||
2003 |
55 | % | 85 | % | 91 | % | |||||||||||||||||||||||||||||||||||
2004 |
54 | % | 84 | % | |||||||||||||||||||||||||||||||||||||
2005 |
50 | % | |||||||||||||||||||||||||||||||||||||||
Pattern assumed |
54.9 | % | 87.9 | % | 93.3 | % | 95.0 | % | 96.3 | % | 97.2 | % | 98.5 | % | 99.2 | % | 99.7 | % | 100.0 | % | |||||||||||||||||||||
Page 47
Delay to settlement (years) | |||||||||||||||||||||||||||||||||||||||||||||
No of claims | |||||||||||||||||||||||||||||||||||||||||||||
Reporting Year | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | reported | ||||||||||||||||||||||||||||||||||
1996 |
31 | 61 | 82 | 92 | 96 | 98 | 100 | 103 | 106 | 108 | 112 | ||||||||||||||||||||||||||||||||||
1997 |
32 | 68 | 91 | 103 | 109 | 110 | 115 | 117 | 117 | 121 | |||||||||||||||||||||||||||||||||||
1998 |
29 | 48 | 60 | 68 | 71 | 74 | 75 | 77 | 84 | ||||||||||||||||||||||||||||||||||||
1999 |
38 | 81 | 97 | 102 | 112 | 114 | 115 | 121 | |||||||||||||||||||||||||||||||||||||
2000 |
38 | 90 | 111 | 142 | 143 | 146 | 160 | ||||||||||||||||||||||||||||||||||||||
2001 |
63 | 120 | 186 | 193 | 202 | 222 | |||||||||||||||||||||||||||||||||||||||
2002 |
51 | 149 | 186 | 203 | 235 | ||||||||||||||||||||||||||||||||||||||||
2003 |
42 | 122 | 158 | 199 | |||||||||||||||||||||||||||||||||||||||||
2004 |
56 | 141 | 246 | ||||||||||||||||||||||||||||||||||||||||||
2005 |
35 | 185 |
Delay to settlement (years) | |||||||||||||||||||||||||||||||||||||||||
Reporting Year | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |||||||||||||||||||||||||||||||
1996 |
28 | % | 54 | % | 73 | % | 82 | % | 86 | % | 88 | % | 89 | % | 92 | % | 95 | % | 96 | % | |||||||||||||||||||||
1997 |
26 | % | 56 | % | 75 | % | 85 | % | 90 | % | 91 | % | 95 | % | 97 | % | 97 | % | |||||||||||||||||||||||
1998 |
35 | % | 57 | % | 71 | % | 81 | % | 85 | % | 88 | % | 89 | % | 92 | % | |||||||||||||||||||||||||
1999 |
31 | % | 67 | % | 80 | % | 84 | % | 93 | % | 94 | % | 95 | % | |||||||||||||||||||||||||||
2000 |
24 | % | 56 | % | 69 | % | 89 | % | 89 | % | 91 | % | |||||||||||||||||||||||||||||
2001 |
28 | % | 54 | % | 84 | % | 87 | % | 91 | % | |||||||||||||||||||||||||||||||
2002 |
22 | % | 63 | % | 79 | % | 86 | % | |||||||||||||||||||||||||||||||||
2003 |
21 | % | 61 | % | 79 | % | |||||||||||||||||||||||||||||||||||
2004 |
23 | % | 57 | % | |||||||||||||||||||||||||||||||||||||
2005 |
19 | % | |||||||||||||||||||||||||||||||||||||||
Pattern assumed |
21.7 | % | 58.5 | % | 77.2 | % | 85.4 | % | 88.4 | % | 90.2 | % | 91.6 | % | 93.0 | % | 93.9 | % | 95.0 | % | |||||||||||||||||||||
Page 48
Lung | ARPD & | |||||||||||||||
Delay (years) | Mesothelioma | Asbestosis | Cancer | Other | ||||||||||||
0 |
54.9 | % | 21.7 | % | 21.7 | % | 21.7 | % | ||||||||
1 |
33.0 | % | 36.8 | % | 36.8 | % | 36.8 | % | ||||||||
2 |
5.4 | % | 18.7 | % | 18.7 | % | 18.7 | % | ||||||||
3 |
1.7 | % | 8.2 | % | 8.2 | % | 8.2 | % | ||||||||
4 |
1.3 | % | 3.0 | % | 3.0 | % | 3.0 | % | ||||||||
5 |
0.9 | % | 1.8 | % | 1.8 | % | 1.8 | % | ||||||||
6 |
1.3 | % | 1.4 | % | 1.4 | % | 1.4 | % | ||||||||
7 |
0.7 | % | 1.4 | % | 1.4 | % | 1.4 | % | ||||||||
8 |
0.6 | % | 0.9 | % | 0.9 | % | 0.9 | % | ||||||||
9 |
0.3 | % | 1.1 | % | 1.1 | % | 1.1 | % | ||||||||
Future |
0.0 | % | 5.0 | % | 5.0 | % | 5.0 | % |
5.6 | Proportion of claims settled for nil amounts |
| Claims made against the Liable Entities by plaintiffs where the claim is ultimately determined by a Court to not be compensable. This can arise: |
| because the injury for which the claimant seeks compensation is not compensable (e.g. asymptomatic pleural plaques without any physical impairment); or | ||
| because the injury is not proven to be a result of asbestos-related exposure (e.g. smoking-related lung cancer with no evidence of asbestos exposure). |
Page 49
| Claims made against the Liable Entities by plaintiffs which are ultimately not pursued by the plaintiff. This would include claims where the plaintiff discontinues a claim: |
| Either in relation to the entire claim being discontinued by the plaintiff; or | ||
| In relation to the claim against the Liable Entity being discontinued by the plaintiff (but that the claim continues against other defendants). |
| Claims made against the Liable Entities by plaintiffs but where liability against the Liable Entities is ultimately declined by the Court. This would, for example, include circumstances where the plaintiff joins the Liable Entity in a claim but it is later shown that the Liable Entity is not a relevant defendant and that another defendant is liable. This would, for example, cover: |
| Circumstances where it is demonstrated that that the product used which is alleged to have contributed to asbestos exposure and the subsequent claim was proven not to be a product manufactured or used by a Liable Entity. | ||
| Circumstances where through indemnity or contractual obligations another party is ultimately held liable for that element of the claim in which the Liable Entities were previously held liable. |
5.7 | Average claim costs of IBNR claims |
| Average award (sometimes including plaintiff legal costs) of a non-nil attritional claim. | ||
| Average plaintiff legal costs of a non-nil attritional claim. | ||
| Average defendant legal costs of a non-nil attritional claim. | ||
| Average defendant legal costs of a nil attritional claim. |
Page 50
| Large claim awards and legal cost allowances. |
| Plaintiff settlement year: being the year in which the claimant settles their claim against the defendants named or joined in the Statement of Claim; | ||
| Client settlement year: being the year in which the Liable Entities settle their claim with the plaintiff or with the cross-claimant (where applicable); and | ||
| Client closure year: being the year in which the Liable Entities have closed the claim file, having settled all their liabilities in relation to that claim (including the settlement of their defence legal costs). |
Page 51
5.8 | Pending claims | |
5.8.1 | Definition of pending claims |
| Where there is a closure date, there are not expected to be any further award or legal costs incurred. | ||
| When there is no closure date but the claim has a settlement date, there is a possibility of further emerging defendant legal costs, even though the claim award has been settled. | ||
| When there is no settlement date, there is a possibility of award, plaintiff legal costs and defendant legal costs still being incurred. |
5.8.2 | Methodology for evaluating the liability for pending claims |
| Projection of future claim payments by year of notification using triangulation techniques as described in section 5.5 and compare with the case estimates for those claims; and |
Page 52
| Projection of future average cost per claim for reported, but not finalised claims. The average cost is assessed by reference to the delay from when the claim was reported to when the claim settles (this method is known as the PPCF method). |
5.8.3 | Findings |
Year of | Non | |||||||||||
Notification | Mesothelioma | Mesothelioma | All | |||||||||
2002 |
5 | % | 23 | % | 18 | % | ||||||
2003 |
35 | % | - | 133 | % | - | 27 | % | ||||
2004 |
23 | % | 29 | % | 26 | % | ||||||
2005 |
23 | % | 33 | % | 28 | % | ||||||
2006 |
-5 | % | 39 | % | 13 | % | ||||||
Total |
18 | % | 26 | % | 22 | % |
Page 53
5.8.4 | Conclusions |
| Certain information provided to us by the MRCF indicates that there has consistently been some level of redundancy in the case estimates. | ||
| Analysis of the claims database using actuarial projection methods as described above appear to support this assertion. | ||
| This is the first time we have tested the extent of redundancy in case estimates. Given an absence of past analysis to test this assumption against, or to understand trends in the assumption over time, we have not yet given full credibility to our results. |
$m | ||||
Claims Award Cost |
69.3 | |||
Plaintiff Legal Cost |
6.8 | |||
Defendant Legal Cost |
22.6 | |||
Total |
98.7 |
Page 54
5.9 | Insurance Recoveries |
| Product liability claims are covered by an aggregate policy which provides cover for all claims up to an overall aggregate limit | ||
| Public liability claims are covered by an each and every loss policy which provides cover for each claim up to an individual limit for each claim. |
| Primary $2m covering the first $2m of claims costs; and | ||
| $3m xs $2m covering the next $3m of claims costs, once the $2m cover is fully utilised. If the $2m layer below this cover is not fully utilised then this cover would also not be utilised. |
5.9.1 | Allocation of cashflows |
Page 55
5.9.2 | Product liability recoveries |
Page 56
5.9.3 | Public liability recoveries |
| a large public liability claim in excess of A$1m; and | ||
| that the period of exposure be of sufficient brevity or sufficiently concentrated that the allocated cost of the claim to any one year would be in excess of A$1m. |
Page 57
5.10 | Bad debt allowance |
5.11 | Cross-claim recoveries |
7 | The announcement by Berkshire Hathaway on 20 October 2006 that it would take over management of Equitas and provide additional capital (by way of a $7bn reinsurance contract from Berkshire Hathaway to Equitas) appears to reduce the risk of insolvency to Equitas considerably. Indications are that Berkshire Hathaway may ultimately assume the liabilities of Equitas. |
Page 58
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Cross-claim | |||||||||||||||
recoveries | Gross Settlement | Recovery Rate | |||||||||||||
Settlement year | ($) | ($) | % | ||||||||||||
Pre 1994 | 571,375 | 21,774,807 | 2.62% | ||||||||||||
1994/95 | 77,224 | 10,620,936 | 0.73% | ||||||||||||
1995/96 | 242,746 | 9,912,267 | 2.45% | ||||||||||||
1996/97 | 135,904 | 7,576,923 | 1.79% | ||||||||||||
1997/98 | 129,877 | 12,050,073 | 1.08% | ||||||||||||
1998/99 | 251,976 | 10,694,305 | 2.36% | ||||||||||||
1999/00 | 442,381 | 18,336,559 | 2.41% | ||||||||||||
2000/01 | 1,204,568 | 26,373,370 | 4.57% | ||||||||||||
2001/02 | 616,449 | 33,175,708 | 1.86% | ||||||||||||
2002/03 | 628,098 | 44,219,472 | 1.42% | ||||||||||||
2003/04 | 339,730 | 50,104,592 | 0.68% | ||||||||||||
2004/05 | 791,133 | 62,574,134 | 1.26% | ||||||||||||
2005/06 | 5,751,414 | 66,362,180 | 8.67% | ||||||||||||
2006/07 | * | 2,091,638 | 30,286,108 | 6.91% | |||||||||||
Total | 13,274,513 | 404,061,342 | 3.29% |
* | Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 59
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Taking all of the above factors into account, we have assumed that future levels of cross-claim recoveries will be 2.0% of the average award. | ||
Based on current rates of expenditure, this would equate to around $1.5m of cross-claim recoveries per annum at present. | ||
5.12 | Discounting cashflows | |
Cashflows are discounted on the basis of yields available on Commonwealth government bonds of varying coupon rates and durations to maturity (matched to the liability cashflows). | ||
In discounting the liabilities at a risk-free discount rate, we have assumed that there will be sufficient assets available to generate the investment income implicit in the discounting of the liabilities. | ||
If such assets are not available then the investment income generated may be insufficient to support the unwinding of the discount on the liabilities and the cost of meeting the liabilities will increase. | ||
It should also be recognised that the yield curves and therefore the discount rates applied can vary considerably between valuations and can, and do, contribute significant volatility to the liability assessment at different assessment dates. |
Page 60
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
6 | COST SAVINGS ARISING FROM THE DDT ACT 2005 | |
6.1 | Background to the DDT Act 2005 | |
Our previous report at 31 March 2006 provided significant commentary on the background of the DDT Act 2005 and the methodology we used to first evaluate the potential benefits of the Act. | ||
Readers are referred to that report should they wish to understand the detailed findings and outcomes of the NSW Government Review and the subsequent DDT Act 2005. However, a brief overview follows. | ||
As a result of the DDT Act 2005, significant changes were made to the procedures for Asbestos claims resolution on and after 1 July 2005 including: |
| a required information exchange at the commencement of the claim between parties by way of statements of full particulars by plaintiffs and detailed replies from defendants; | ||
| a compulsory mediation of claims failing settlement by agreement; | ||
| a single claims manager model to represent multiple defendants in the negotiation of settlement and failing settlement, mediation of plaintiff claims; | ||
| a process for defendants to reach agreement on contribution between themselves for the purposes of the settlement or mediation of a plaintiffs claim. If defendants cannot agree contribution, the Act provides that apportionment of liability will be decided by an independent Contributions Assessor using standard presumptions of apportionment as set out in the Dust Diseases Tribunal (Standard Presumptions Apportionment) Order 2005; | ||
| costs penalties will apply in circumstances where parties: |
§ | breach the rules of the new claims resolution process; | ||
§ | fail to participate in mediation in good faith including where defendants may unreasonably limit a single claims managers authority to settle the claim; | ||
§ | unreasonably leave issues in dispute following an unsuccessful mediation; and |
Page 61
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
§ | where any subsequent litigation does not result in a materially different position to that of settlement offers made by the parties; and |
| cost penalties are also imposed if a Defendant appeals the decision of a Contributions Assessor and fails to better its position by the greater of $20,000 or 10% of the amount otherwise payable by it. | ||
| Urgent cases may be removed from a claims resolution process but in each case, the Tribunal must consider whether to order the application of provisions relating to compulsory mediation and apportionment between defendants to that claim. Urgent cases as defined by the Act will still be dealt with by the Dust Diseases Tribunal if they cannot be addressed in an expedited timetable for the new claims resolution process but in keeping with revised Dust Diseases Tribunal hearing procedures. |
Page 62
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
6.2 | Methodology | |
We have estimated the cost savings arising from the DDT Act 2005 by reference to work undertaken by the Cost Consultants to estimate the costs of each stage of the new procedures. The Cost Consultants have modelled the new procedure (hereafter referred to as the New Process) based on their understanding of the NSW Government Review and based on legal instruction provided to them. They have then mapped the anticipated range of costs for the New Process. These costs were then compared with the anticipated costs under the Old Process. | ||
The costs structure has been assessed for two cases: | ||
Case 1, which included: |
| A case where medical issues and disputes are limited in nature, such as a mesothelioma claim where diagnosis is straight forward; | ||
| There are only a few defendants; | ||
| There would be no economic loss claim and only a limited need for non-medical expert evidence; and | ||
| There are no significant liability issues with the main issues being quantum. |
| Significant medical issues such as on diagnosis, extent of disability, other health issues contributing to the disability (co-morbidity) and prognosis/future care; | ||
| More defendants, as where damages are divisible; | ||
| Expert evidence of a non-medical or occupational therapy nature, such as an economic loss report; and | ||
| Liability issues, at least involving some of the defendants. |
Page 63
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Plaintiffs Costs | Defendants Costs | |||||||||||||||
Stage of proceedings | Case 1 | Case 2 | Case 1 | Case 2 | ||||||||||||
1 Pleadings |
10,745 | 19,945 | 3,605 | 4,760 | ||||||||||||
2 Evidence Preparation |
16,740 | 29,970 | 16,360 | 27,200 | ||||||||||||
3 Hearing Preparation |
1,915 | 4,100 | 2,800 | 5,415 | ||||||||||||
4 Hearing |
5,370 | 20,540 | 4,950 | 20,260 | ||||||||||||
Total |
34,770 | 74,555 | 27,715 | 57,635 |
Note: Costs include any relevant Court or filing fees |
Defendants Costs / | ||||||||||||||||
Plaintiffs Costs | SCMs Costs | |||||||||||||||
Stage of proceedings | Case 1 | Case 2 | Case 1 | Case 2 | ||||||||||||
1 Pleadings (particulars,
Reply, Cross-Claim |
2,512 | 3,877 | 735 | 1,470 | ||||||||||||
2 Evidence Preparation /
Information exchange |
2,100 | 7,610 | 3,395 | 9,255 | ||||||||||||
3 Settlement offers /
mediation |
3,770 | 6,710 | 3,770 | 6,710 | ||||||||||||
COURT PROCESS (where settlement does not occur at prior stages) | ||||||||||||||||
4 Preparation for hearing
of plaintiffs claim in court |
4,431 | 10,001 | 3,860 | 9,430 | ||||||||||||
5 Court hearing of
plaintiffs claim only |
6,125 | 14,690 | 6,125 | 14,540 | ||||||||||||
Total |
18,389 | 42,887 | 17,885 | 41,405 |
Note: Costs include any relevant Court or filing fees |
Page 64
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
6.3 | Potential cost savings in other States | |
At present, legislation modifying the current claims process has been introduced in NSW only, although we note that the Final Funding Agreement envisages the NSW Government undertaking to seek active participation of other States in the processes and protocols arising from the NSW Government Review. | ||
Nonetheless, in quantifying the cost savings, it is important to consider the proportion of claims costs which relate to NSW and the proportion which relates to other States. | ||
The following figure shows how the total award cost of claims settled varies by state and by settlement year in current money terms. |
Page 65
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Proportion | ||
NSW |
50% | |
Victoria |
25% | |
WA |
15% | |
Queensland & Others |
10% |
6.3.1 | Legal cost savings in other States | |
We have been asked to quantify the potential savings that might be achievable in the other States if procedural reforms were implemented in Victoria, Western Australia, Queensland and South Australia. | ||
The legislation passed in NSW was passed after considerable review of the processes in NSW and how they could be modified. It is difficult to assess whether such legislation, or parts of it, could be applied in other States and the relative level of cost savings that would arise as a result of such implementation. | ||
Furthermore, it is by no means certain whether all States will participate in implementing most, or any, of the procedural reforms adopted in NSW or the extent to which such processes will be effective in streamlining the administration and settlement of dust diseases claims in those States. | ||
In this regard, it should be noted that there has not yet been any indication of a commitment by the Governments of the other States to accept or implement any procedural reforms at this time, and nor may such reforms be appropriate. |
Page 66
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Therefore, whilst we have estimated the potential savings, it should be noted that the estimation of the level of legal cost savings that will eventuate from each of the other States is subject to considerable uncertainty. | ||
Taking into account the above discussions, together with the results from the Cost Consultants report (as detailed in Section 6.2), the proportionate reductions in legal costs that we have estimated are shown in the following table: |
Proportion saved | ||
NSW |
40% | |
Victoria |
40% | |
WA |
10% | |
Queensland & South
Australia |
20% | |
Other States |
0% |
6.4 | Savings achieved to date | |
As noted in Section 9 of this report, we have observed a continuing reduction in legal cost expenditure by the Liable Entities. We understand that this is in part a result of internal cost control initiatives by ACS which have been put in place over the last 12 to 18 months. | ||
This means that the potential future savings that could accrue from the NSW Government reforms is reduced, compared to previous expectations, as the legal costs have already been internally rationalised. | ||
This also means that our base projection (before allowance for NSW cost savings) now incorporates some components of cost savings that were previously attributed to being an outcome of the DDT Act 2005. | ||
If we continue to model legal cost savings without regard to the savings achieved to date, the ultimate legal cost we would project would be unrealistically low. |
Page 67
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
At this valuation, our approach has therefore been to consider the extent to which legal costs have already been reduced in our valuation in light of continuing favourable experience and the extent to which costs can reduce further as a result of the reforms. | ||
The result of our analysis is that legal costs have reduced by around 20% over the period since the DDT Act 2005 was implemented. | ||
Given that our target level of saving in NSW was around 40%, this analysis suggests that around half of the potential savings across all States have already been achieved. | ||
Our approach is therefore to assume that only half of the potential savings from the DDT Act 2005 remain to potentially be achieved. | ||
It is currently not possible to allocate the savings achieved to date between internal initiatives by ACS and the result of the reforms pursuant to the DDT Act 2005. |
Page 68
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
7 | ECONOMIC ASSUMPTIONS | |
7.1 | Overview |
The two main economic assumptions required for our valuation are: | |||
| The underlying claims inflation assumptions adopted to project the future claims settlement amounts and related costs. | ||
| The discount rate adopted for the present value determinations. |
These are considered in turn below. |
7.2 | Claims inflation | |
We are required to make assumptions about the future rate of inflation of claims costs. We have adopted a standard Australian actuarial claims inflation model for liabilities of the type considered in this report that is based on: |
| An underlying, or base, rate of general economic inflation relevant to the liabilities, in this case based on wage/salary (earnings) inflation; and | ||
| A rate of superimposed inflation, i.e. the rate at which claims costs inflation exceeds base inflation. |
7.2.1 | Base inflation basis | |
Ideally, we would aim to derive our long term base inflation assumptions based on observable market indicators or other economic benchmarks. Unfortunately, such indicators and benchmarks typically focus on inflation measures such as CPI (e.g. CPI index bond yields and RBA inflation targets). | ||
We have therefore derived our base inflation assumption from CPI based indicators and long term CPI / AWOTE8 relativities. |
7.2.2 | CPI assumption | |
We have considered two indicators for our CPI assumption. |
| Market implied CPI measures. | ||
| RBA CPI inflation targets. |
8 | AWOTE = Average Weekly Ordinary Time Earnings |
Page 69
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
Source: RBA Website www.rba.gov.au |
| This implied CPI rate has varied significantly in recent months (e.g. from around 2.5% as at 30 June 2005 to 3.4% at September 2006). |
Page 70
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
| The yields on both nominal and CPI-linked government bonds are driven by supply and demand, and both are in increasingly short supply in the market. The yields on both, and their relativities, are subject to some volatility and likely some short term distortion. | ||
| The RBAs long term target is for CPI to be maintained between 2% and 3% per annum. | ||
| While the RBA has been relatively successful with this target over the recent past, over the longer term future the risk of events leading to inflation emerging occasionally outside this range needs to be allowed. Given a likely upside bias to such events, longer term inflation at the higher end of the RBAs range would not be unexpected. | ||
Weighing this evidence together, this suggests a long term CPI inflation benchmark of 2.75% to 3.00% per annum. |
7.2.3 | Wages (AWOTE) / CPI relativity | |
The following table summarises the average annualised rates of AWOTE and CPI inflation, and their relativities, for various historic periods: |
AWOTE | CPI | AWOTE CPI | ||||||||||
1970 2005 |
7.91 | % | 6.20 | % | 1.71 | % | ||||||
1980 2005 |
5.99 | % | 4.68 | % | 1.31 | % | ||||||
1990 2005 |
4.28 | % | 2.51 | % | 1.77 | % | ||||||
1995 2005 |
4.47 | % | 2.50 | % | 1.98 | % |
Page 71
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
| The last period from 1995 reflects largely a continuous period of economic growth which may not be reflective of longer term trends. | ||
| The longer periods cover a range of business cycles, albeit that the period from 1970 includes the unique events of the early 1970s (i.e. general inflationary pressures, both locally and worldwide, and the impact of high oil prices owing to the Oil Crisis in 1973). |
Page 72
Valuation of the asbestos-related disease liabilities of the Liable Entities to be met by the Special Purpose Fund 30 September 2006 |
7.2.4 | Impact of claimant ageing and non-AWOTE inflation effects | |
The overall age profile of claimants is expected to rise over future years with the consequent impact that, other factors held constant, claims amounts should tend to increase more slowly than average wage inflation. This is due to both reduced compensation for years of income or life lost and a tendency for post retirement age benefits to possibly increase closer to CPI than AWOTE. | ||
Furthermore, we note that some heads of damage would be expected to rise at CPI or lower, such as general damages and compensation for loss of expectation of life, owing to the age profile of claimants showing a continuing upward trend in average ages. Other heads of damage, including loss of earnings, would be expected to rise at AWOTE (ignoring the ageing effect); whilst medical expenses and care costs would be expected to rise in line with medical cost inflation which in recent times has been in excess of AWOTE. | ||
Taking these factors into account, we have reduced our base inflation assumption by 0.25% to 0.50% p.a. from the AWOTE rate indicated above for the combined effect of ageing and other non-AWOTE inflation drivers of the benefits. | ||
Weighing all of this together, we have adopted a base inflation assumption of 4.25% p.a. | ||
7.2.5 | Superimposed inflation | |
As discussed later in Section 9, actual claims inflation has been approximately 6.3% per annum historically. This is against corresponding general wage inflation (making some minor allowance for ageing effects as above) over the same period of approximately 4%. This implies average superimposed inflation has been approximately 2.2% per annum. | ||
Prospectively, we have assumed that superimposed inflation will be 2.25% per annum over the long-term, although it should be noted that the actual rate of claim inflation exhibited in any one year will be inherently volatile. | ||
In addition, the 2.25% per annum superimposed inflation allowance is not inconsistent with superimposed inflation experience we have seen under other relevant liability portfolios. | ||
Given our future base inflation assumption looking forward of 4.25% per annum, adopting a 2.25% superimposed inflation would indicate a longer term overall claims cost inflation assumption of 6.60% per annum (as the inflation components are combined multiplicatively). |
Page 73
We discuss the claims inflation assumptions further in Section 9. | ||
7.2.6 | Summary of claims inflation assumptions | |
The table below summarises the claims inflation assumptions we have used within our current and previous liability assessments. |
30 | ||||||||||||
September | 31 March | |||||||||||
2006 | 2006 | 30 June 2005 | ||||||||||
Base inflation |
4.25 | % | 4.25 | % | 4.00 | % | ||||||
Superimposed inflation |
2.25 | % | 2.00 | % | 2.00 | % | ||||||
Claim cost inflation* |
6.60 | % | 6.34 | % | 6.08 | % |
* | Base and superimposed Inflation are applied multiplicatively in our models so that claim cost inflation is calculated as 1.0425 * 1.0225 1 |
7.3 | Discount rates: Commonwealth bond zero coupon yields | |
We have adopted the zero coupon yield curve at 30 September 2006, underlying the
prices, coupons and durations of certain Australian government bonds for the purpose of
discounting the liabilities for this report. The use of such discount rates is consistent with standard Australian actuarial practice for such liabilities, is in accordance with Professional Standard PS300 and is also consistent with our understanding of the Australian accounting standards in this regard. |
||
Table 7.3 shows the zero coupon yields adopted for each duration of cashflows. |
Page 74
Yield at 30 | ||||||||||||
September | Yield at 31 | Yield at 30 | ||||||||||
Year | 2006 | March 2006 | June 2005 | |||||||||
1 |
6.02 | % | 5.44 | % | 5.33 | % | ||||||
2 |
5.84 | % | 5.41 | % | 5.08 | % | ||||||
3 |
5.69 | % | 5.44 | % | 5.09 | % | ||||||
4 |
5.57 | % | 5.46 | % | 5.11 | % | ||||||
5 |
5.48 | % | 5.49 | % | 5.14 | % | ||||||
6 |
5.42 | % | 5.51 | % | 5.17 | % | ||||||
7 |
5.38 | % | 5.54 | % | 5.20 | % | ||||||
8 |
5.37 | % | 5.56 | % | 5.23 | % | ||||||
9+ |
5.37 | % | 5.57 | % | 5.25 | % |
The equivalent single uniform discount rate, based on cashflows weighted by term, is 5.51% per annum at 30 September 2006 (31 March 2006: 5.52% per annum). | ||
It is important to note that the discount rate can vary, perhaps significantly, between valuations, and can thus cause fluctuations in the present value of the liability. | ||
It is also important to understand that if assets actually held to back the liabilities are not matched to those assumed (by type and/or amount), the future investment earnings earned may deviate from those implicitly allowed for within the actuarial valuation. This might generate either profits or losses relative to the discount rates adopted. | ||
7.4 | Consistency of economic assumptions | |
An important consideration to bear in mind when setting economic assumptions is the consistency of the various assumptions. For a valuation involving the long-term inflating of cashflows and then discounting these cashflows to current money terms, a key consideration is the relativity between the assumptions. |
Page 75
Whilst future investment yields on government bonds will change, so too will the rate of future wage inflation and consequently also the overall rate of claims inflation. The key factor is whether the gap between the two factors remains reasonable. | ||
Within our current valuation, we have allowed for base inflation at 4.25% per annum, superimposed inflation at 2.25% per annum, and average yields at 30 September 2006 of 5.51% per annum. As such, the gap between claims inflation and the yield is 1.09% per annum (being 6.60% 5.51%). | ||
This compares with our valuation at 31 March 2006 where the gap was 0.82% per annum (being 6.34% 5.52%). | ||
As such, the valuation basis (and liabilities) has increased over the last six months resulting from changes to the economic assumptions. |
Page 76
8 | ANALYSIS OF CLAIMS EXPERIENCE CLAIM NUMBERS |
8.1 | Overview | |
We have begun by analysing the pattern of notifications of claims as shown in Table 8.1. This table shows the claim notifications by year. |
Report | Lung | ARPD & | Workers | All | ||||||||||||||||||||||||
Year | Mesothelioma | Asbestosis | Cancer | Other | Wharf | Compensation | claims | |||||||||||||||||||||
1994/95 |
81 | 14 | 8 | 14 | 4 | 30 | 151 | |||||||||||||||||||||
1995/96 |
72 | 24 | 16 | 23 | 3 | 32 | 170 | |||||||||||||||||||||
1996/97 |
84 | 37 | 15 | 19 | 2 | 39 | 196 | |||||||||||||||||||||
1997/98 |
111 | 32 | 20 | 17 | 2 | 50 | 232 | |||||||||||||||||||||
1998/99 |
94 | 26 | 12 | 13 | 3 | 30 | 178 | |||||||||||||||||||||
1999/00 |
94 | 41 | 16 | 12 | 14 | 38 | 215 | |||||||||||||||||||||
2000/01 |
126 | 46 | 29 | 21 | 26 | 38 | 286 | |||||||||||||||||||||
2001/02 |
161 | 91 | 23 | 30 | 17 | 61 | 383 | |||||||||||||||||||||
2002/03 |
179 | 92 | 36 | 41 | 15 | 51 | 414 | |||||||||||||||||||||
2003/04 |
187 | 99 | 26 | 28 | 10 | 36 | 386 | |||||||||||||||||||||
2004/05 |
260 | 120 | 32 | 27 | 6 | 61 | 506 | |||||||||||||||||||||
2005/06 |
210 | 98 | 30 | 18 | 6 | 33 | 395 | |||||||||||||||||||||
2006/07* |
94 | 78 | 10 | 20 | 2 | 23 | 227 | |||||||||||||||||||||
All Years
(incl. pre-1994) |
1,944 | 916 | 313 | 362 | 125 | 1,002 | 4,662 |
* Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
It can be seen that in recent years, mesothelioma has accounted for more than 40% of claims, and that this percentage increased from 42% in 2001/02 through to 2005/06 when mesothelioma claims represented 53% of claims by number. |
Page 77
In 2006/07 to date, mesothelioma claims have accounted for 41% of claims, with asbestosis showing a significant increase (from 25% in 2005/06 to 34% of claims in 2006/07). This can be observed in the following chart. |
Note: Data for 2006/07 from 1 april 2006 to 30 September 2006 | ||
8.2 | Mesothelioma claims | |
It can be seen that for mesothelioma, the incidence of notifications showed a step change upwards from 1999/00 through to 2001/02 and a steady rate of increase to the 2003/04 financial year, to 187 claims. | ||
It is also apparent from the claims information that there was a further upward step in claim numbers during 2004/05 with 260 claims reported in the year. | ||
There were 210 claims reported during 2005/06 and there have been 94 claims reported in the first six months of 2006/07. |
8.2.1 | Monthly analysis of notifications | |
We have examined the mesothelioma claims reported on a monthly basis to better understand the nature of the trends. |
Page 78
Note: Data for 2006/07 from 1 april 2006 to 30 September 2006 | ||
In our previous report we noted that the previously high trend of 2004/05 had appeared to have abated somewhat. This lower trend of claims reporting appears to have continued during 2006/07 to date. | ||
That said, there is a degree of seasonality in claims reporting and late processing of claims also takes place. | ||
For example, in 2004/05, claim numbers increased by 10 after the end of the financial year and claim numbers have increased by 10 for the 2005/06 year in the last six months. | ||
8.2.2 | Claims notifications by State | |
We have monitored the claims notifications patterns by State in which the claim is filed. Table 8.2 shows the number of claims notified by year by State. |
Page 79
Report | ||||||||||||||||||||||||||||||||
Year | NSW | VIC | WA | QLD | NZ | USA | Other | Total | ||||||||||||||||||||||||
1994/95 |
57 | 18 | 2 | 4 | 81 | |||||||||||||||||||||||||||
1995/96 |
48 | 17 | 2 | 3 | 2 | 72 | ||||||||||||||||||||||||||
1996/97 |
55 | 11 | 9 | 2 | 7 | 84 | ||||||||||||||||||||||||||
1997/98 |
83 | 16 | 4 | 3 | 5 | 111 | ||||||||||||||||||||||||||
1998/99 |
61 | 25 | 4 | 2 | 2 | 94 | ||||||||||||||||||||||||||
1999/00 |
58 | 21 | 8 | 2 | 1 | 4 | 94 | |||||||||||||||||||||||||
2000/01 |
70 | 28 | 14 | 3 | 7 | 4 | 126 | |||||||||||||||||||||||||
2001/02 |
104 | 28 | 21 | 4 | 2 | 2 | 161 | |||||||||||||||||||||||||
2002/03 |
111 | 41 | 23 | 2 | 2 | 179 | ||||||||||||||||||||||||||
2003/04 |
114 | 47 | 26 | 187 | ||||||||||||||||||||||||||||
2004/05 |
111 | 92 | 33 | 19 | 5 | 260 | ||||||||||||||||||||||||||
2005/06 |
98 | 58 | 33 | 6 | 15 | 210 | ||||||||||||||||||||||||||
2006/07* |
33 | 31 | 16 | 8 | 6 | 94 | ||||||||||||||||||||||||||
All Years (incl. pre-1994) |
1,111 | 485 | 219 | 50 | 7 | 11 | 61 | 1,944 |
* | Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
It can be seen that the most significant States, in relation to where claims have been filed to date, are NSW (57%), Victoria (25%) and WA (11%). | ||
However, the trend changed somewhat in 2004/05 with NSW making up 43%, Victoria making up 35% and WA making up 13%. | ||
Experience in 2005/06 continued the pattern observed in 2004/05 with NSW making up 47%, Victoria making up 28% and WA making up 16%. | ||
However, for 2006/07 the trend has again changed with NSW making up 35%, Victoria making up 33% and WA making up 17%. |
Page 80
It is of note that for 2006/07: |
| Experience in NSW is significantly lower than previous years; | ||
| Experience in Victoria and WA have been broadly similar to 2005/06; | ||
| Experience in Queensland has reverted to levels previously observed in 2004/05, although we note that in 2004/05 the high level of activity was due to a clearing of a backlog of cross-claims. |
In part these trends in claims activity in the various States will also have been contributed to by the decisions of BHP vs. Schultz, which will lead to claims being more regularly heard in the State of exposure rather than NSW. | ||
8.2.3 | Base valuation assumption | |
In setting a base valuation assumption for 2006/07 and 2007/08, we need to consider whether the observations in the last two years were one-off fluctuations or were part of a new trend, and especially the extent to which 2005/06 was impacted by 2004/05. | ||
We are of the opinion that the sharp increase in claim reporting activity in the latter part of 2004 and early part of 2005 were a function of accelerated reporting by plaintiff lawyers in order to preserve the rights of their clients to claim against the Liable Entities, owing to concerns at that time over the financial position of the MRCF and the ability of the MRCF to continue to meet its liabilities. | ||
The delay between diagnosis of the disease and reporting of claims reduced during the 2004/05 year (noting that for mesothelioma, it would not be possible to speed up diagnosis, and reporting delays could only be compressed to a small extent). | ||
As a consequence, the surge in claims activity in the latter part of 2004/05 represented a bringing forward of claims that would otherwise have been reported in the early part of 2005/06. | ||
We also need to consider the claims experience in the first six months of 2006/07. We have the option of: |
| Ignoring the latest experience in 2006/07 and dismissing it as simply a one-off fluctuation, maintaining the previous assumption for notification years 2006 and onwards. | ||
| Recognising it in part, and giving some credibility to the emerging experience. |
Page 81
| Recognising it in full, and asserting this to be part of a new trend which will continue in relation to all future years of claims. |
The areas which we need to address and consider are: |
| The recent quarterly trends in claims reporting activity; | ||
| The sharp reduction in claims activity in NSW in 2006/07; | ||
| Claims activity due to the statutory recovery claims from WorkCover Queensland and the underlying expectation of cross-claims activity from WorkCover Queensland prospectively. |
Recent quarterly trends in claims experience | ||
We have noted that claims experience was strong in the second half of 2005/06 and that it has been considerably lower in the first half of 2006/07. | ||
We have investigated the extent to which this may be explained as being a seasonal trend that is repeated each year. | ||
We have reviewed the level of claims activity in each quarter of the financial year. |
The chart is suggestive of some seasonality in the reporting pattern. It can be inferred from the chart that (other than for 2002) around 46% of mesothelioma claims are reported in the first half of the financial year. |
Page 82
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 83
Page 84
The chart shows that other than for the March 2005 valuation, the assumed rate of claims reporting activity has not changed significantly. The increase in the valuation assumption at March 2005 reflected the high level of claims reporting that had been exhibited in the preceding six months. | ||
8.3 | Asbestosis claims | |
It can be seen in Table 8.1 that for asbestosis, the incidence of notifications has shown a step change upwards since 2000/01 and a gradual increase to 2003/04. | ||
The number of asbestosis claims increased substantially from 99 in 2003/04 to 120 in 2004/05 and then fell back to 98 claims in 2005/06. | ||
There have been 78 claims reported in the first six months of 2006/07, which is considerably above previous experience noting that in 2004/05 there were 64 claims reported in the first half of the year. | ||
8.3.1 | Monthly analysis of notifications | |
We have examined claims on a monthly basis by disease type and by State in which the claim is being filed, to better understand the nature of the trends. |
Page 85
There has been considerable volatility in reporting in the last 2 years, with the second quarter of 2005/06 showing a considerable reduction in claims reporting which was followed by a substantial increase in activity in the latter part of 2005/06 and during the first half of 2006/07. | ||
It is of note that claims activity in recent months appears to have significantly exceeded previous estimates. It appears that the increase in asbestosis activity has arisen at the same time that mesothelioma activity has fallen, and by broadly similar numbers. | ||
8.3.2 | Claims notifications by State | |
It has been observed that the claims being filed in Victoria (see below) showed a considerable increase in numbers in 2004/05 and 2005/06, whilst activity in NSW fell considerably in 2005/06 only to return to a more usual level of activity during the first six months of 2006/07. | ||
Claims activity in Queensland in the first six months of 2006/07 has been considerably greater than in previous years, whilst South Australia has also shown an increase in reporting activity (although it currently contributes less than 10% of claims by number). |
Page 86
Report | Grand | |||||||||||||||||||||||||||||||
Year | NSW | VIC | WA | QLD | SA | Other | USA | Total | ||||||||||||||||||||||||
1994/95 | 11 | 3 | 14 | |||||||||||||||||||||||||||||
1995/96 | 19 | 3 | 1 | 1 | 24 | |||||||||||||||||||||||||||
1996/97 | 28 | 8 | 1 | 37 | ||||||||||||||||||||||||||||
1997/98 | 28 | 4 | 32 | |||||||||||||||||||||||||||||
1998/99 | 22 | 3 | 1 | 26 | ||||||||||||||||||||||||||||
1999/00 | 28 | 12 | 1 | 41 | ||||||||||||||||||||||||||||
2000/01 | 36 | 7 | 1 | 2 | 46 | |||||||||||||||||||||||||||
2001/02 | 75 | 15 | 1 | 91 | ||||||||||||||||||||||||||||
2002/03 | 79 | 9 | 3 | 1 | 92 | |||||||||||||||||||||||||||
2003/04 | 74 | 21 | 3 | 1 | 99 | |||||||||||||||||||||||||||
2004/05 | 81 | 26 | 4 | 7 | 1 | 1 | 120 | |||||||||||||||||||||||||
2005/06 | 34 | 36 | 2 | 20 | 5 | 1 | 98 | |||||||||||||||||||||||||
2006/07* | 33 | 15 | 2 | 21 | 6 | 1 | 78 | |||||||||||||||||||||||||
All Years
(incl. pre-1994) |
613 | 203 | 19 | 49 | 17 | 11 | 4 | 916 |
* | Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 87
Page 88
8.4 | Lung cancer claims | |
For lung cancer claims, claim notifications have been steady and do not appear to have shown the same pattern of notification as mesothelioma and asbestosis. There were 30 claims reported during 2005/06. | ||
In our previous report, we projected 31 claims for 2006/07. At this valuation, we have assumed 3 claims per month for the remainder of 2006/07. This results in a projection of 28 claims for 2006/07. | ||
8.5 | ARPD & Other claims | |
In relation to ARPD & Other claims, the number of claims fell from 41 in 2002/03 to 27 in 2004/05 and 18 claims in 2005/06. | ||
However, in 2006/07 there have been 20 claims in the year to date. | ||
We have projected 38 claims to be notified in 2006/07, based on an assumption of 3 claims per month for the remaining six months of 2006/07. This is an increase from our previous assumption of 33 claims. | ||
8.6 | Workers Compensation and wharf claims | |
The number of Workers Compensation claims, including those met in full by the Liable Entities Workers Compensation insurers, has exhibited some degree of volatility ranging from 33 claims to 61 claims in the last five years. | ||
In 2005/06, there were 33 claims reported, of which 19 claims were reported in the first half of the financial year. By comparison, there have been 23 claims reported in the first six months of 2006/07. | ||
We note that if the underlying level of claims activity was expected to be 50-60 claims per annum, the range of observations would be 35 to 75 claims (broadly representing a 95% confidence interval). It therefore appears that the experience in the last five years simply reflects statistical variation. | ||
We have projected 53 claims for 2006/07, reduced from our previous assumption of 60 claims. | ||
It should be noted that the financial impact of this source of claim is not substantial given the proportion of claims which are settled for nil liability against the Liable Entities (generally in excess of 90%), which results from the insurance arrangements in place. | ||
For wharf claims, we have projected 6 claims to be notified in 2006/07. Again, the financial impact of this source of claim is not material. |
Page 89
8.7 | Summary of base claims numbers assumptions | |
In forming a view on the numbers of claims in 2006/07, we have taken into account the emerging experience in the financial year and a revised view of the expected numbers of claims reported monthly based on recent trends. | ||
In forming a view as to the base number of claims in 2007/08 from which we calibrate the curve of claims notifications, we have also considered the extent to which the 2004/05 and 2005/06 experience, or previous trends in claims numbers, will continue. | ||
We have adopted the view that the increase in the 2004/05 year was partly a permanent effect, relating to the move to a new scale of joining of the Liable Entities in claims and partly an acceleration of claims that would otherwise have been reported in 2005/06. | ||
Nonetheless, in forming our views, we have given greater credibility to the claims activity in 2004/05 and 2005/06 than the claims activity in prior years. | ||
As outlined in Sections 8.2 to 8.6, our assumptions as to the levels of claims numbers to assume are as follows: |
Second half- | First half- | 2006/07 | ||||||||||||||
Average | year of | year of | (seasonally | |||||||||||||
2004/05 and | 2005/06 | 2006/07 | adjusted) | |||||||||||||
2005/06 | (annualised) | (annualised) | (projected) | |||||||||||||
Mesothelioma |
235 | 234 | 188 | 214 | ||||||||||||
Asbestosis |
109 | 106 | 156 | 144 | ||||||||||||
Lung Cancer |
31 | 28 | 20 | 28 | ||||||||||||
ARPD & Other |
23 | 16 | 40 | 38 | ||||||||||||
Wharf claims |
6 | 6 | 4 | 6 | ||||||||||||
Workers Compensation |
47 | 28 | 46 | 53 | ||||||||||||
Total |
451 | 418 | 454 | 483 |
Page 90
8.8 | Exposure information | |
8.8.1 | Australian use of asbestos | |
Figure 8.8 shows measures of the production and consumption of asbestos in Australia in the period 1920 to 2002. It can be seen that the exposure, being measured in net consumption, appeared to peak in the early to mid 1970s. | ||
Figure 8.8: Consumption and production indices Australia 1920-2002 |
Source: World Mineral Statistics Dataset, British Geological Survey, www.mineralsuk.com |
A peak of consumption in approximately 1975 should broadly correspond to a peak in notifications of mesothelioma claims in around 2010, being 35 years later (and equal to the mean of the latency period from the average date of exposure of the claimant to the date of notification). The data underlying this chart is shown in Appendix G. | ||
8.8.2 | Exposure information from current claims | |
We have also reviewed the exposure information available in relation to claims notified to date. This has been conducted by using the exposure dates stored in the MRCFs claims database at an individual claim level and identifying the number of person-years of exposure in each exposure year. We have reviewed the pattern of exposure for each of the disease types separately, although we note that they tend to follow similar patterns for each disease type. |
Page 91
Page 92
Page 93
8.9 | Latency model | |
Our method for projecting claim numbers is described in Section 5.4. In brief terms, we use the exposure curve together with a model of the latency period of claims to derive an index of future claim notifications which we then calibrate to a base number of claims notifications to estimate the future incidence of claims. | ||
Our latency model for mesothelioma is for latency to be normally distributed with a mean latency of 35 years and a standard deviation of 10 years. | ||
We have monitored the latency period of the claims of the Liable Entities in order to test the validity of those assumptions. | ||
We have measured the mean latency period from the average date of exposure to the date of notification of a claim. | ||
In strict epidemiological terms, the latency period should be measured from the date of exposure to the date of diagnosis. Given that the date of notification lags the date of diagnosis by around 1 year for non-mesothelioma disease types, and slightly less for mesothelioma, the latency trends shown in the following charts might slightly overstate the true latency. | ||
The charts below show the average (mean) latency and the 25th percentile and 75th percentile observations. |
Page 94
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Note: Data for 2006/07 from 1 April 2006 to 30 september 2006 |
Page 95
Note: Data For 2006/07 from 1 April 2006 to 30 September 2006 |
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 96
The above charts indicate that the average latency period from the average exposure is around 35 years for mesothelioma. Epidemiological studies tend to suggest that the observed latency period for mesothelioma is between 4 and 75 years, with an average latency of around 35 years. | |||
It is not surprising that the average latency period observed is showing an upward trend. | |||
An analysis of the latency period would be biased in early years as the claims that are reported in the earlier years must necessarily result from earlier exposures (e.g. 1940s) and be associated with shorter latency. | |||
By contrast, claims reported in the later years (e.g. 2040 onwards) will likely result from later exposure (e.g. in the 1980s) and be associated with longer latency. | |||
At present, given that we are some 30 to 40 years after the main period of exposure, claims currently being reported reflect a broad mix of claims of varying latencies. Accordingly, any analysis of the latency period during the most recent 5 to 10 years: |
| Should provide a good indicator of the underlying average latency period of each disease type; and | ||
| Should show some slight upwards trends given the fall-off in exposure in the late 1970s and 1980s. |
Accordingly, at this time the claims experience provides some support to our assumption as to the mean latency period of mesothelioma and other asbestos-related disease claims and seems to accord with epidemiological research in relation to mesothelioma. | ||
A summary of our overall latency assumptions, which have in part been derived with reference to the actual experience and in part from epidemiological studies and medical literature, are shown in Appendix F. | ||
8.10 | Peak year of claims and estimated future notifications | |
Based on the application of our exposure model and our latency model, and also taking into account epidemiological views from both Australia and the UK, recognising that there are some conflicting views as to when the peak might arise, the peak year of notification for each disease type is as follows: |
Page 97
Current | Previous | |||||||
valuation | valuation | |||||||
assumption | assumption | |||||||
Mesothelioma |
2010/11 | 2010/11 | ||||||
Asbestosis |
2006/07 | 2005/06 | ||||||
Lung Cancer |
2010/11 | 2010/11 | ||||||
ARPD & Other |
2006/07 | 2006/07 | ||||||
Wharf claims |
2000/01 | 2000/01 | ||||||
Workers Compensation |
2006/07 | 2006/07 |
Page 98
Current number | Previous number | |||||||||||||||
projection | projection | |||||||||||||||
2006 | 2006 | |||||||||||||||
onwards | Total | onwards | Total | |||||||||||||
Mesothelioma |
4,660 | 6,510 | 4,686 | 6,518 | ||||||||||||
Asbestosis |
1,953 | 2,791 | 1,388 | 2,217 | ||||||||||||
Lung Cancer |
590 | 893 | 605 | 904 | ||||||||||||
ARPD & Other |
573 | 915 | 484 | 835 | ||||||||||||
Wharf claims |
63 | 186 | 61 | 180 | ||||||||||||
Workers Compensation |
793 | 1,772 | 879 | 1,859 | ||||||||||||
All claim types |
8,633 | 13,068 | 8,103 | 12,513 |
Page 99
It can be seen that the recognition of the emerging experience to 30 September 2006 has increased our projected ultimate number of claims compared with our previous valuation of 31 March 2006 by 555 claims, the majority of which results from asbestosis (574) offset by some minor changes in relation to the other disease types. | ||
8.11 | Baryulgil | |
To date, there have been 38 product and public liability claims (relating to 28 separate claimants) filed against the Liable Entities costing $1.4m, inclusive of legal costs of $0.7m. | ||
Of these 38 claims, 14 claims were settled with no liability against the Liable Entities and 6 remain unsettled. | ||
In the last six months, there have been 5 claims reported, all of which were lodged on one day. | ||
Baryulgil claims have not generated substantial claims costs historically because most of the claims were settled in the 1980s when awards were considerably lower than current levels. | ||
It is also of note that the Liable Entities tended to bear only around one-third to one-half of the liability, reflecting the contribution by other defendants to the overall settlement (including those which have since been placed in liquidation). | ||
For the purposes of our valuation, we have estimated there to be a further 29 future claims, comprising 11 mesothelioma claims, 8 other product and public liability claims and 10 Workers Compensation claims. | ||
We have assumed average claims and legal costs, net of Workers Compensation insurances, broadly in line with those described in Section 9. | ||
Our liability assessment at 30 September 2006 of the additional provision that could potentially be required is an undiscounted liability of $9.2m and a discounted liability of $6.1m. |
Page 100
9 | ANALYSIS OF EXPERIENCE AVERAGE CLAIMS COSTS | |
9.1 | Overview | |
We have modelled the average claim awards and plaintiff and defendant legal costs (where separately disclosed) by disease type in arriving at our valuation assumptions. | ||
Average attritional claim awards (which we have defined to be claims below $1m in current money terms) may vary considerably with the development of new heads of damage. | ||
Past examples include the decision in relation to Sullivan vs. Gordon (1999) (47 NSWLR 31, [1999] NSWCA 338) and, the recent offsetting decision in CSR vs. Eddy [2005] HCA64. | ||
The Civil Liability Amendment Bill 2006 (see section 3.3.2) and the South Australia (Dust Diseases) Act 2005 have come into force that may affect future awards relative to that experienced in prior years. | ||
Table 9.1 shows how the average settlement costs for non-nil attritional claims have varied by plaintiff settlement year. All data have been converted into 2006/07 money terms using base inflation at 4% per annum. | ||
The readers attention is drawn to the fact that the average amounts shown hereafter relate to the average amounts of the contribution made by the Liable Entities, and do not reflect the total award payable to the plaintiff unless this is clearly stated to be the case. | ||
In particular, for Workers Compensation the average awards reflect the average contribution by the Liable Entities for claims in which they are joined but relate only to that amount of the award determined against the Liable Entities which is not met by a Workers Compensation Scheme or Policy. |
Page 101
Plaintiff | ||||||||||||||||||||||||
settlement | Lung | ARPD & | Workers | |||||||||||||||||||||
Year | Mesothelioma | Asbestosis | Cancer | Other | Wharf | Compensation | ||||||||||||||||||
1994/95 | 228,021 | 128,476 | 48,581 | 260,973 | 39,425 | 121,785 | ||||||||||||||||||
1995/96 | 171,069 | 64,343 | 98,271 | 202,395 | 10,006 | 73,266 | ||||||||||||||||||
1996/97 | 173,566 | 72,400 | 48,646 | 32,493 | 0 | 64,838 | ||||||||||||||||||
1997/98 | 174,164 | 72,418 | 42,951 | 63,036 | 71,166 | 121,473 | ||||||||||||||||||
1998/99 | 184,106 | 41,075 | 34,452 | 117,016 | 0 | 48,355 | ||||||||||||||||||
1999/00 | 214,975 | 69,410 | 74,419 | 124,101 | 71,993 | 114,492 | ||||||||||||||||||
2000/01 | 232,066 | 73,103 | 90,872 | 80,021 | 87,518 | 64,333 | ||||||||||||||||||
2001/02 | 270,210 | 91,168 | 112,457 | 102,118 | 59,798 | 51,708 | ||||||||||||||||||
2002/03 | 252,533 | 93,249 | 85,089 | 81,113 | 144,078 | 108,407 | ||||||||||||||||||
2003/04 | 234,676 | 107,100 | 98,030 | 90,911 | 125,695 | 93,584 | ||||||||||||||||||
2004/05 | 246,777 | 85,491 | 146,544 | 80,260 | 77,283 | 137,538 | ||||||||||||||||||
2005/06 | 248,423 | 89,964 | 82,235 | 87,358 | 74,487 | 99,876 | ||||||||||||||||||
2006/07 * | 244,400 | 83,788 | 88,849 | 59,469 | 121,196 | 210,080 |
* | Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 102
9.2 | Mesothelioma claims | |
For mesothelioma, the year 2001/02 resulted in the highest annual average cost. The step changes in 1999/00 through 2001/02 would appear to reflect in part legislative changes that occurred as well as in the percentage of the total award which the Liable Entities were required to contribute. | ||
9.2.1 | Contribution rate | |
We have estimated the percentage share which the Liable Entities have taken of the gross settlements. The following table shows that share, for those claims where such information is available, and how it has changed over time. | ||
As noted in Section 4.3.3, owing to issues surrounding the total settlement cost for cross-claims, the analysis below is now only stated for direct claims and cannot therefore be compared directly with previous analyses. |
Plaintiff | Total award | Liable Entities | Percentage | |||||||||
Settlement Year | settlement | contribution | Share | |||||||||
1994/95 | 9,422,500 | 5,285,097 | 56.1 | % | ||||||||
1995/96 | 13,417,092 | 6,619,729 | 49.3 | % | ||||||||
1996/97 | 7,797,708 | 5,287,684 | 67.8 | % | ||||||||
1997/98 | 10,620,298 | 8,789,560 | 82.8 | % | ||||||||
1998/99 | 10,949,146 | 7,774,456 | 71.0 | % | ||||||||
1999/00 | 12,840,235 | 10,628,167 | 82.8 | % | ||||||||
2000/01 | 26,024,726 | 21,071,049 | 81.0 | % | ||||||||
2001/02 | 31,425,551 | 26,254,603 | 83.5 | % | ||||||||
2002/03 | 39,838,605 | 34,996,891 | 87.8 | % | ||||||||
2003/04 | 41,759,715 | 32,640,711 | 78.2 | % | ||||||||
2004/05 | 57,768,424 | 44,690,742 | 77.4 | % | ||||||||
2005/06 | 53,170,860 | 44,813,168 | 84.3 | % | ||||||||
2006/07 * | 23,478,369 | 19,997,909 | 85.2 | % | ||||||||
Total (1994-2006) | 338,513,229 | 268,849,765 | 79.4 | % |
* | Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 103
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 | ||
9.2.2 | Number of defendants | |
We have analysed the total number of defendants for claims in which the Liable Entities are joined to gauge whether this may explain, in part, some of the trends observed above. | ||
The chart below shows the proportion of claims split by the number of defendants and how that has changed over time. |
Page 104
Page 105
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 | ||
It can be seen that the average number of defendant companies per claim has been broadly stable since 1999, at around 2.4 defendants per claim. | ||
9.2.3 | Distribution of claim sizes for mesothelioma claims | |
We have analysed the make-up of the average costs for mesothelioma claims by banding claims into cohorts of 10% groups. That is, identifying the contribution to the overall average cost from the smallest 10% of non-nil claims by size, then the contribution from the 10% to 20% cohort of claims by size etc. | ||
By way of illustration, the amount for the 10%-20% band is measured as: |
| To understand the trends in the average costs; and | ||
| To identify if the change in mix of claims by size has contributed to the observed level of superimposed inflation. |
Page 106
Page 107
9.2.4 | Trends in average awards |
Page 108
Page 109
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 265,000 | 281,100 | ||
31 March 2006 | 260,000 | 276,500 | ||
30 September 2006 | n/a | 260,000 |
Note: 2005/06 settlements are in 2005/06 dollars whilst 2006/07 settlements are in 2006/07 dollars. | ||
9.3 | Asbestosis claims | |
For asbestosis, it can be seen from Table 9.1 that in 2003 the average settlement was high relative to recent experience. | ||
We have again considered the averages of the last 3, 4 and 5 years. |
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 110
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 100,000 | 106,100 | ||
31 March 2006 | 100,000 | 106,300 | ||
30 September 2006 | n/a | 97,500 |
Note: 2005/06 settlements are in 2005/06 dollars whilst 2006/07 settlements are in 2006/07 dollars. | ||
9.4 | Lung cancer claims | |
Lung cancer average claims costs appear to have experienced some volatility in the last five years, although this is not unexpected given the small volume of claim settlements (usually approximately 20 per annum). | ||
Average claim costs observed in 2001 and 2004 were high relative to previous and more recent experience, mainly due to a number of claims settlements being made which were in excess of $200,000. |
Page 111
Page 112
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 140,000 | 148,500 | ||
31 March 2006 | 135,000 | 143,600 | ||
30 September 2006 | n/a | 125,000 |
Note: 2005/06 settlements are in 2005/06 dollars whilst 2006/07 settlements are in 2006/07 dollars. | ||
9.5 | ARPD & Other claims | |
We note the low volumes of claims, and the associated volatility this has brought to the average awards, is an inhibitor to the analysis of past trends. However, the past few years show some stability emerging in average costs. |
Note: Data for 2006/07 from 1 April 2006 to 30 September 2006 |
Page 113
For ARPD & other claims, the average of the last three years (to 2006/07) is $82,000; the average of the last four years is $85,000 and the average of the last five years is $84,000. The average of the three years (to 2005/06) is $87,000. | ||
We have adopted an average award size of $90,000 recognising the experience between 2003 and 2005 (and ignoring the experience in 2006 owing to the low number of claim settlements). This represents a 6% reduction in inflation adjusted terms: |
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 90,000 | 95,500 | ||
31 March 2006 | 90,000 | 95,700 | ||
30 September 2006 | n/a | 90,000 |
9.6 | Workers Compensation claims | |
The average award for non-nil Workers Compensation claims has shown a degree of volatility and has reduced from the level observed in 2003/04 through to 2005/06, although it should be noted that with just 3 non-nil claims settlements per annum, there is limited credibility that can be attached to the experience. | ||
The high average cost in 2006/07 is due to one workers compensation claim being settled in that period. The claim related to a 2-year exposure in the 1940s when there was limited insurance coverage. |
Page 114
The average of the last three years (to 2006/07) is $132,000; the average of the last four years is $116,000 and the average of the last five years is $114,000. | ||
The average award for 2003 settlements has fallen relative to the previous valuation owing to a reallocation of 2 claims into that year. This has had the effect of reducing the average sizes for the last four and five years significantly. | ||
We have adopted $135,000 as our valuation assumption for Workers Compensation claims in 2006/07 money terms, noting the variability in these claims which is not surprising given the small volume of claims and the high nil settlement rate. This represents a 6% reduction in the assumption in inflation adjusted terms: |
Page 115
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 135,000 | 143,200 | ||
31 March 2006 | 135,000 | 143,600 | ||
30 September 2006 | n/a | 135,000 |
9.7 | Wharf claims | |
For wharf claims, the average of the last three years (to 2006/07) has been $87,000; the average of the last four years has been $96,000 and the average of the last five years has been $105,000. The figure for the last five years has been distorted by the 2002/03 settlement year which involved 3 relatively large wharf settlements. |
Page 116
We have adopted a valuation assumption of $100,000 in 2006/07 money terms. This is a 4% increase in inflation adjusted terms: |
Claim settlement year | ||||
Valuation Report | 2005/06 | 2006/07 | ||
30 June 2005 | 90,000 | 95,500 | ||
31 March 2006 | 90,000 | 95,700 | ||
30 September 2006 | n/a | 100,000 |
9.8 | Large claim size and incidence rates | |
There have been 21 settled claims with claims awards in excess of $1m in 2005/06 money terms. All of these claims are product and public liability claims and the disease diagnosed in every case is mesothelioma. | ||
In aggregate they have been settled for $32m in 2005/06 money terms, at an average cost of approximately $1.5m. We have noted one claim exceeding $3.5m in current money terms. | ||
The incidence rate of large claims to non-nil settlements has been variable, dependent on the random incidence of large claims by settlement year: |
| Over the period 1990-2006 there have been 21 large claims compared with 1,509 non-nil non-large claims settlements. This gives an incidence rate of 1.37%. | ||
| Over the period 1990-1999 there were 5 large claims compared with 492 non-nil non-large settlements, an incidence rate of about 1.02%. | ||
| Over the period 2000-2005 there have been 16 large claims compared with 1,017 non-nil non-large settlements, an incidence rate of about 1.55%. |
We have assumed that there will be a large claim incidence rate of 1.60% prospectively over all future years, although it should be recognised that the incidence of such claims is random and that fluctuations in this incidence rate may occur from year to year. |
Page 117
With approximately 200-250 mesothelioma claims settlements per annum, we are therefore expecting to observe approximately 3 or 4 large claims per annum. | ||
We have taken the average costs from all years as our base assumption, given the small volume of such claims. This has been assumed to be $1.6m for the award and $50,000 for plaintiff legal costs with separate allowance also made for defendant legal costs of $100,000 per claim. Implicitly this allows for the occasional $3.5m claim at an incidence rate broadly equivalent to past experience | ||
As a consequence, the overall loading per non-nil mesothelioma claim to make allowance for large claims is $26,400 (being 1.6% x $1,650,000). This cost loading is applied to all non-nil settlements, resulting in an average loaded base cost for non-nil mesothelioma claims of $286,400 for the 2006/07 year. | ||
For other disease types, there have been no claims settled which have exceeded $550,000 in actual money terms. Therefore we have made no allowance for large claims for other disease types. |
Page 118
It should also be noted that there remain six claims open with award sizes estimated as in excess of $700,000. In particular, there remain 3 claims which are in excess of $1m, with the largest being for $2.3m. | ||
Our approach for reserving for these claims has been to take case estimates and make separate allowance for the associated legal costs components. | ||
9.9 | Average defendant legal cost for non-nil and nil claim settlements (before allowance for cost savings) | |
As with the average awards, we have modelled defendant legal costs separately. We have also modelled nil claims and non-nil claims separately as they should portray different characteristics in relation to their legal costs. | ||
We have again removed large claims from the analysis and treated them separately, applying a large claim loading and an incidence rate consistent with the underlying large claims. | ||
We have used closure year as the base definition to allocate costs into years and given the lag between the award settlement and the closure year, distortions can arise from year to year depending on closure activity of claims files. | ||
9.9.1 | Non-nil claims | |
The following chart shows the pattern of average defendant legal costs of the Liable Entities by disease type for non-nil claims, inflated to 2006/07 money terms over recent years. We have not included Wharf claims or Workers Compensation claims in the chart as the data is more sparse and exhibits considerable volatility. |
Page 119
The aberrational legal cost observed for lung cancer in 1996 is mainly a result of a single claim for which a high level of legal costs were incurred in defence against that claim. | ||
For mesothelioma, we have determined an average base defendant legal cost of $25,000. This is a reduction relative to that previously assumed and reflects the ongoing downward trends in actual defence costs for mesothelioma, which is therefore increasingly providing support to the assertion that legal costs have been reducing. | ||
For asbestosis, we have determined an average of $25,000 recognising the high averages that occasionally arise and the recent stability in defence costs at around $20,000 per claim. |
Page 120
For lung cancer, we have selected $20,000 although there is sparse data from which to estimate this amount. We recognise that there have been substantial average defence costs incurred in some years, especially in 1993 and 1996, but we are aware that these have been a result of precedent- setting cases, or matters involving key principles of law. It should also be recognised that the financial materiality of such an assumption is not expected to be significant given the low number of lung cancer claims and the relatively high nil settlement rate. | ||
For ARPD & Other claims, we have selected $25,000 based on an average of the last three years. | ||
For Workers Compensation and Wharf claims we have selected $15,000. | ||
9.9.2 | Nil claims | |
The following chart shows the pattern of average defendant legal costs of the Liable Entities by disease type for nil claims, inflated to 2006/07 money terms over recent years. We have not included Wharf claims or Workers Compensation claims in the chart as the data is more sparse and exhibits considerable volatility. |
Page 121
The aberrational legal cost observed for mesothelioma in 1996 is mainly a result of a single claim for which a high level of legal costs was incurred in defence against that claim. The claim related to a New Zealand exposure for which the claim had been brought in the Dust Diseases Tribunal. | ||
For mesothelioma, we have selected an average of $17,500, a slight reduction from the previous valuation. | ||
For asbestosis, we have selected an average of $15,000 unchanged from the previous assumption. Given the low nil settlement rate for asbestosis, however, this assumption is not overly significant. | ||
For lung cancer, again there is scarcity of data, but we have selected $7,500 as our assumption, unchanged from our previous valuation. We note that there have been a small number of precedent-setting cases for which significant legal costs have been incurred but where the claim has not been closed. | ||
For ARPD & Other claims, we have selected $10,000 based on an examination of the average of the last three, four and five years. | ||
For Workers Compensation and Wharf claims we have selected $2,500. | ||
9.10 | Superimposed inflation | |
9.10.1 | Overview | |
At our previous valuation, we indicated that an allowance of 2% per annum for superimposed inflation was appropriate. We identified a number of factors we considered in setting this assumption. | ||
These included: |
| The rate of pure (judicial) inflation reflecting the natural tendency for personal injury claim awards to rise at a rate higher than wage inflation owing to court tendencies to make such awards; | ||
| The impact of medical or other developments; | ||
| The emergence of new heads of damage, or the expansion of existing heads of damage; | ||
| The potential for existing heads of damage to be removed, or for the contraction of these heads of damage (e.g. CSR vs. Eddy); | ||
| The mix of claims costs by different heads of damage; and | ||
| The effect of an ageing population of claimants on the rate of inflation of overall damages, a component of which relates to economic loss. |
Page 122
Whilst the future rate of superimposed inflation is uncertain, and not predictable from one year to the next, it is of note that the average claim costs appear to have been stable in the last few years, although the emergence of new or expanding heads of damage does not tend to proceed smoothly but rather is more lumpy. | ||
9.10.2 | Analysis of past rates of superimposed inflation | |
We have reviewed the rate of inflation of claims costs by settlement year for the last 10 years for mesothelioma claims. We have inflated claim costs to current money terms by base inflation of 4% per annum. |
The chart can be used to imply the rate of inflation of claim awards over and above base inflation (i.e. it measures the rate of superimposed inflation) in any one year or an annualised rate of superimposed inflation over a longer-term. | |||
The chart shows the best fit of the rate of growth of inflated claim awards using two possible models: |
| A linear fit which assumes that the average inflated award is a linearly increasing function (such that the monetary increase from year to year is fixed); and |
Page 123
| An exponential fit which assumes that the rate of increase in the average inflated awards (i.e. the rate of superimposed inflation) is constant. |
It should be noted that the actual rate of inflation within any one year, and the extent to which superimposed inflation arises in any one year is not in itself readily estimable but rather is a function of a whole range of factors. It can be inferred from Table 9.1 and Figure 9.15, that the average rate of inflation can be extremely volatile from year to year, with figures as low as -27% and as high as +23%. | ||
The actuarial approach for this report is to take an average view to be applied over the long-term noting that there will necessarily be deviations from this average on an annual basis. | ||
Using the chart and these models of best fit, we have the following observations in relation to the rate of superimposed inflation: |
| Over the last ten years to 2005/06, the average annualised rate of superimposed inflation has been 2.1% per annum; | ||
| The linear fit of the last 10 years experience implies a rate of superimposed inflation of around 3.4% per annum at present; | ||
| The exponential fit of the last 10 years experience implies the rate of superimposed inflation to be around 4.1% per annum; | ||
| Over the last five years, the rate of superimposed inflation has been 0%; and | ||
| Over the last four years, the rate of superimposed inflation has been around 1.3% per annum (regardless of the model used). | ||
| In the last three years, there has been no superimposed inflation, largely due to the contraction in certain heads of damage. |
Weighing all of this evidence together, we have assumed a rate of future superimposed inflation of 2.25% per annum, noting in particular that this rate is intended to be a longer-term rate of inflation. |
Page 124
9.11 | Ageing of claimants | |
We have analysed the age pattern of the claimants to understand how this is trending over time. This is important in consideration of the extent of both base and superimposed inflation in claims costs as a result of the age of claimants. Young claimants will be associated with higher awards, owing to the earnings replacement component. Furthermore, greater awards for loss of expectation of life would be expected. | ||
Within our assessment of a reasonable level of base inflation to assume in Section 7.2.4 we noted the impact of claimant ageing as one factor leading to lower base inflation than is strictly implied by the financial markets. |
The chart above indicates that claimants continue to age (on average) by more than 0.56 years per year, increasing from 60 years in 1991 to almost 70 years by 2006/07. This has the effect of negating some aspects of emerging claims inflation. This is because part of the award relates to economic loss and loss of expectation of life and awards for these are in part a function of age. |
Page 125
It is noted that, at this time, the age profile of claimants is fairly stable. The data does not indicate a considerable increase in the number (and proportion) of younger claimants. Such an increase would be reflected in the graph by more of the lines in the chart showing a downward, rather than upward, trend. This would potentially indicate an increasing incidence of third wave related claims and would tend to lead to a lowering in the average age, and which would also tend to lead to higher average awards, including economic loss compensation, and possibly extending the future claims reporting pattern and timeframes. | ||
9.12 | Summary assumptions | |
The following table provides a summary of our average claim cost assumptions at this valuation, and those assumed at the previous valuation. |
Current | Previous | |||
valuation | valuation | |||
assumption | assumption | |||
Mesothelioma | 260,000 | 260,000 | ||
Asbestosis | 97,500 | 100,000 | ||
Lung Cancer | 125,000 | 135,000 | ||
ARPD & Other | 90,000 | 90,000 | ||
Wharf | 100,000 | 90,000 | ||
Workers Compensation | 135,000 | 135,000 | ||
Mesothelioma large claims allowance |
Average size = $1.65m |
Average size = $1.5m |
||
Frequency = 1.6% |
Frequency = 1.5% |
|||
Loading = $26,400 per claim |
Loading = $22,500 per claim |
Page 126
10 | ANALYSIS OF CLAIMS EXPERIENCE NIL SETTLEMENT RATES | |
10.1 | Nil settlement rate | |
We have modelled the nil settlement rates, being the number of nil settlements expressed as a percentage of the total number of settlements (nil and non-nil). The following table shows the observed nil settlement rates by disease type and by settlement year. |
Plaintiff | ||||||||||||
Settlement | Lung | ARPD & | Workers | |||||||||
Year | Mesothelioma | Asbestosis | Cancer | Other | Wharf | Compensation | ||||||
1994/95 | 18% | 20% | 43% | 50% | 43% | 53% | ||||||
1995/96 | 17% | 8% | 36% | 18% | 33% | 80% | ||||||
1996/97 | 20% | 32% | 19% | 50% | 100% | 71% | ||||||
1997/98 | 34% | 23% | 23% | 55% | 0% | 84% | ||||||
1998/99 | 26% | 48% | 11% | 30% | 100% | 90% | ||||||
1999/00 | 13% | 15% | 27% | 17% | 17% | 76% | ||||||
2000/01 | 7% | 8% | 6% | 14% | 45% | 83% | ||||||
2001/02 | 17% | 14% | 33% | 13% | 23% | 86% | ||||||
2002/03 | 11% | 3% | 27% | 18% | 50% | 80% | ||||||
2003/04 | 10% | 4% | 26% | 7% | 54% | 95% | ||||||
2004/05 | 10% | 13% | 25% | 15% | 0% | 94% | ||||||
2005/06 | 12% | 11% | 43% | 26% | 18% | 93% | ||||||
2006/07* | 16% | 7% | 33% | 50% | 0% | 98% |
It should be noted that the nil settlement rate in these tables have (generally) changed since the last valuation report (particularly for the more recent years). This reflects ongoing activity on the claims files that can be re-opened with settlement and recovery amounts modified over time. |
Page 127
It also reflects the impact of ACS splitting claims and creation of new claim records previously referred to. This is because such splitting of claims has the effect of increasing the number of settlements without necessarily increasing the number of nil settlements, since the splitting relates to claims where cross-claim recoveries can be pursued. | ||
This means that for any given year, the number of nil claims does not change but the total number of claims increases, thereby reducing the observed nil rate. | ||
10.2 | Mesothelioma claims | |
The nil settlement rates for mesothelioma have shown some degree of volatility between settlement years. | ||
Figure 10.1 shows the number of claims settled for nil cost, the total number of claims settled and the implied nil settlement rate for each settlement year. |
During the last seven years, the rate has varied between 7% and 17%. |
Page 128
In considering the future nil settlement rate assumption, we note the following: |
| Based on the current data, the last three years (to 2006/07) have averaged 12%, the last four years have averaged 11% and the last five years have averaged 11%; | ||
| The experience in 2006/07 has shown an increased nil settlement rate although this relates to only 6 months data; | ||
| As noted in the footnote to Table 10.1, data has developed (generally downwards) since our last valuation; and | ||
| Overall, the claims experience has been suggestive of some downwards trends, except in relation to the experience in 2006/07. |
Furthermore, in setting our assumption for the future nil settlement rate, we have also had regard to the average claim cost assumptions we have adopted. |
We have done this because the nil settlement rate and the average cost per non-nil claim are inextricably inter-linked. In setting the nil settlement rate we have considered the impact this has on the implied average cost per attritional claim for each settlement year. This could also be thought of, for a given settlement year, as: |
It is the combination of the two assumptions which ultimately determines the overall cost of the liabilities and we have therefore given consideration to each of the assumptions separately, and in combination, when determining our valuation assumptions. |
The following table shows the trends in this average cost per claim measure since 1994/95, in inflated money terms. |
Page 129
Average cost | ||||||
Plaintiff | per non-nil | Nil settlement | Average cost | |||
Settlement Year | claim | rate | per claim | |||
1994/95 | 228,021 | 18% | 187,182 | |||
1995/96 | 171,069 | 17% | 142,558 | |||
1996/97 | 173,566 | 20% | 138,853 | |||
1997/98 | 174,164 | 34% | 115,582 | |||
1998/99 | 184,106 | 26% | 136,162 | |||
1999/00 | 214,975 | 13% | 187,763 | |||
2000/01 | 232,066 | 7% | 216,973 | |||
2001/02 | 270,210 | 17% | 224,174 | |||
2002/03 | 252,533 | 11% | 223,836 | |||
2003/04 | 234,676 | 10% | 211,325 | |||
2004/05 | 246,777 | 10% | 222,624 | |||
2005/06 | 248,423 | 12% | 217,829 | |||
2006/07* | 244,400 | 16% | 205,400 |
Overall this average cost per claim has been more stable than each of the underlying elements separately. The overall average cost per claim has varied between $205,000 and $224,000 over the last six years in 2006/07 money terms. | ||
It should be noted that the average cost per claim for 2005/06 was impacted by the CSR vs. Eddy decision. This decision was overturned by the Civil Liability Amendment Bill 2006, such that the average cost observed in 2005/06 might slightly understate future average costs. | ||
Furthermore, as noted in Section 9.1, the impact of the legislation passed in South Australia would be to increase average awards. | ||
Taking all of these factors into consideration we have increased the assumed future nil settlement rate to 12%, compared with 11.5% at our previous valuation (increasing the nil settlement rate reduces the overall liability). |
Page 130
Combining the assumed nil settlement rate of 12% with the assumed average cost per attritional non-nil claim of $260,000 we imply an average cost per claim of $228,800 for the 2006/07 year. This is a reduction of approximately 6% relative to that implied at the previous valuation, $244,700 (being $260,000 x 88.5% x 1.0425 x 1.02). | ||
In determining the appropriateness of this implied assumption, we note in particular that: |
| The most recent complete years experience has been $218,000; | ||
| This will be understated by approximately 2.5%, owing to the impact of CSR vs. Eddy upon past settlement awards, as Sullivan vs. Gordon benefits have been reintroduced in the recent draft NSW Government legislation, the Civil Liability Amendment Bill 2006; and | ||
| Historic experience could be understated owing to the impact of the recent South Australia reforms. |
10.3 | Asbestosis claims | |
As with mesothelioma, the historic asbestosis nil settlement rates have been fairly volatile. |
Page 131
We have reviewed the averages rate over the last 3, 4 and 5 years in determining our assumption. | ||
The last three years (to 2006/07) have averaged 11%, the last four years have averaged 9% and the last five years have averaged 8%. | ||
In these circumstances we have assumed a nil settlement rate of 9.5%, unchanged from our previous valuation. | ||
10.4 | Lung cancer claims | |
As with mesothelioma, the historic asbestosis nil settlement rates have been fairly volatile. |
The average of the last three years (to 2006/07) for lung cancer claims has been 34%, the last four years have averaged 32% and the last five years have averaged 31%. | ||
The nil settlement rate observed in these averages is distorted by the high nil settlement rate for 2005/06 (of 43%) which is higher than the rates observed since 1994/95. In these circumstances we have selected 30% as the future nil settlement rate. This is unchanged from the assumption made at the previous valuation. |
Page 132
We note that this rate could be affected in the future by legal changes to the division and acceptability of claims in relation to claimants who have also smoked and the contribution of smoking to the incidence of lung cancer. At this time, we have no evidence to make any specific adjustment to the assumption for that factor. | ||
10.5 | ARPD & Other claims | |
As with other disease types, there has been significant volatility in the historic nil settlement rates, given the low numbers of claims for this disease. |
The average for the last three years (to 2006/07) for ARPD & Other claims has been 25%, the average for the last four years has been 20% and the average for the last five years has been 20%. | ||
The nil settlement rate observed for 2006/07 is 50%, and relates to only 10 claim settlements. We have not placed significant credibility on the most recent year (2006/07) in selecting our nil settlement rate assumption at this stage. | ||
In these circumstances, we have selected 20% as our nil settlement rate assumption for this class of disease. This is unchanged from our previous assumption. |
Page 133
10.6 | Workers Compensation claims | |
The nil settlement rates for Workers Compensation are high and are reflective of the portion of claims whose costs are fully met by a Workers Compensation Scheme or Policy. The proportion of such claims which are fully met by insurance will have increased over time and are likely to continue to do so in the future. | ||
This trend can be observed in the following chart, which shows that the nil settlement rate has risen from 50% in 1994 to in excess of 90% for each of the last four years. |
The average nil settlement rate of the last three years (to 2006/07) is 95%, the average of the last four years is 95% and the average of the last five years is 94%. |
Based on continuing upward trends in the nil settlement rate, we have selected a rate of 92% at this valuation, increased from our previous assumption of 90%. |
Page 134
10.7 | Wharf claims | |
For wharf claims, the average of the last three years is 9%, the average of the last four years is 26% and the average of the last five years is 32%. We have selected 25% as our valuation assumption which is reduced from our previous assumption of 35%. Given the low volume of claims activity for Wharf claims, this assumption is not material to the liability assessment. |
Page 135
10.8 | Summary assumptions |
The following table provides a summary of our nil settlement rate assumptions at this valuation, and those assumed at the previous valuation. |
Current | Previous | |||
valuation | valuation | |||
assumption | assumption | |||
Mesothelioma | 12% | 11.5% | ||
Asbestosis | 9.5% | 9.5% | ||
Lung Cancer | 30% | 30% | ||
ARPD & Other | 20% | 20% | ||
Wharf | 25% | 35% | ||
Workers Compensation | 92% | 90% |
Page 136
11 | PRODUCT AND PUBLIC LIABILITY INSURANCE PROGRAMME | |
11.1 | Overview | |
Until 31 March 1985, James Hardie had in place General and Products liability insurance covers with a $1m primary policy layer. These were each and every loss contracts which were placed amongst a number of insurance providers on a claims-occurring basis. | ||
In addition, James Hardie maintained further umbrella insurance contracts, with varying retentions and policy limits. That is, the contracts paid all costs arising from claims with exposure in a specified year from the retention up to the relevant policy limit. All claim costs in relation to a given exposure year in excess of the limit would be retained by the Liable Entities. | ||
Product liability claims were insured under these contracts on an in the aggregate basis whilst public liability claims were insured on an each and every loss basis. | ||
The umbrella policies were placed as follows: |
| For the period up to June 1976, the insurance policies were written on a claims occurring basis. The insurance was provided by QBE but the cover provided by these policies was commuted in June 2000 for a consideration of $3.1m per annum for the following 15 years. | ||
| For the period from June 1976 to 1985/86 the insurance policies were written on a claims-occurring basis. CE Heath acted as the underwriting agent and insured the risk into Lloyds of London and the London Market. However, during this period both CE Heath Underwriting Agencies (CEHUA) and CE Heath Underwriting & Insurance (CEH U&I) also insured some of the risk, reinsuring their placement on a facultative basis. | ||
| For the period 1986/87 to 1989/90, the insurance policies were written on a claims made basis. CE Heath acted as the underwriting agent and insured the risk into Lloyds of London and the London market. |
Page 137
| For the period 1990/91 to 1996/97, the insurance policies responded on a claims made basis. However, CE Heath Casualty & General (later HIH Casualty & General, now in liquidation) acted as the insurer of the programme and reinsured it on a facultative basis into Lloyds of London and the London Market. CE Heath Casualty & General retained some share on some of the layers. |
We understand that defence legal costs are additional to the cover. | ||
We have allowed for the benefits of the insurance arrangements of the Liable Entities based on information provided to us by the MRCF relating to the insurance programme. | ||
The methodology describing our approach for valuing the Insurance Recoveries is detailed in Section 5.9. | ||
11.2 | Allowance for Insurance Recoveries | |
It should be noted that only product and public liability Insurance Recoveries are allowed for within our liability assessment, and only in relation to the period of exposure and insurance placement up to, and including, 1985/86. | ||
Insurance protection purchased from 1986 onwards was placed on a claims made basis and as such may not provide protection or recoveries against the cost of future claim notifications made by claimants against the Liable Entities. We have therefore, for the purposes of this report, made no allowance for the value of insurance contracts placed from 1986 onwards in our liability assessment. | ||
We note that a claim of approximately $66m has been made by Amaca on behalf of the Liable Entities against HIH in relation to the insurance programme for the 1990/91 to 1996/97 years. This claim is presently being considered by the liquidators of HIH and we have not, for the purposes of this report, attempted to estimate any recovery for it at this time. | ||
It should be noted that our decision is an actuarial one and is not based on consideration of the legal arguments that might be presented by Amaca, by HIH or by the reinsurers. We present no legal opinion, and have not based our assessment on any such legal opinion, as to the admissibility of the claim or the expected recovery under the claim. | ||
To the extent recovery is made against this claim, the net asset position of the Special Purpose Fund would improve and would reduce the funding requirement. |
Page 138
We have allowed for the value of the QBE commutation entered into in June 2000 which involves the payment to the MRCF of a consideration of $3.1m per annum for 15 years to 30 June 2014. | ||
Where a claim filed under a Scheme of Arrangement has been accepted and payment made, we have assumed that the insurance liabilities of that entity to the Liable Entities have been fully discharged and no further recoveries fall due. | ||
11.3 | Bad debt allowance on Insurance Recoveries | |
We have made allowance for bad debts on future Insurance Recoveries within our valuation by use of the default rates in Appendix A. These have been sourced from Standard & Poors Rating Performance Book, March 2004 and are based on bond default rates. Where additional information regarding the expected payout rates of solvent and insolvent Schemes of Arrangement is available we have instead taken the expected payout rates to assess the credit risk allowance to be made in our liability assessment. | ||
We have considered the credit rating of the insurers of the Liable Entities as at September 2006 and applied the relevant credit rating default rates to the expected future cashflows by year, treaty and insurer. | ||
In relation to those contracts where CEHUA or CEH U&I insured some of the risks (and then facultatively reinsured that risk), we have assumed, for the purposes of this report, that no cut-through from the reinsurers directly to the Liable Entities will take place and that these Insurance Recoveries will rank alongside other creditors of the HIH Group. We note that this is not based on legal opinion and we pass no such opinion. | ||
Were cut-through to be achieved this would be expected to increase the level of Insurance Recoveries, as the financial health of the reinsurers to the HIH Group is generally better than that of the HIH Group itself, so that a lower bad debt charge would apply. | ||
11.4 | Bolton Metropolitan Borough Council vs. Municipal Mutual Insurance Ltd (UK) and Commercial Union | |
11.4.1 | Background | |
In June 2005, a judgment relating to Bolton Metropolitan Borough Council vs. Municipal Mutual Insurance Ltd and Commercial Union (2006) (the Bolton Judgment) was passed down in the Manchester District Court. |
Page 139
The court case involved an asbestos-related exposure of a former employee of Bolton Metropolitan Borough Council, Mr Green. Mr Green worked as a contractor in the 1960s during which period he was exposed to asbestos fibres. He was diagnosed with mesothelioma in January 1991 and died in November 1991. | ||
The case considered which of the periods of insurance of a product and public liability insurance programme of an assured (Bolton MBC in this case) responds to a claim. In particular, it considered when the relevant bodily injury arose for the purposes of determining which insurance policy responds, the alternatives being: |
| The policies in force at the time of the exposure to asbestos (which in some instances may take place over many years and affect a number of different insurers and policy years); | ||
| The policies in force at the time the disease begins to develop or manifest (e.g. the formation of mutating cells defining the date of injury); or | ||
| The policies in force at the time the disease becomes apparent, e.g. through diagnosis. |
In this instance, the Court held that Mr Green became fatally ill at the time the tumour developed and not at the time the asbestos fibres were inhaled. Accordingly the policy in effect at the time of manifestation responded to the claim (i.e. the second definition in the above list of three alternative interpretations). |
The UK High Court agreed and held that Mr Green became fatally ill in or about 1980 at the time the tumour developed, and not earlier at the time the asbestos fibres were inhaled. Accordingly, MMI, who were the insurers on risk during the latter period, were deemed liable to indemnify Bolton Council for the amount it paid in settlement to Mr Greens widow. No liability was attributed to Commercial Union as the court held that Mr Green did not become ill or injured during the period of this insurance cover when the fibre was supposedly inhaled. |
Page 140
The case was appealed and the Court of Appeal handed down its judgment on 6 February 2006 and unanimously concurred with the original decision of the District Court, i.e. that the relevant injury for the purposes of determining which of the insurance policies should indemnify the Bolton Council was the time of the onset of the malignant tumour and not the event of the initial exposure to asbestos. This decision was made on the basis that it was not until the disease manifested itself that Mr. Green had an actionable claim (or first suffered damage) | ||
11.4.2 | Relevant decisions in Australia | |
We understand that there have been a number of judicial decisions in the Australian Courts in the past dealing with this issue of the definition of occurrence of injury, notably: |
| Orica vs. CGU (2003); | ||
| Crimmins vs. Stevedoring Industry Finance Committee (SIFC) (1999); | ||
| GRE vs. Bristile (1991); and | ||
| American Home Assurance Company (AHAC) vs. Saunders (1987). |
However, the High Court has not considered the question and consequently there may be further development in Australian law on this issue. | |||
In the most recent decision, Orica vs. CGU (2003), it was determined that the injury arose when the fibres were inhaled, based on decisions in Favelle Mort vs. Murray (1976) and GRE vs. Bristile (1991), on the grounds that once the fibres were inhaled nothing could be done to avert the onset of disease. The court considered that the fact that in some cases inhalation does not give rise to a manifestation of a disease was not relevant. It is of note that the NSW Government passed legislation under the Workers Compensation Legislation Amendment Bill in June 2004 to nullify some of the other potential impacts of the Orica vs. CGU (2003) decision. | |||
In the case of Crimmins vs. SIFC (1999), Kirby J noted that physiological change took place at the time of exposure and that whilst the injury per se did not take place at the point of exposure, the potentiality to claim for damages arose out of the exposure. | |||
In the case of GRE vs. Bristile (1991), Nicholson J determined that the entry of the fibres into the body constituted injury and referred to four other decisions that indicated personal injury took place at the time of inhalation. |
Page 141
In the case of AHAC vs. Saunders (1987), the Court of Appeal had to consider whether the onset of mesothelioma constituted a bodily injury under the terms of an accident and sickness policy. | ||
Mahoney JA noted that the question was what was the ordinary meaning of bodily injury and noting the earlier decisions of the High Court in Deeble vs. Nott (1941) and Favelle Mort vs. Murray (1976). Mahoney JA considered that the malignancy of mesothelioma was caused by the inhalation of fibres and that the disablement was a consequence of the event that produced the disease (i.e. the inhalation) rather than the manifestation of the disease itself. | ||
11.4.3 | Our approach | |
Even though the Court of Appeal in the UK found that the District Court decision was correct in law having regard to the policy wordings of the insurance contracts in Bolton, it does not mean that the same view will be adopted in Australia (which is the governing law applying to these policies). We note in particular the reasoning applied to date by the Australian Courts in the above decisions and the meaning of injury adopted by Australian Courts, being the inhalation of the asbestos fibres. | ||
In valuing the insurance recoveries, we have not allowed for any application of a Bolton-type judgment being applied to the insurance policies in the period up to 1985 / 86 (being the claims occurring policies period). | ||
We have assumed that these insurance policies will continue to respond to claims occurring by reference to the period of exposure to asbestos (and not the date of manifestation of the disease, or some other definition). It should be noted that we have placed no value on the claims-made policies so the interpretation in relation to these policies is not of relevance in our valuation. | ||
In forming a view and making a determination as to the value of the insurance assets, we have also given consideration to the decisions in Fairchild vs. Glenhaven Funeral Services & Ors [2002] and Barker vs. Corus [2006] but with particular reference to current Australian law under which different rules of causation apply to those in the UK. | ||
To the extent that the Bolton judgment or some similar decision was applied in Australia, the value of the insurance assets of the Liable Entities could be materially impaired. However, at this time, and given the above factors, there is no strong evidence to indicate this to be the case. |
Page 142
11.5 | Expected Insurance Recoveries | |
The following table shows the Insurance Recoveries and the bad debt allowances that we have made within our valuation assessment, including the position allowing for the introduction of the DDT Act 2005 in NSW and also if similar reforms were introduced Australia-wide, on both a discounted and an undiscounted basis. |
Post cost savings in | Post cost savings | |||||||||||||||||||||||
Pre cost savings | NSW Only | Australia-wide | ||||||||||||||||||||||
Undiscounted | Discounted | Undiscounted | Discounted | Undiscounted | Discounted | |||||||||||||||||||
($m) | ($m) | ($m) | ($m) | ($m) | ($m) | |||||||||||||||||||
Gross Liability |
3,756.9 | 1,827.9 | 3,672.3 | 1,788.3 | 3,616.3 | 1,762.0 | ||||||||||||||||||
QBE Recoveries |
(24.8 | ) | (19.5 | ) | (24.8 | ) | (19.5 | ) | (24.8 | ) | (19.5 | ) | ||||||||||||
Product and Public
liability recoveries |
(587.1 | ) | (264.9 | ) | (575.7 | ) | (259.5 | ) | (568.4 | ) | (255.9 | ) | ||||||||||||
Bad Debt Allowance |
99.0 | 46.4 | 97.1 | 45.5 | 95.9 | 44.9 | ||||||||||||||||||
Net Liability after Bad
Debt |
3,244.0 | 1,590.0 | 3,168.9 | 1,554.8 | 3,118.9 | 1,531.5 |
As such, Insurance Recoveries (after allowing for bad debt) support approximately 13% of the gross liabilities. |
The overall bad debt allowance amounts to around 16% of the expected Insurance Recoveries. |
In determining our net liability assessment, we have assumed that the insurance policies of the Liable Entities will continue to respond to relevant claims we have projected as they fall due. Other than making a general credit risk (bad debt) allowance in valuing the Insurance Recoveries, we have assumed they will otherwise be fully recovered. |
To the extent that: |
| one or more significant insurers fail in the future; and/or | ||
| insurers dispute payments due to the Liable Entities; and/or |
Page 143
| legal cases change the way in which insurances respond to claims (e.g. due to changing legal interpretations of the date of loss); and/or | ||
| insurance assets may be subject to claims by non-Australian claimants; and/or | ||
| insurers negotiate commutations of their obligations to the Liable Entities for more or less than our valuation allowance; |
the net liabilities of the Liable Entities would vary accordingly. For example an event resulting in a loss of 10% of the anticipated Insurance Recoveries included in our valuation (in addition to the general bad debt allowance) would increase the net liability by approximately $20 million. |
Page 144
12 | VALUATION RESULTS | |
12.1 | Central estimate liability | |
At 30 September 2006, our central estimate of the liabilities of the Liable Entities (the Discounted Central Estimate) to be met by the Special Purpose Fund taking credit for the anticipated cost savings from the implementation of procedural reforms resulting from the DDT Act 2005 in NSW is $1,554.8m (March 2006: $1,517.0m). | ||
Within that assessment, we have estimated the future cost savings arising from the procedural reforms in NSW as being $35.2m (March 2006: $74.5m), although it should be noted that the reduction in future cost savings is due to some of the projected cost savings at 31 March 2006 having now been realised owing to internal cost savings initiatives by ACS and the DDT Act 2005 and allowed for in our base valuation assumptions at 30 September 2006. | ||
Accordingly our central estimate of the net liabilities of the Liable Entities before any allowance for future cost savings is $1,590.0m (March 2006: $1,591.5m). | ||
If similar reforms as those enacted under the DDT Act 2005 were implemented in States outside of NSW, then our central estimate of the liabilities of the Liable Entities would be $1,531.5m (March 2006: $1,468.0m). That is, we estimate the potential savings from the implementation of procedural reforms in other States at $23.3m (March 2006: $49.0m). However, it should be noted that there has been no indication of a commitment by the Governments of the other States to accept or implement any procedural reforms at this time. | ||
All of the above liability figures are discounted and are net of cross-claim recoveries and Insurance Recoveries. | ||
The following table shows a summary of our central estimate liability assessment and compares the current assessment with previous assessments. |
Page 145
September 2006 | March 2006 | June 2005 | ||||||||||||||||||
$m | $m | $m | ||||||||||||||||||
Gross of | Net of | Net of | Net of | |||||||||||||||||
insurance | Insurance | insurance | insurance | insurance | ||||||||||||||||
recoveries | recoveries | recoveries | recoveries | recoveries | ||||||||||||||||
Total projected
cashflows in current
dollars (uninflated and
undiscounted) |
1,718.7 | 239.7 | 1,479.0 | 1,478.5 | 1,596.9 | |||||||||||||||
Future inflation
allowance (base and
superimposed inflation) |
2,038.2 | 273.3 | 1,764.9 | 1,763.2 | 1,709.1 | |||||||||||||||
Total projected cash-flows with inflation
allowance |
3,756.9 | 512.9 | 3,244.0 | 3,241.7 | 3,306.0 | |||||||||||||||
Discounting allowance |
(1,929.0 | ) | (275.0 | ) | (1,654.0 | ) | (1,650.2 | ) | (1,654.3 | ) | ||||||||||
Net present value
liabilities (pre cost
savings) |
1,827.9 | 237.9 | 1,590.0 | 1,591.5 | 1,651.7 | |||||||||||||||
Net present value
liabilities allowing for
the DDT Act 2005
applying in NSW only* |
1,788.3 | 233.5 | 1,554.8 | 1,517.0 | 1,568.4 | |||||||||||||||
Net present value
liabilities allowing for
procedural reforms
applying nationally** |
1,762.0 | 230.5 | 1,531.5 | 1,468.0 | 1,513.3 |
* | This is based on our estimate that NSW represents 50% of the future liabilities. All future figures showing NSW only use this estimate. | |
** | As noted in Section 6.3.1, the estimation of the legal cost savings arising from the other States is subject to considerably greater uncertainty than those assessed for NSW. |
As we have noted in Section 1.3.1 Workers Compensation claims, being claims by current and former employees of the Liable Entities, are included to the extent that such liabilities are not met by a Workers Compensation Scheme or Policy (as a result of the existence of limits of indemnity and policy deductibles on those contracts of insurance). The amounts of Workers Compensation claims which are met by the contracts of insurance are not included within the definition of a Personal Asbestos Claim and are therefore not met by the Special Purpose Fund. Workers Compensation claims in excess of the insurance limits of indemnity are included in the definition of Personal Asbestos Claim and these amounts are therefore met by the Special Purpose Fund. | ||
We have not allowed for the future Operating Expenses of the Special Purpose Fund or the Liable Entities in the liability assessments. | ||
12.2 | Comparison with previous valuations | |
12.2.1 | Comparison with 31 March 2006 valuation | |
In the absence of any change to the claim projection assumptions from our 31 March 2006 valuation, other than allowing for the changes in the discount rate, we would have projected a Discounted Central Estimate liability of $1,522.5m (net of NSW cost savings) as at 30 September 2006. Consequently, our revised assessment at 30 September 2006 represents an increase of $32.3m from that assessment. | ||
The increase from that net liability estimate is principally a consequence of: |
| An increase in projected future claim numbers, especially for asbestosis claims; and | ||
| An increase in the rate of future claims inflation assumed based on recent emerging trends in overall claim cost inflation; |
| A lower assumed overall average cost per claim based on recent trends; and | ||
| An increase in the proportion of mesothelioma claims which are expected to settle for nil costs. |
Page 147
$m | ||||
Net liability at start of valuation period allowing for
cost savings on NSW only |
1,517.0 | |||
Expected net claims payments |
(35.1 | ) | ||
Unwind of discount |
41.0 | |||
Expected liability at end of valuation period |
1,522.9 | |||
Change in discount rate |
(0.4 | ) | ||
Expected net liability at end of valuation period
adjusted for discount rate |
1,522.5 | |||
Impact of Change in valuation bases: |
||||
- Claim numbers and peak year |
62.6 | |||
- Nil settlement rate |
(8.5 | ) | ||
- Average claims costs and legal costs |
(50.2 | ) | ||
- Claims inflation |
43.4 | |||
- Emerging experience on reported claims and pending
claims |
(15.0 | ) | ||
Total development in net liability |
32.3 | |||
Net liability at end of valuation period allowing for
cost savings in NSW only |
1,554.8 |
Page 148
12.3 | Claims and legal costs | |
We have estimated the amount of plaintiff legal costs contained within settlements made on an inclusive basis and plaintiff and defence legal costs that have been separately identified. | ||
The following chart shows the composition of settlements for the period 2003 to 2005 for each disease type. | ||
We have identified the elements of legal costs (defined as Claims Legal Costs) within our valuation. |
Page 149
Net Liability | Net Liability | Net Liability | ||||||||||
at Sept 2006 | at March 2006 | at June 2005 | ||||||||||
$m | $m | $m | ||||||||||
Net claim costs (excl
Claims Legal Costs) |
1,230.3 | 1,190.6 | 1,222.2 | |||||||||
Total Claims Legal
Costs (plaintiff and
defendant costs) |
359.7 | 400.9 | 429.5 | |||||||||
Net Liability before
cost savings |
1,590.0 | 1,591.5 | 1,651.7 |
NSW | Australia | NSW | Australia | NSW | Australia- | |||||||||||||||||||
Only | -wide | Only | -wide | Only | wide | |||||||||||||||||||
Estimate of cost
savings |
(35.2 | ) | (58.5 | ) | (74.5 | ) | (123.5 | ) | (83.3 | ) | (138.4 | ) | ||||||||||||
Net Liability after
savings |
1,554.8 | 1,531.5 | 1,517.0 | 1,468.0 | 1,568.4 | 1,513.3 | ||||||||||||||||||
Claims Legal Costs
after savings |
324.5 | 301.2 | 326.4 | 277.4 | 346.2 | 291.1 | ||||||||||||||||||
Claims Legal Costs, as
% of gross costs of settlements |
22.1 | % | 20.5 | % | 22.8 | % | 19.4 | % | 24.2 | % | 20.3 | % | ||||||||||||
Claims Legal Costs, as
% of net costs of settlements |
26.4 | % | 24.5 | % | 27.4 | % | 23.3 | % | 28.3 | % | 23.8 | % |
Note: The net present value of the Insurance Recoveries have been assessed as
$237.9m for the September 2006 valuation; $241.2m for the March 2006 valuation; $209.8m
for the June 2005 valuation. |
||
12.4 | Cashflow projections | |
It is worth contextualising the projected rate of future expenditure with that exhibited in the past. |
Page 150
Page 151
Note: The cashflow for 2006/07 included in the chart relates to the remaining 6 months of the financial year. | ||
The underlying cashflows for this chart are detailed in Appendix C, with additional detail in relation to future cost savings separately disclosed. | ||
Given the extremely long-tail nature of asbestos-related liabilities, a small change in an individual assumption can have a significant impact upon the cashflow profile of the liabilities. | ||
12.5 | Final Funding Agreement calculations | |
The Final Funding Agreement sets out the basis on which payments will be made to the Special Purpose Fund. Additionally, there are a number of other figures specified within the Final Funding Agreement that we are required to calculate. These are: |
| Discounted Central Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, after allowing for Insurance and Other Recoveries. |
Page 152
| Term Central Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, in each case which are reasonably expected to become payable up to 31 March 2045, after allowing for Insurance and Other Recoveries. | ||
| Period Actuarial Estimate: This is the central estimate of the present value of the liabilities of the Former James Hardie Companies and Marlew in respect of expected Proven Claims and Claims Legal Costs, in each case which are reasonably expected to become payable in the next three years, before allowing for Insurance and Other Recoveries. |
Post cost savings | ||||
(NSW only) | ||||
Discounted Central Estimate (net of cross-claim
recoveries, Insurance and Other Recoveries) |
1,554.8 | |||
Period Actuarial Estimate (net of cross-claim
recoveries, gross of Insurance and Other Recoveries)
comprising: |
199.9 | |||
Discounted value of cashflow in 2006/07 |
37.0 | |||
Discounted value of cashflow in 2007/08 |
75.0 | |||
Discounted value of cashflow in 2008/09 |
88.0 | |||
Term Central Estimate (net of cross-claim recoveries,
Insurance and Other Recoveries) |
1,550.9 |
| the net asset position of the Special Purpose Fund at that time; | ||
| the free cash flow amount of the JHINV Group in the preceding financial year; and | ||
| the Period Actuarial Estimate in the latest Annual Actuarial Report. |
Page 153
12.6 | Accounting liability calculations | |
The determination of the accounting liability to be established by James Hardie is ultimately a decision for the Board of James Hardie. | ||
However, the calculation of the accounting liability is, in part, based upon the liabilities we have estimated within this report. | ||
The cashflows used in the derivation of the accounting liability are net of NSW cost savings and are uninflated and undiscounted (UIUD). | ||
No credit is taken within the determination of the accounting liability under US GAAP for cross claim recoveries from third parties until such recoveries have been received, and additional bad debt charges are held in relation to Equitas for accounting purposes. | ||
The provision we have estimated, consistent with the accounting basis for the liability determination, is for a gross of tax UIUD provision of $1,473.8m. | ||
Additional allowance is then made for the expected claims handling costs to be incurred in managing these liabilities and these are then offset by the assets of the MRCF in calculating the accounting liability, which is then also adjusted for tax and converted to US dollars. | ||
Appendix I details the basis of our calculations in arriving at the accounting liability. |
Page 154
13 | UNCERTAINTY | |
13.1 | Overview | |
There is uncertainty involved in any valuation of the liabilities of an insurance company or a self-insurer. The sources of such uncertainty include: |
| Parameter error this is the risk that the parameters and assumptions chosen ultimately prove not to be reflective of future experience. | ||
| Model error this is the risk that the model selected for the valuation of the liabilities ultimately proves not to be adequate for the projection of the liabilities. | ||
| Legal and social developments this is the risk that the legal environment in which claims are settled changes relative to its current and historic position thereby causing significantly different awards. | ||
| Future actual rates of inflation. | ||
| The general economic environment. | ||
| Potential sources of exposure this is the risk that there exist sources of exposure which are as yet unknown or unquantifiable, or for which no liabilities have yet been observed, but which may trigger future claims. |
In the case of asbestos liabilities, these uncertainties are exacerbated by the extremely long latency period from exposure to onset of disease and notification of a claim. Asbestos-related claims often take in excess of 40 years from original exposure or event, compared with 4-5 years for many other liabilities such as Comprehensive Third-Party or other Workers Compensation claims. These specific forms of uncertainty include: |
| The difficulty in quantifying the extent and pattern of past asbestos exposures and the number and incidence of the ultimate number of lives that may be affected by asbestos related diseases arising from such past asbestos exposures; | ||
| The propensity of individuals affected by diseases arising from such exposure to file common law claims against defendants; | ||
| The extent to which the Liable Entities will be joined in such future common law claims; |
Page 155
| The fact that the ultimate severity of the impact of the disease and the quantum of the claims that will be awarded will be subject to the outcome of events that have not yet occurred, including: |
§ | medical and epidemiological developments; | ||
§ | court interpretations; | ||
§ | legislative changes; | ||
§ | changes to the form and range of benefits for which compensation may be awarded (heads of damage); | ||
§ | public attitudes to claiming; | ||
§ | the impact of new (and future) procedural reforms in NSW upon the legal costs incurred in managing and settling claims; | ||
§ | the potential for future procedural reforms in other States affecting the legal costs incurred in managing and settling claims in those States; | ||
§ | potential third-wave exposures; and | ||
§ | social and economic conditions such as inflation. |
Furthermore, within this valuation there is additional uncertainty arising from the estimation of the potential legal cost savings resulting from the DDT Act 2005 and estimation of the equivalent Australia-wide application of similar reforms. Such savings will depend in part upon the future approach adopted by both defendant and plaintiff lawyers and their clients which is inevitably difficult to gauge at this early stage. | ||
13.2 | Sensitivity testing | |
As we have noted above, there are many sources of uncertainty. Actuaries often perform sensitivity testing to identify the impact of different assumptions as to future experience, thereby providing an indication of the degree of parameter error risk to which the valuation assessment is exposed. | ||
Sensitivity testing may be considered as being a mechanism for testing what will the liabilities be if instead of choosing [x] for assumption [a] we chose [y]? It is also a mechanism for identifying how the result will change if experience turns out different in a particular way relative to that which underlies the central estimate expectations. As such, it provides an indication of the level of variability inherent in the valuation. |
Page 156
| nil settlement rate: 5 percentage points above and below our best estimate assumption. | ||
| average claim cost of a non-nil claim: 10% above and below our best estimate assumption. | ||
| peak year of claims: increase/decrease by 1, 3 and 5 years. |
||
| number of claims notified: 5% above and below our best estimate assumption. | ||
| superimposed inflation: 2.25% per annum superimposed inflation for 5 years reducing to -2% per annum after a further five years and remaining at -2% per annum thereafter; and 6.25% per annum superimposed inflation for the next five years, linearly reducing to 2.25% per annum after a further five years and remaining at 2.25% per annum thereafter. | ||
| discount rates: 1 percentage point above and below our best estimate assumption. | ||
| base inflation: 1 percentage point above and below our best estimate assumption. |
| The cross-claim recovery rate; | ||
| The pattern of claim notifications; and | ||
| The pattern and delay of claim settlements from claim notification. |
Page 157
13.3 | Results of sensitivity testing | |
Figure 13.1 shows the impact of various individual sensitivity tests on the Discounted Central Estimate of the liabilities, and of a combined sensitivity test of a number of factors. | ||
It should be noted that although we have tested multiple scenarios of each assumption, one cannot gauge an overall potential range by simply adding these tests together. | ||
It should also be noted that because of the interactions between assumptions, the maximum range will not be the sum of the constituent parts. Rather it is important to recognise that it is unlikely that all assumptions would deteriorate together, and there are often compensating upsides to the downsides that can arise. This is especially so when considering the inter-dependencies and correlations between parameters, such as higher inflation often being associated with higher discount rates: the former would increase the liabilities whilst the latter would decrease the liabilities. | ||
As such, in the figure below, we have considered the relationship between base inflation and the discount rate as the key sensitivity test rather than each assumption independently. |
Page 158
* | The superimposed inflation sensitivity tests are for 6.25% per annum for 5 years reducing to 2.25% per annum; and 2.25% per annum for 5 years reducing to 2% per annum. |
Page 159
* | The superimposed inflation sensitivity tests are for 6.25% per annum for 5 years reducing to 2.25% per annum; and 2.25% per annum for 5 years reducing to 2% per annum. |
Page 160
Page 161
Rating | Yr. 1 | Yr. 2 | Yr. 3 | Yr. 4 | Yr. 5 | Yr. 6 | Yr. 7 | Yr. 8 | Yr. 9 | Yr. 10 | Yr. 11 | Yr. 12 | Yr. 13 | Yr. 14 | Yr. 15 | |||||||||||||||||||||||||||||||||||||||||||||
AAA |
0.0 | % | 0.0 | % | 0.0 | % | 0.1 | % | 0.1 | % | 0.2 | % | 0.3 | % | 0.4 | % | 0.4 | % | 0.5 | % | 0.5 | % | 0.5 | % | 0.5 | % | 0.6 | % | 0.7 | % | ||||||||||||||||||||||||||||||
AA+ |
0.0 | % | 0.0 | % | 0.0 | % | 0.1 | % | 0.2 | % | 0.3 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | 0.4 | % | ||||||||||||||||||||||||||||||
AA |
0.0 | % | 0.0 | % | 0.0 | % | 0.1 | % | 0.1 | % | 0.2 | % | 0.3 | % | 0.5 | % | 0.6 | % | 0.8 | % | 0.9 | % | 1.0 | % | 1.2 | % | 1.3 | % | 1.4 | % | ||||||||||||||||||||||||||||||
AA- |
0.0 | % | 0.1 | % | 0.2 | % | 0.4 | % | 0.6 | % | 0.7 | % | 1.0 | % | 1.1 | % | 1.2 | % | 1.3 | % | 1.5 | % | 1.7 | % | 1.7 | % | 1.8 | % | 2.0 | % | ||||||||||||||||||||||||||||||
A+ |
0.1 | % | 0.1 | % | 0.3 | % | 0.5 | % | 0.6 | % | 0.8 | % | 1.0 | % | 1.2 | % | 1.5 | % | 1.8 | % | 2.1 | % | 2.4 | % | 2.7 | % | 2.9 | % | 3.2 | % | ||||||||||||||||||||||||||||||
A |
0.1 | % | 0.1 | % | 0.2 | % | 0.3 | % | 0.5 | % | 0.7 | % | 0.9 | % | 1.2 | % | 1.4 | % | 1.8 | % | 2.2 | % | 2.4 | % | 2.6 | % | 2.7 | % | 3.0 | % | ||||||||||||||||||||||||||||||
A- |
0.0 | % | 0.2 | % | 0.4 | % | 0.6 | % | 0.9 | % | 1.2 | % | 1.6 | % | 1.8 | % | 2.2 | % | 2.4 | % | 2.5 | % | 2.7 | % | 2.8 | % | 3.0 | % | 3.2 | % | ||||||||||||||||||||||||||||||
BBB+ |
0.3 | % | 0.9 | % | 1.6 | % | 2.2 | % | 2.8 | % | 3.5 | % | 4.0 | % | 4.4 | % | 4.9 | % | 5.4 | % | 5.8 | % | 6.1 | % | 6.7 | % | 7.5 | % | 8.4 | % | ||||||||||||||||||||||||||||||
BBB |
0.3 | % | 0.7 | % | 1.1 | % | 1.7 | % | 2.4 | % | 3.0 | % | 3.7 | % | 4.5 | % | 5.1 | % | 5.9 | % | 6.8 | % | 7.3 | % | 7.9 | % | 8.2 | % | 8.8 | % | ||||||||||||||||||||||||||||||
BBB- |
0.5 | % | 1.5 | % | 2.6 | % | 4.1 | % | 5.5 | % | 6.9 | % | 7.9 | % | 8.7 | % | 9.4 | % | 10.2 | % | 10.9 | % | 11.8 | % | 12.3 | % | 13.1 | % | 13.8 | % | ||||||||||||||||||||||||||||||
BB+ |
0.6 | % | 2.1 | % | 4.3 | % | 6.1 | % | 7.6 | % | 9.2 | % | 10.8 | % | 11.5 | % | 12.7 | % | 13.7 | % | 14.4 | % | 14.9 | % | 15.2 | % | 15.6 | % | 16.5 | % | ||||||||||||||||||||||||||||||
BB |
1.2 | % | 3.4 | % | 6.2 | % | 8.6 | % | 11.0 | % | 13.4 | % | 15.1 | % | 16.6 | % | 18.1 | % | 19.1 | % | 20.3 | % | 21.1 | % | 21.5 | % | 21.6 | % | 21.6 | % | ||||||||||||||||||||||||||||||
BB- |
2.0 | % | 5.7 | % | 9.6 | % | 13.2 | % | 16.3 | % | 19.1 | % | 21.3 | % | 23.4 | % | 25.3 | % | 26.7 | % | 28.0 | % | 28.8 | % | 30.0 | % | 30.7 | % | 31.5 | % | ||||||||||||||||||||||||||||||
B+ |
3.2 | % | 8.9 | % | 14.2 | % | 18.8 | % | 22.0 | % | 24.4 | % | 26.7 | % | 28.6 | % | 30.1 | % | 31.6 | % | 32.9 | % | 34.1 | % | 35.2 | % | 36.4 | % | 37.5 | % | ||||||||||||||||||||||||||||||
B |
9.0 | % | 17.9 | % | 24.3 | % | 28.4 | % | 31.5 | % | 34.1 | % | 35.5 | % | 36.7 | % | 37.7 | % | 38.6 | % | 39.5 | % | 40.7 | % | 41.9 | % | 42.8 | % | 44.0 | % | ||||||||||||||||||||||||||||||
B- |
13.0 | % | 23.6 | % | 31.5 | % | 36.2 | % | 39.2 | % | 41.6 | % | 43.8 | % | 45.4 | % | 45.9 | % | 46.5 | % | 46.9 | % | 47.1 | % | 47.4 | % | 47.6 | % | 47.9 | % | ||||||||||||||||||||||||||||||
CCC+ |
30.9 | % | 39.8 | % | 45.5 | % | 49.5 | % | 53.0 | % | 53.4 | % | 55.5 | % | 56.1 | % | 57.6 | % | 58.4 | % | 59.3 | % | 60.1 | % | 60.8 | % | 61.6 | % | 61.6 | % | ||||||||||||||||||||||||||||||
L |
0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | 0.0 | % | ||||||||||||||||||||||||||||||
NR |
5.3 | % | 10.5 | % | 15.1 | % | 18.7 | % | 21.6 | % | 24.0 | % | 25.9 | % | 27.5 | % | 28.9 | % | 30.0 | % | 31.1 | % | 32.1 | % | 33.0 | % | 33.7 | % | 34.5 | % | ||||||||||||||||||||||||||||||
R |
100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % | 100.0 | % |
Page 162
Page 163
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
274.1 | 50.1 | 12.9 | 12.3 | 28.7 | 378.2 | 51.3 | 326.9 | 2.6 | 0.4 | 3.0 | 2.3 | 6.8 | 2.7 | 328.1 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
330.7 | 53.7 | 15.1 | 13.0 | 40.7 | 453.2 | 55.9 | 397.3 | 2.7 | 0.6 | 3.3 | 2.1 | 8.1 | 1.7 | 396.2 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
297.0 | 44.7 | 14.2 | 10.8 | 36.5 | 403.2 | 47.1 | 356.1 | 2.2 | 0.6 | 2.8 | 1.4 | 7.2 | 0.9 | 354.0 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
217.8 | 30.8 | 11.3 | 7.5 | 26.2 | 293.5 | 34.3 | 259.3 | 1.5 | 0.4 | 1.9 | 0.7 | 5.3 | 0.4 | 257.1 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
228.7 | 29.9 | 14.0 | 7.3 | 26.9 | 306.8 | 49.4 | 257.4 | 1.5 | 0.4 | 1.9 | 0.5 | 5.5 | 0.2 | 254.6 | |||||||||||||||||||||||||||||||||||||||||||||
All |
1,348.3 | 209.1 | 67.6 | 50.9 | 159.0 | 1,834.9 | 237.9 | 1,596.9 | 10.5 | 2.3 | 12.9 | 7.0 | 32.9 | 6.1 | 1,590.0 | |||||||||||||||||||||||||||||||||||||||||||||
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
314.0 | 57.2 | 14.7 | 14.0 | 32.9 | 432.9 | 58.7 | 374.2 | 2.9 | 0.5 | 3.4 | 2.6 | 7.8 | 3.1 | 375.4 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
486.4 | 78.8 | 22.3 | 19.1 | 59.9 | 666.5 | 81.9 | 584.6 | 3.9 | 0.9 | 4.8 | 3.0 | 11.9 | 2.5 | 583.0 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
565.0 | 84.9 | 27.1 | 20.6 | 69.4 | 767.0 | 89.8 | 677.1 | 4.2 | 1.1 | 5.3 | 2.6 | 13.7 | 1.8 | 673.0 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
535.9 | 75.7 | 27.8 | 18.4 | 64.4 | 722.2 | 84.6 | 637.5 | 3.8 | 1.0 | 4.8 | 1.8 | 12.9 | 1.1 | 632.3 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
884.4 | 115.5 | 56.7 | 28.0 | 104.6 | 1,189.3 | 197.9 | 991.4 | 5.7 | 1.5 | 7.3 | 1.9 | 21.3 | 0.9 | 980.2 | |||||||||||||||||||||||||||||||||||||||||||||
All |
2,785.7 | 412.1 | 148.7 | 100.1 | 331.2 | 3,777.8 | 512.9 | 3,264.8 | 20.6 | 4.9 | 25.5 | 12.0 | 67.7 | 9.2 | 3,244.0 | |||||||||||||||||||||||||||||||||||||||||||||
Page 164
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
270.5 | 49.6 | 12.8 | 12.1 | 27.1 | 372.1 | 50.6 | 321.5 | 2.5 | 0.4 | 2.9 | 2.3 | 6.8 | 2.7 | 322.7 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
325.8 | 52.8 | 14.9 | 12.8 | 36.6 | 443.0 | 54.9 | 388.1 | 2.6 | 0.5 | 3.2 | 2.0 | 8.0 | 1.7 | 387.1 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
292.6 | 44.0 | 14.0 | 10.7 | 32.6 | 393.8 | 46.1 | 347.7 | 2.2 | 0.5 | 2.7 | 1.3 | 7.1 | 0.9 | 345.6 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
214.6 | 30.3 | 11.1 | 7.4 | 23.3 | 286.7 | 33.4 | 253.2 | 1.5 | 0.4 | 1.9 | 0.7 | 5.2 | 0.4 | 251.1 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
225.3 | 29.4 | 13.8 | 7.1 | 24.0 | 299.6 | 48.4 | 251.2 | 1.5 | 0.4 | 1.8 | 0.5 | 5.4 | 0.2 | 248.4 | |||||||||||||||||||||||||||||||||||||||||||||
All |
1,328.9 | 206.1 | 66.6 | 50.1 | 143.6 | 1,795.3 | 233.5 | 1,561.8 | 10.4 | 2.1 | 12.5 | 6.9 | 32.4 | 6.1 | 1,554.8 | |||||||||||||||||||||||||||||||||||||||||||||
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
309.9 | 56.6 | 14.6 | 13.9 | 31.0 | 425.9 | 57.9 | 367.9 | 2.9 | 0.4 | 3.3 | 2.6 | 7.7 | 3.1 | 369.2 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
479.3 | 77.6 | 21.9 | 18.8 | 53.9 | 651.5 | 80.3 | 571.1 | 3.9 | 0.8 | 4.7 | 3.0 | 11.8 | 2.5 | 569.5 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
556.7 | 83.5 | 26.7 | 20.3 | 61.9 | 749.1 | 87.9 | 661.2 | 4.2 | 0.9 | 5.1 | 2.5 | 13.5 | 1.8 | 657.1 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
528.0 | 74.5 | 27.4 | 18.1 | 57.4 | 705.3 | 82.6 | 622.7 | 3.7 | 0.9 | 4.6 | 1.8 | 12.7 | 1.1 | 617.4 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
871.4 | 113.6 | 55.8 | 27.6 | 93.1 | 1,161.5 | 194.7 | 966.8 | 5.6 | 1.4 | 7.0 | 1.9 | 21.0 | 0.9 | 955.6 | |||||||||||||||||||||||||||||||||||||||||||||
All |
2,745.2 | 405.7 | 146.4 | 98.6 | 297.3 | 3,693.3 | 503.5 | 3,189.8 | 20.3 | 4.4 | 24.7 | 11.7 | 66.7 | 9.2 | 3,168.9 | |||||||||||||||||||||||||||||||||||||||||||||
Page 165
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
268.1 | 49.2 | 12.7 | 12.1 | 26.1 | 368.1 | 50.2 | 318.0 | 2.5 | 0.4 | 2.9 | 2.3 | 6.7 | 2.7 | 319.2 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
322.6 | 52.3 | 14.7 | 12.7 | 33.9 | 436.3 | 54.2 | 382.1 | 2.6 | 0.5 | 3.1 | 2.0 | 7.9 | 1.7 | 381.0 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
289.7 | 43.5 | 13.9 | 10.5 | 30.0 | 387.6 | 45.4 | 342.2 | 2.2 | 0.5 | 2.6 | 1.3 | 7.0 | 0.9 | 340.0 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
212.5 | 30.0 | 11.0 | 7.3 | 21.4 | 282.1 | 32.9 | 249.2 | 1.5 | 0.3 | 1.8 | 0.7 | 5.1 | 0.4 | 247.1 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
223.1 | 29.1 | 13.7 | 7.1 | 22.0 | 294.9 | 47.8 | 247.1 | 1.4 | 0.3 | 1.8 | 0.5 | 5.4 | 0.2 | 244.2 | |||||||||||||||||||||||||||||||||||||||||||||
All |
1,316.1 | 204.0 | 65.9 | 49.6 | 133.4 | 1,769.0 | 230.5 | 1,538.5 | 10.3 | 2.0 | 12.2 | 6.8 | 32.1 | 6.1 | 1,531.5 | |||||||||||||||||||||||||||||||||||||||||||||
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General | Net | Workers | Compensation | Workers | Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lung | ARPD & | Defendant | Liability | Insurance | General | Compensation | Legal | Compensation | Wharf | Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Years | Mesothelioma | Asbestosis | Cancer | Other | Legal Costs | Cost | Recoveries | Liability | Claims | Costs | Costs | Claims | Recoveries | Baryulgil | Net Liabilities | |||||||||||||||||||||||||||||||||||||||||||||
1-5 |
307.1 | 56.1 | 14.5 | 13.8 | 29.8 | 421.2 | 57.4 | 363.8 | 2.9 | 0.4 | 3.3 | 2.6 | 7.7 | 3.1 | 365.1 | |||||||||||||||||||||||||||||||||||||||||||||
6-10 |
474.6 | 76.7 | 21.7 | 18.6 | 49.9 | 641.5 | 79.3 | 562.2 | 3.8 | 0.7 | 4.6 | 2.9 | 11.6 | 2.5 | 560.6 | |||||||||||||||||||||||||||||||||||||||||||||
11-15 |
551.2 | 82.6 | 26.4 | 20.0 | 57.0 | 737.3 | 86.6 | 650.7 | 4.1 | 0.9 | 5.0 | 2.5 | 13.4 | 1.8 | 646.5 | |||||||||||||||||||||||||||||||||||||||||||||
16-20 |
522.8 | 73.7 | 27.1 | 17.9 | 52.7 | 694.1 | 81.3 | 612.8 | 3.7 | 0.8 | 4.5 | 1.7 | 12.6 | 1.1 | 607.5 | |||||||||||||||||||||||||||||||||||||||||||||
21+ |
862.8 | 112.4 | 55.2 | 27.3 | 85.5 | 1,143.2 | 192.8 | 950.4 | 5.6 | 1.3 | 6.8 | 1.8 | 20.7 | 0.9 | 939.2 | |||||||||||||||||||||||||||||||||||||||||||||
All |
2,718.4 | 401.5 | 144.9 | 97.6 | 274.9 | 3,637.3 | 497.4 | 3,139.9 | 20.1 | 4.1 | 24.2 | 11.5 | 66.0 | 9.2 | 3,118.9 | |||||||||||||||||||||||||||||||||||||||||||||
Page 166
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
23.5 | 6.3 | 1.6 | 1.6 | 3.9 | 0.4 | 0.1 | 0.3 | 0.0 | 0.6 | 0.6 | 37.7 | 4.3 | 33.4 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
60.5 | 9.8 | 2.5 | 2.3 | 5.2 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.5 | 80.5 | 11.6 | 68.9 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
73.7 | 13.1 | 3.4 | 3.2 | 6.8 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 1.8 | 100.4 | 13.8 | 86.6 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
75.4 | 13.7 | 3.5 | 3.4 | 8.0 | 0.7 | 0.1 | 0.6 | 0.1 | 0.6 | 1.9 | 104.2 | 14.3 | 89.9 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
80.9 | 14.2 | 3.7 | 3.5 | 9.1 | 0.7 | 0.1 | 0.6 | 0.1 | 0.6 | 2.0 | 111.4 | 14.8 | 96.6 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
86.7 | 14.7 | 3.9 | 3.6 | 10.2 | 0.7 | 0.1 | 0.6 | 0.1 | 0.6 | 2.1 | 119.0 | 15.8 | 103.2 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
92.2 | 15.3 | 4.2 | 3.7 | 11.4 | 0.8 | 0.2 | 0.6 | 0.1 | 0.5 | 2.3 | 126.7 | 16.2 | 110.5 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
98.0 | 15.8 | 4.5 | 3.8 | 12.5 | 0.8 | 0.2 | 0.5 | 0.1 | 0.5 | 2.4 | 134.3 | 16.7 | 117.6 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
102.6 | 16.3 | 4.7 | 4.0 | 12.7 | 0.8 | 0.2 | 0.5 | 0.1 | 0.5 | 2.5 | 139.9 | 17.7 | 122.2 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
106.9 | 16.6 | 4.9 | 4.0 | 13.1 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.6 | 145.1 | 15.6 | 129.5 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
110.1 | 16.9 | 5.1 | 4.1 | 13.5 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.7 | 149.0 | 16.6 | 132.4 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
112.4 | 17.1 | 5.3 | 4.1 | 13.8 | 0.9 | 0.2 | 0.5 | 0.1 | 0.4 | 2.7 | 151.9 | 17.5 | 134.4 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
113.9 | 17.1 | 5.5 | 4.2 | 14.0 | 0.9 | 0.2 | 0.4 | 0.1 | 0.4 | 2.8 | 153.8 | 18.3 | 135.5 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
114.5 | 17.0 | 5.6 | 4.1 | 14.1 | 0.9 | 0.2 | 0.4 | 0.1 | 0.3 | 2.8 | 154.4 | 18.9 | 135.5 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
114.2 | 16.8 | 5.7 | 4.1 | 14.0 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.8 | 153.7 | 18.5 | 135.2 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
113.0 | 16.4 | 5.7 | 4.0 | 13.8 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.7 | 151.8 | 16.6 | 135.1 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
110.9 | 15.9 | 5.7 | 3.9 | 13.4 | 0.8 | 0.2 | 0.3 | 0.1 | 0.2 | 2.7 | 148.7 | 16.9 | 131.8 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
108.0 | 15.3 | 5.6 | 3.7 | 13.0 | 0.8 | 0.2 | 0.3 | 0.0 | 0.2 | 2.6 | 144.4 | 17.1 | 127.3 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
104.2 | 14.5 | 5.5 | 3.5 | 12.4 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.5 | 139.1 | 17.1 | 122.0 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
99.8 | 13.7 | 5.3 | 3.3 | 11.9 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.4 | 132.9 | 16.9 | 116.0 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
94.8 | 12.8 | 5.2 | 3.1 | 11.2 | 0.6 | 0.2 | 0.2 | 0.0 | 0.1 | 2.3 | 126.0 | 16.6 | 109.4 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
89.3 | 11.9 | 4.9 | 2.9 | 10.5 | 0.6 | 0.2 | 0.2 | 0.0 | 0.1 | 2.1 | 118.4 | 16.2 | 102.3 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
83.4 | 11.0 | 4.7 | 2.7 | 9.7 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 2.0 | 110.5 | 15.7 | 94.8 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
77.1 | 10.1 | 4.4 | 2.4 | 9.0 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 1.8 | 102.1 | 15.1 | 87.1 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
70.7 | 9.1 | 4.2 | 2.2 | 8.2 | 0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 1.7 | 93.6 | 14.6 | 79.0 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
64.3 | 8.2 | 3.9 | 2.0 | 7.5 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.5 | 85.1 | 13.9 | 71.1 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
57.9 | 7.4 | 3.6 | 1.8 | 6.7 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.4 | 76.7 | 13.2 | 63.4 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
51.8 | 6.6 | 3.3 | 1.6 | 6.0 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.2 | 68.6 | 12.5 | 56.1 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
45.9 | 5.8 | 3.0 | 1.4 | 5.4 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.1 | 60.8 | 11.7 | 49.0 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
40.3 | 5.1 | 2.7 | 1.2 | 4.7 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.0 | 53.4 | 10.9 | 42.5 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
35.1 | 4.4 | 2.4 | 1.1 | 4.1 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.8 | 46.6 | 10.1 | 36.5 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
30.3 | 3.8 | 2.1 | 0.9 | 3.6 | 0.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.7 | 40.3 | 9.3 | 31.0 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
25.9 | 3.3 | 1.9 | 0.8 | 3.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.6 | 34.6 | 8.3 | 26.3 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
21.9 | 2.8 | 1.7 | 0.7 | 2.6 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 29.4 | 6.1 | 23.4 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
18.5 | 2.4 | 1.4 | 0.6 | 2.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 24.8 | 5.4 | 19.4 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
15.4 | 2.0 | 1.2 | 0.5 | 1.9 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 20.8 | 4.9 | 15.9 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
12.7 | 1.7 | 1.1 | 0.4 | 1.6 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 17.2 | 3.2 | 14.0 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
10.4 | 1.4 | 0.9 | 0.3 | 1.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 14.2 | 2.2 | 11.9 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
8.5 | 1.1 | 0.8 | 0.3 | 1.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.6 | 1.7 | 9.9 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
6.8 | 0.9 | 0.7 | 0.2 | 0.9 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.4 | 1.4 | 8.0 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
5.4 | 0.8 | 0.5 | 0.2 | 0.7 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.5 | 1.1 | 6.5 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
4.3 | 0.6 | 0.5 | 0.1 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 6.0 | 0.8 | 5.2 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
3.4 | 0.5 | 0.4 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.8 | 0.7 | 4.1 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
2.6 | 0.4 | 0.3 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.7 | 0.5 | 3.2 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
2.0 | 0.3 | 0.2 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 2.9 | 0.4 | 2.5 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
1.5 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.2 | 0.3 | 1.9 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
1.2 | 0.2 | 0.2 | 0.0 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.7 | 0.2 | 1.5 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.9 | 0.2 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.3 | 0.2 | 1.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.7 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.0 | 0.1 | 0.9 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.8 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.6 | 0.1 | 0.5 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
2,785.7 | 412.1 | 148.7 | 100.1 | 331.2 | 20.6 | 4.9 | 10.6 | 1.4 | 9.2 | 67.7 | 3,756.9 | 512.9 | 3,244.0 | ||||||||||||||||||||||||||||||||||||||||||
Page 167
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
23.4 | 6.3 | 1.6 | 1.6 | 3.8 | 0.4 | 0.0 | 0.3 | 0.0 | 0.6 | 0.6 | 37.5 | 4.3 | 33.2 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
59.7 | 9.8 | 2.5 | 2.3 | 5.0 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.5 | 79.5 | 11.4 | 68.0 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
72.7 | 13.0 | 3.3 | 3.2 | 6.4 | 0.6 | 0.1 | 0.5 | 0.1 | 0.6 | 1.8 | 98.7 | 13.6 | 85.1 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
74.3 | 13.5 | 3.5 | 3.3 | 7.4 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 1.9 | 102.2 | 14.1 | 88.2 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
79.7 | 14.0 | 3.7 | 3.4 | 8.3 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 2.0 | 109.2 | 14.6 | 94.6 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
85.4 | 14.5 | 3.9 | 3.5 | 9.3 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 2.1 | 116.5 | 15.6 | 100.9 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
90.9 | 15.1 | 4.1 | 3.7 | 10.3 | 0.8 | 0.1 | 0.5 | 0.1 | 0.5 | 2.2 | 123.8 | 15.9 | 108.0 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
96.5 | 15.6 | 4.4 | 3.8 | 11.2 | 0.8 | 0.2 | 0.5 | 0.1 | 0.5 | 2.4 | 131.2 | 16.4 | 114.8 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
101.1 | 16.1 | 4.6 | 3.9 | 11.4 | 0.8 | 0.2 | 0.5 | 0.1 | 0.5 | 2.5 | 136.7 | 17.3 | 119.3 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
105.3 | 16.4 | 4.8 | 4.0 | 11.7 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.6 | 141.7 | 15.2 | 126.5 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
108.5 | 16.7 | 5.1 | 4.0 | 12.0 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.6 | 145.6 | 16.2 | 129.3 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
110.7 | 16.8 | 5.2 | 4.1 | 12.3 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.7 | 148.4 | 17.1 | 131.3 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
112.2 | 16.8 | 5.4 | 4.1 | 12.5 | 0.8 | 0.2 | 0.4 | 0.1 | 0.4 | 2.7 | 150.2 | 17.9 | 132.3 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
112.8 | 16.7 | 5.5 | 4.1 | 12.6 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.7 | 150.8 | 18.4 | 132.3 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
112.5 | 16.5 | 5.6 | 4.0 | 12.5 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.7 | 150.1 | 18.2 | 131.9 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
111.3 | 16.1 | 5.6 | 3.9 | 12.3 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.7 | 148.2 | 16.3 | 131.9 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
109.3 | 15.6 | 5.6 | 3.8 | 11.9 | 0.8 | 0.2 | 0.3 | 0.0 | 0.2 | 2.6 | 145.2 | 16.5 | 128.7 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
106.4 | 15.0 | 5.5 | 3.6 | 11.6 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.6 | 141.0 | 16.7 | 124.3 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
102.7 | 14.2 | 5.4 | 3.5 | 11.1 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.5 | 135.8 | 16.7 | 119.1 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
98.3 | 13.4 | 5.3 | 3.3 | 10.6 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.4 | 129.8 | 16.5 | 113.3 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
93.4 | 12.6 | 5.1 | 3.1 | 10.0 | 0.6 | 0.1 | 0.2 | 0.0 | 0.1 | 2.2 | 123.0 | 16.2 | 106.8 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
87.9 | 11.7 | 4.9 | 2.8 | 9.3 | 0.6 | 0.1 | 0.2 | 0.0 | 0.1 | 2.1 | 115.7 | 15.8 | 99.9 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
82.1 | 10.8 | 4.6 | 2.6 | 8.7 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 2.0 | 107.9 | 15.3 | 92.6 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
76.0 | 9.9 | 4.4 | 2.4 | 8.0 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 1.8 | 99.7 | 14.7 | 85.0 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
69.7 | 9.0 | 4.1 | 2.2 | 7.3 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.7 | 91.4 | 14.2 | 77.2 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
63.3 | 8.1 | 3.8 | 2.0 | 6.7 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.5 | 83.1 | 13.6 | 69.5 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
57.1 | 7.3 | 3.5 | 1.8 | 6.0 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.4 | 74.9 | 12.9 | 61.9 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
51.0 | 6.5 | 3.2 | 1.6 | 5.4 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.2 | 66.9 | 12.2 | 54.7 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
45.2 | 5.7 | 2.9 | 1.4 | 4.8 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.1 | 59.3 | 11.5 | 47.9 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
39.7 | 5.0 | 2.6 | 1.2 | 4.2 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 1.0 | 52.2 | 10.7 | 41.5 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
34.5 | 4.4 | 2.4 | 1.1 | 3.7 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.8 | 45.5 | 9.9 | 35.6 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
29.8 | 3.8 | 2.1 | 0.9 | 3.2 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 39.4 | 9.1 | 30.3 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
25.5 | 3.2 | 1.9 | 0.8 | 2.7 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.6 | 33.8 | 8.3 | 25.5 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
21.6 | 2.8 | 1.6 | 0.7 | 2.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 28.7 | 6.3 | 22.5 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
18.2 | 2.3 | 1.4 | 0.6 | 2.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 24.2 | 5.3 | 18.9 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
15.2 | 2.0 | 1.2 | 0.5 | 1.7 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 20.3 | 4.7 | 15.5 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
12.5 | 1.6 | 1.1 | 0.4 | 1.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 16.8 | 3.7 | 13.1 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
10.3 | 1.4 | 0.9 | 0.3 | 1.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 13.9 | 2.6 | 11.3 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
8.3 | 1.1 | 0.8 | 0.3 | 0.9 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.3 | 1.6 | 9.7 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
6.7 | 0.9 | 0.6 | 0.2 | 0.8 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.2 | 1.3 | 7.8 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
5.3 | 0.8 | 0.5 | 0.2 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.4 | 1.0 | 6.3 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
4.2 | 0.6 | 0.4 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 5.9 | 0.8 | 5.0 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
3.3 | 0.5 | 0.4 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.6 | 0.7 | 4.0 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
2.6 | 0.4 | 0.3 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.6 | 0.5 | 3.1 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
2.0 | 0.3 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 2.8 | 0.4 | 2.4 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
1.5 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.2 | 0.3 | 1.9 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
1.1 | 0.2 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.7 | 0.2 | 1.4 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.9 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.3 | 0.2 | 1.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.7 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.0 | 0.1 | 0.8 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.4 | 0.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.6 | 0.1 | 0.5 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
2,745.2 | 405.7 | 146.4 | 98.6 | 297.3 | 20.3 | 4.4 | 10.4 | 1.3 | 9.2 | 66.7 | 3,672.3 | 503.5 | 3,168.9 | ||||||||||||||||||||||||||||||||||||||||||
Page 168
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
23.3 | 6.3 | 1.6 | 1.6 | 3.8 | 0.4 | 0.0 | 0.3 | 0.0 | 0.6 | 0.6 | 37.4 | 4.3 | 33.1 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
59.2 | 9.7 | 2.5 | 2.3 | 4.9 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.4 | 78.8 | 11.4 | 67.4 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
72.0 | 12.9 | 3.3 | 3.1 | 6.2 | 0.6 | 0.1 | 0.5 | 0.1 | 0.6 | 1.8 | 97.6 | 13.5 | 84.2 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
73.6 | 13.4 | 3.5 | 3.3 | 7.0 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 1.8 | 101.0 | 13.9 | 87.0 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
79.0 | 13.8 | 3.6 | 3.4 | 7.9 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 2.0 | 107.7 | 14.4 | 93.3 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
84.6 | 14.3 | 3.9 | 3.5 | 8.7 | 0.7 | 0.1 | 0.5 | 0.1 | 0.6 | 2.1 | 114.8 | 15.4 | 99.4 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
90.0 | 14.9 | 4.1 | 3.6 | 9.5 | 0.7 | 0.1 | 0.5 | 0.1 | 0.5 | 2.2 | 122.0 | 15.7 | 106.3 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
95.6 | 15.4 | 4.4 | 3.7 | 10.3 | 0.8 | 0.1 | 0.5 | 0.1 | 0.5 | 2.3 | 129.1 | 16.2 | 112.9 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
100.1 | 15.9 | 4.6 | 3.9 | 10.5 | 0.8 | 0.2 | 0.5 | 0.1 | 0.5 | 2.4 | 134.5 | 17.1 | 117.4 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
104.3 | 16.2 | 4.8 | 3.9 | 10.8 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.5 | 139.5 | 15.0 | 124.5 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
107.4 | 16.5 | 5.0 | 4.0 | 11.1 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.6 | 143.3 | 16.0 | 127.3 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
109.6 | 16.6 | 5.2 | 4.0 | 11.4 | 0.8 | 0.2 | 0.5 | 0.1 | 0.4 | 2.7 | 146.0 | 16.8 | 129.2 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
111.1 | 16.6 | 5.3 | 4.0 | 11.5 | 0.8 | 0.2 | 0.4 | 0.1 | 0.4 | 2.7 | 147.8 | 17.6 | 130.2 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
111.7 | 16.6 | 5.4 | 4.0 | 11.6 | 0.8 | 0.2 | 0.4 | 0.1 | 0.3 | 2.7 | 148.3 | 18.1 | 130.2 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
111.4 | 16.3 | 5.5 | 4.0 | 11.5 | 0.8 | 0.2 | 0.4 | 0.0 | 0.3 | 2.7 | 147.7 | 18.0 | 129.6 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
110.2 | 15.9 | 5.5 | 3.9 | 11.3 | 0.8 | 0.2 | 0.4 | 0.0 | 0.3 | 2.7 | 145.8 | 16.0 | 129.8 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
108.2 | 15.5 | 5.5 | 3.8 | 11.0 | 0.8 | 0.2 | 0.3 | 0.0 | 0.2 | 2.6 | 142.8 | 16.2 | 126.6 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
105.3 | 14.9 | 5.5 | 3.6 | 10.6 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.5 | 138.8 | 16.4 | 122.3 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
101.7 | 14.1 | 5.3 | 3.4 | 10.2 | 0.7 | 0.2 | 0.3 | 0.0 | 0.2 | 2.4 | 133.6 | 16.4 | 117.2 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
97.4 | 13.3 | 5.2 | 3.2 | 9.7 | 0.7 | 0.1 | 0.3 | 0.0 | 0.2 | 2.3 | 127.7 | 16.2 | 111.5 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
92.5 | 12.5 | 5.0 | 3.0 | 9.2 | 0.6 | 0.1 | 0.2 | 0.0 | 0.1 | 2.2 | 121.1 | 15.9 | 105.1 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
87.1 | 11.6 | 4.8 | 2.8 | 8.6 | 0.6 | 0.1 | 0.2 | 0.0 | 0.1 | 2.1 | 113.8 | 15.6 | 98.3 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
81.3 | 10.7 | 4.6 | 2.6 | 8.0 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 1.9 | 106.2 | 15.1 | 91.1 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
75.2 | 9.8 | 4.3 | 2.4 | 7.4 | 0.5 | 0.1 | 0.2 | 0.0 | 0.1 | 1.8 | 98.1 | 14.5 | 83.6 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
69.0 | 8.9 | 4.0 | 2.2 | 6.7 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.7 | 89.9 | 14.0 | 76.0 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
62.7 | 8.0 | 3.8 | 1.9 | 6.1 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.5 | 81.7 | 13.4 | 68.3 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
56.5 | 7.2 | 3.5 | 1.7 | 5.5 | 0.4 | 0.1 | 0.1 | 0.0 | 0.1 | 1.4 | 73.7 | 12.7 | 61.0 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
50.5 | 6.4 | 3.2 | 1.6 | 4.9 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.2 | 65.9 | 12.0 | 53.9 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
44.7 | 5.6 | 2.9 | 1.4 | 4.4 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 1.1 | 58.4 | 11.3 | 47.1 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
39.3 | 4.9 | 2.6 | 1.2 | 3.9 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.9 | 51.3 | 10.5 | 40.8 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
34.2 | 4.3 | 2.3 | 1.0 | 3.4 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.8 | 44.8 | 9.7 | 35.0 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
29.5 | 3.7 | 2.1 | 0.9 | 2.9 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 38.7 | 9.0 | 29.8 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
25.2 | 3.2 | 1.8 | 0.8 | 2.5 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.6 | 33.2 | 8.2 | 25.0 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
21.4 | 2.7 | 1.6 | 0.7 | 2.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 28.3 | 6.6 | 21.7 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
18.0 | 2.3 | 1.4 | 0.6 | 1.8 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 23.8 | 5.2 | 18.6 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
15.0 | 1.9 | 1.2 | 0.5 | 1.5 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 19.9 | 4.7 | 15.3 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
12.4 | 1.6 | 1.0 | 0.4 | 1.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 16.6 | 4.1 | 12.5 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
10.2 | 1.3 | 0.9 | 0.3 | 1.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 13.6 | 2.6 | 11.0 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
8.2 | 1.1 | 0.8 | 0.3 | 0.9 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.1 | 1.8 | 9.3 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
6.6 | 0.9 | 0.6 | 0.2 | 0.7 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.0 | 1.3 | 7.7 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
5.3 | 0.7 | 0.5 | 0.2 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.2 | 1.0 | 6.2 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
4.2 | 0.6 | 0.4 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 5.8 | 0.8 | 5.0 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
3.3 | 0.5 | 0.4 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.6 | 0.6 | 3.9 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
2.6 | 0.4 | 0.3 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.6 | 0.5 | 3.1 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
2.0 | 0.3 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 2.8 | 0.4 | 2.4 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
1.5 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.2 | 0.3 | 1.9 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
1.1 | 0.2 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.7 | 0.2 | 1.4 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.9 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.3 | 0.2 | 1.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.6 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.0 | 0.1 | 0.8 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.4 | 0.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 0.1 | 0.5 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
2,718.4 | 401.5 | 144.9 | 97.6 | 274.9 | 20.1 | 4.1 | 10.3 | 1.2 | 9.2 | 66.0 | 3,616.3 | 497.4 | 3,118.9 | ||||||||||||||||||||||||||||||||||||||||||
Page 169
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
23.2 | 6.2 | 1.6 | 1.6 | 3.8 | 0.4 | 0.0 | 0.3 | 0.0 | 0.6 | 0.6 | 37.1 | 4.2 | 32.9 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
57.0 | 9.3 | 2.4 | 2.2 | 4.9 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.4 | 75.9 | 10.9 | 65.0 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
65.7 | 11.7 | 3.0 | 2.8 | 6.1 | 0.6 | 0.1 | 0.5 | 0.1 | 0.5 | 1.6 | 89.4 | 12.3 | 77.2 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
63.6 | 11.6 | 3.0 | 2.8 | 6.7 | 0.6 | 0.1 | 0.5 | 0.1 | 0.5 | 1.6 | 87.8 | 12.0 | 75.8 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
64.6 | 11.3 | 3.0 | 2.8 | 7.3 | 0.6 | 0.1 | 0.4 | 0.1 | 0.5 | 1.6 | 89.0 | 11.8 | 77.2 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
65.6 | 11.1 | 3.0 | 2.7 | 7.7 | 0.6 | 0.1 | 0.4 | 0.1 | 0.4 | 1.6 | 90.1 | 12.0 | 78.1 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
66.3 | 11.0 | 3.0 | 2.7 | 8.2 | 0.6 | 0.1 | 0.4 | 0.0 | 0.4 | 1.6 | 91.0 | 11.6 | 79.4 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
66.8 | 10.8 | 3.0 | 2.6 | 8.5 | 0.5 | 0.1 | 0.4 | 0.0 | 0.3 | 1.6 | 91.5 | 11.4 | 80.1 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
66.4 | 10.6 | 3.0 | 2.6 | 8.2 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 90.5 | 11.4 | 79.1 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
65.6 | 10.2 | 3.0 | 2.5 | 8.1 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 89.0 | 9.5 | 79.5 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
64.1 | 9.9 | 3.0 | 2.4 | 7.8 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.6 | 86.8 | 9.7 | 77.2 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
62.1 | 9.4 | 2.9 | 2.3 | 7.6 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.5 | 84.0 | 9.7 | 74.3 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
59.8 | 9.0 | 2.9 | 2.2 | 7.4 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.4 | 80.7 | 9.6 | 71.1 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
57.0 | 8.5 | 2.8 | 2.1 | 7.0 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.4 | 76.9 | 9.4 | 67.5 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
54.0 | 7.9 | 2.7 | 1.9 | 6.6 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.3 | 72.6 | 8.7 | 63.9 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
50.7 | 7.4 | 2.6 | 1.8 | 6.2 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.2 | 68.1 | 7.5 | 60.6 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
47.2 | 6.8 | 2.4 | 1.6 | 5.7 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.1 | 63.3 | 7.2 | 56.1 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
43.6 | 6.2 | 2.3 | 1.5 | 5.2 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.1 | 58.4 | 6.9 | 51.4 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
40.0 | 5.6 | 2.1 | 1.3 | 4.8 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.0 | 53.3 | 6.5 | 46.8 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
36.3 | 5.0 | 1.9 | 1.2 | 4.3 | 0.2 | 0.1 | 0.1 | 0.0 | 0.1 | 0.9 | 48.4 | 6.1 | 42.2 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
32.7 | 4.4 | 1.8 | 1.1 | 3.9 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.8 | 43.5 | 5.7 | 37.8 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
29.2 | 3.9 | 1.6 | 0.9 | 3.4 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.7 | 38.8 | 5.3 | 33.5 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
25.9 | 3.4 | 1.5 | 0.8 | 3.0 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.6 | 34.4 | 4.9 | 29.5 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
22.8 | 3.0 | 1.3 | 0.7 | 2.7 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 30.1 | 4.4 | 25.7 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
19.8 | 2.6 | 1.2 | 0.6 | 2.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 26.2 | 4.1 | 22.1 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
17.1 | 2.2 | 1.0 | 0.5 | 2.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 22.6 | 3.7 | 18.9 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
14.6 | 1.9 | 0.9 | 0.5 | 1.7 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 19.3 | 3.3 | 16.0 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
12.4 | 1.6 | 0.8 | 0.4 | 1.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 16.4 | 3.0 | 13.4 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
10.4 | 1.3 | 0.7 | 0.3 | 1.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 13.8 | 2.7 | 11.1 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
8.7 | 1.1 | 0.6 | 0.3 | 1.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.5 | 2.4 | 9.2 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
7.2 | 0.9 | 0.5 | 0.2 | 0.8 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.5 | 2.1 | 7.5 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
5.9 | 0.7 | 0.4 | 0.2 | 0.7 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.8 | 1.8 | 6.0 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
4.8 | 0.6 | 0.3 | 0.1 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 6.4 | 1.5 | 4.8 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
3.8 | 0.5 | 0.3 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 5.1 | 1.1 | 4.1 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
3.1 | 0.4 | 0.2 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.1 | 0.9 | 3.2 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
2.4 | 0.3 | 0.2 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.3 | 0.8 | 2.5 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
1.9 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.6 | 0.5 | 2.1 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
1.5 | 0.2 | 0.1 | 0.0 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.0 | 0.3 | 1.7 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
1.1 | 0.2 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.6 | 0.2 | 1.3 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
0.9 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.2 | 0.2 | 1.0 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
0.7 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.9 | 0.1 | 0.8 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
0.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
1,348.3 | 209.1 | 67.6 | 50.9 | 159.0 | 10.5 | 2.3 | 6.2 | 0.8 | 6.1 | 32.9 | 1,827.9 | 237.9 | 1,590.0 | ||||||||||||||||||||||||||||||||||||||||||
Page 170
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
23.0 | 6.2 | 1.6 | 1.6 | 3.8 | 0.4 | 0.0 | 0.3 | 0.0 | 0.6 | 0.6 | 37.0 | 4.2 | 32.8 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
56.3 | 9.2 | 2.4 | 2.2 | 4.7 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.4 | 75.0 | 10.8 | 64.2 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
64.8 | 11.6 | 3.0 | 2.8 | 5.7 | 0.6 | 0.1 | 0.5 | 0.0 | 0.5 | 1.6 | 88.0 | 12.1 | 75.9 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
62.7 | 11.4 | 2.9 | 2.8 | 6.3 | 0.6 | 0.1 | 0.5 | 0.0 | 0.5 | 1.6 | 86.2 | 11.9 | 74.4 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
63.7 | 11.2 | 2.9 | 2.7 | 6.7 | 0.6 | 0.1 | 0.4 | 0.0 | 0.5 | 1.6 | 87.2 | 11.6 | 75.6 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
64.7 | 10.9 | 2.9 | 2.7 | 7.0 | 0.6 | 0.1 | 0.4 | 0.0 | 0.4 | 1.6 | 88.2 | 11.8 | 76.4 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
65.3 | 10.8 | 3.0 | 2.6 | 7.4 | 0.5 | 0.1 | 0.4 | 0.0 | 0.4 | 1.6 | 89.0 | 11.4 | 77.6 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
65.8 | 10.6 | 3.0 | 2.6 | 7.6 | 0.5 | 0.1 | 0.4 | 0.0 | 0.3 | 1.6 | 89.4 | 11.2 | 78.2 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
65.4 | 10.4 | 3.0 | 2.5 | 7.4 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 88.4 | 11.2 | 77.2 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
64.6 | 10.1 | 3.0 | 2.4 | 7.2 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 87.0 | 9.3 | 77.7 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
63.2 | 9.7 | 2.9 | 2.4 | 7.0 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.5 | 84.8 | 9.5 | 75.4 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
61.2 | 9.3 | 2.9 | 2.3 | 6.8 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.5 | 82.0 | 9.5 | 72.6 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
58.9 | 8.8 | 2.8 | 2.1 | 6.6 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.4 | 78.8 | 9.4 | 69.4 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
56.2 | 8.3 | 2.7 | 2.0 | 6.3 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.4 | 75.1 | 9.2 | 65.9 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
53.2 | 7.8 | 2.6 | 1.9 | 5.9 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.3 | 70.9 | 8.6 | 62.3 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
49.9 | 7.2 | 2.5 | 1.8 | 5.5 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.2 | 66.5 | 7.3 | 59.2 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
46.5 | 6.7 | 2.4 | 1.6 | 5.1 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.1 | 61.8 | 7.0 | 54.8 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
43.0 | 6.1 | 2.2 | 1.5 | 4.7 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.0 | 57.0 | 6.8 | 50.2 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
39.4 | 5.5 | 2.1 | 1.3 | 4.3 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 0.9 | 52.1 | 6.4 | 45.7 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
35.8 | 4.9 | 1.9 | 1.2 | 3.8 | 0.2 | 0.1 | 0.1 | 0.0 | 0.1 | 0.9 | 47.2 | 6.0 | 41.2 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
32.2 | 4.3 | 1.8 | 1.1 | 3.4 | 0.2 | 0.1 | 0.1 | 0.0 | 0.0 | 0.8 | 42.5 | 5.6 | 36.9 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
28.8 | 3.8 | 1.6 | 0.9 | 3.1 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.7 | 37.9 | 5.2 | 32.7 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
25.5 | 3.4 | 1.4 | 0.8 | 2.7 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.6 | 33.6 | 4.8 | 28.8 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
22.4 | 2.9 | 1.3 | 0.7 | 2.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 29.4 | 4.3 | 25.1 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
19.5 | 2.5 | 1.1 | 0.6 | 2.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 25.6 | 4.0 | 21.6 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
16.8 | 2.2 | 1.0 | 0.5 | 1.8 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 22.1 | 3.6 | 18.5 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
14.4 | 1.8 | 0.9 | 0.4 | 1.5 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 18.9 | 3.3 | 15.6 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
12.2 | 1.5 | 0.8 | 0.4 | 1.3 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 16.0 | 2.9 | 13.1 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
10.3 | 1.3 | 0.7 | 0.3 | 1.1 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 13.5 | 2.6 | 10.9 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
8.6 | 1.1 | 0.6 | 0.3 | 0.9 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.3 | 2.3 | 8.9 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
7.1 | 0.9 | 0.5 | 0.2 | 0.8 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.3 | 2.0 | 7.3 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
5.8 | 0.7 | 0.4 | 0.2 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.6 | 1.8 | 5.9 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
4.7 | 0.6 | 0.3 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 6.2 | 1.5 | 4.7 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
3.8 | 0.5 | 0.3 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 5.0 | 1.1 | 3.9 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
3.0 | 0.4 | 0.2 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.0 | 0.9 | 3.1 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
2.4 | 0.3 | 0.2 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.2 | 0.7 | 2.4 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
1.9 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.5 | 0.6 | 2.0 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
1.5 | 0.2 | 0.1 | 0.0 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.0 | 0.4 | 1.6 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
1.1 | 0.2 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.5 | 0.2 | 1.3 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
0.9 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.2 | 0.2 | 1.0 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
0.6 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.9 | 0.1 | 0.8 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
0.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
1,328.9 | 206.1 | 66.6 | 50.1 | 143.6 | 10.4 | 2.1 | 6.1 | 0.8 | 6.1 | 32.4 | 1,788.3 | 233.5 | 1,554.8 | ||||||||||||||||||||||||||||||||||||||||||
Page 171
Workers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Workers | Compensation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
ARPD & | Defendant | Compensation | Legal | Wharf | Wharf Legal | Cross Claim | ||||||||||||||||||||||||||||||||||||||||||||||||||
Payment Year | Mesothelioma | Asbestosis | Lung Cancer | Other | Legal Costs | Claims | Costs | Claims | Costs | Baryulgil | Recoveries | Gross | Insurance | Net | ||||||||||||||||||||||||||||||||||||||||||
2006 / 2007 |
22.9 | 6.2 | 1.6 | 1.6 | 3.8 | 0.4 | 0.0 | 0.3 | 0.0 | 0.6 | 0.6 | 36.9 | 4.2 | 32.7 | ||||||||||||||||||||||||||||||||||||||||||
2007 / 2008 |
55.9 | 9.2 | 2.4 | 2.2 | 4.6 | 0.5 | 0.1 | 0.4 | 0.0 | 0.6 | 1.4 | 74.3 | 10.7 | 63.6 | ||||||||||||||||||||||||||||||||||||||||||
2008 / 2009 |
64.2 | 11.5 | 2.9 | 2.8 | 5.5 | 0.6 | 0.1 | 0.5 | 0.0 | 0.5 | 1.6 | 87.0 | 12.0 | 75.0 | ||||||||||||||||||||||||||||||||||||||||||
2009 / 2010 |
62.1 | 11.3 | 2.9 | 2.8 | 5.9 | 0.6 | 0.1 | 0.5 | 0.0 | 0.5 | 1.6 | 85.1 | 11.7 | 73.4 | ||||||||||||||||||||||||||||||||||||||||||
2010 / 2011 |
63.1 | 11.1 | 2.9 | 2.7 | 6.3 | 0.6 | 0.1 | 0.4 | 0.0 | 0.5 | 1.6 | 86.0 | 11.5 | 74.5 | ||||||||||||||||||||||||||||||||||||||||||
2011 / 2012 |
64.1 | 10.8 | 2.9 | 2.6 | 6.6 | 0.5 | 0.1 | 0.4 | 0.0 | 0.4 | 1.6 | 86.9 | 11.6 | 75.3 | ||||||||||||||||||||||||||||||||||||||||||
2012 / 2013 |
64.7 | 10.7 | 2.9 | 2.6 | 6.9 | 0.5 | 0.1 | 0.4 | 0.0 | 0.4 | 1.6 | 87.6 | 11.3 | 76.3 | ||||||||||||||||||||||||||||||||||||||||||
2013 / 2014 |
65.1 | 10.5 | 3.0 | 2.6 | 7.1 | 0.5 | 0.1 | 0.4 | 0.0 | 0.3 | 1.6 | 88.0 | 11.0 | 77.0 | ||||||||||||||||||||||||||||||||||||||||||
2014 / 2015 |
64.8 | 10.3 | 3.0 | 2.5 | 6.8 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 87.0 | 11.1 | 76.0 | ||||||||||||||||||||||||||||||||||||||||||
2015 / 2016 |
64.0 | 10.0 | 2.9 | 2.4 | 6.6 | 0.5 | 0.1 | 0.3 | 0.0 | 0.3 | 1.6 | 85.6 | 9.2 | 76.4 | ||||||||||||||||||||||||||||||||||||||||||
2016 / 2017 |
62.6 | 9.6 | 2.9 | 2.3 | 6.5 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.5 | 83.5 | 9.3 | 74.2 | ||||||||||||||||||||||||||||||||||||||||||
2017 / 2018 |
60.6 | 9.2 | 2.9 | 2.2 | 6.3 | 0.5 | 0.1 | 0.3 | 0.0 | 0.2 | 1.5 | 80.7 | 9.3 | 71.4 | ||||||||||||||||||||||||||||||||||||||||||
2018 / 2019 |
58.3 | 8.7 | 2.8 | 2.1 | 6.1 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.4 | 77.6 | 9.2 | 68.3 | ||||||||||||||||||||||||||||||||||||||||||
2019 / 2020 |
55.6 | 8.2 | 2.7 | 2.0 | 5.8 | 0.4 | 0.1 | 0.2 | 0.0 | 0.2 | 1.3 | 73.9 | 9.0 | 64.8 | ||||||||||||||||||||||||||||||||||||||||||
2020 / 2021 |
52.7 | 7.7 | 2.6 | 1.9 | 5.4 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.3 | 69.8 | 8.5 | 61.3 | ||||||||||||||||||||||||||||||||||||||||||
2021 / 2022 |
49.4 | 7.2 | 2.5 | 1.7 | 5.1 | 0.4 | 0.1 | 0.2 | 0.0 | 0.1 | 1.2 | 65.4 | 7.2 | 58.2 | ||||||||||||||||||||||||||||||||||||||||||
2022 / 2023 |
46.1 | 6.6 | 2.4 | 1.6 | 4.7 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.1 | 60.8 | 6.9 | 53.9 | ||||||||||||||||||||||||||||||||||||||||||
2023 / 2024 |
42.5 | 6.0 | 2.2 | 1.5 | 4.3 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 1.0 | 56.1 | 6.6 | 49.4 | ||||||||||||||||||||||||||||||||||||||||||
2024 / 2025 |
39.0 | 5.4 | 2.1 | 1.3 | 3.9 | 0.3 | 0.1 | 0.1 | 0.0 | 0.1 | 0.9 | 51.2 | 6.3 | 44.9 | ||||||||||||||||||||||||||||||||||||||||||
2025 / 2026 |
35.4 | 4.8 | 1.9 | 1.2 | 3.5 | 0.2 | 0.1 | 0.1 | 0.0 | 0.1 | 0.9 | 46.5 | 5.9 | 40.6 | ||||||||||||||||||||||||||||||||||||||||||
2026 / 2027 |
31.9 | 4.3 | 1.7 | 1.0 | 3.2 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.8 | 41.8 | 5.5 | 36.3 | ||||||||||||||||||||||||||||||||||||||||||
2027 / 2028 |
28.5 | 3.8 | 1.6 | 0.9 | 2.8 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.7 | 37.3 | 5.1 | 32.2 | ||||||||||||||||||||||||||||||||||||||||||
2028 / 2029 |
25.3 | 3.3 | 1.4 | 0.8 | 2.5 | 0.2 | 0.0 | 0.1 | 0.0 | 0.0 | 0.6 | 33.0 | 4.7 | 28.3 | ||||||||||||||||||||||||||||||||||||||||||
2029 / 2030 |
22.2 | 2.9 | 1.3 | 0.7 | 2.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 29.0 | 4.3 | 24.7 | ||||||||||||||||||||||||||||||||||||||||||
2030 / 2031 |
19.3 | 2.5 | 1.1 | 0.6 | 1.9 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 25.2 | 3.9 | 21.3 | ||||||||||||||||||||||||||||||||||||||||||
2031 / 2032 |
16.7 | 2.1 | 1.0 | 0.5 | 1.6 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 21.7 | 3.6 | 18.2 | ||||||||||||||||||||||||||||||||||||||||||
2032 / 2033 |
14.3 | 1.8 | 0.9 | 0.4 | 1.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 18.6 | 3.2 | 15.4 | ||||||||||||||||||||||||||||||||||||||||||
2033 / 2034 |
12.1 | 1.5 | 0.8 | 0.4 | 1.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 15.8 | 2.9 | 12.9 | ||||||||||||||||||||||||||||||||||||||||||
2034 / 2035 |
10.2 | 1.3 | 0.7 | 0.3 | 1.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 13.3 | 2.6 | 10.7 | ||||||||||||||||||||||||||||||||||||||||||
2035 / 2036 |
8.5 | 1.1 | 0.6 | 0.3 | 0.8 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 11.1 | 2.3 | 8.8 | ||||||||||||||||||||||||||||||||||||||||||
2036 / 2037 |
7.0 | 0.9 | 0.5 | 0.2 | 0.7 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 9.2 | 2.0 | 7.2 | ||||||||||||||||||||||||||||||||||||||||||
2037 / 2038 |
5.7 | 0.7 | 0.4 | 0.2 | 0.6 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 7.5 | 1.7 | 5.8 | ||||||||||||||||||||||||||||||||||||||||||
2038 / 2039 |
4.7 | 0.6 | 0.3 | 0.1 | 0.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 6.1 | 1.5 | 4.6 | ||||||||||||||||||||||||||||||||||||||||||
2039 / 2040 |
3.7 | 0.5 | 0.3 | 0.1 | 0.4 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.9 | 1.2 | 3.8 | ||||||||||||||||||||||||||||||||||||||||||
2040 / 2041 |
3.0 | 0.4 | 0.2 | 0.1 | 0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 4.0 | 0.9 | 3.1 | ||||||||||||||||||||||||||||||||||||||||||
2041 / 2042 |
2.4 | 0.3 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 3.1 | 0.7 | 2.4 | ||||||||||||||||||||||||||||||||||||||||||
2042 / 2043 |
1.9 | 0.2 | 0.2 | 0.1 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.5 | 0.6 | 1.9 | ||||||||||||||||||||||||||||||||||||||||||
2043 / 2044 |
1.4 | 0.2 | 0.1 | 0.0 | 0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.9 | 0.4 | 1.6 | ||||||||||||||||||||||||||||||||||||||||||
2044 / 2045 |
1.1 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.5 | 0.2 | 1.3 | ||||||||||||||||||||||||||||||||||||||||||
2045 / 2046 |
0.8 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.2 | 0.2 | 1.0 | ||||||||||||||||||||||||||||||||||||||||||
2046 / 2047 |
0.6 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.9 | 0.1 | 0.8 | ||||||||||||||||||||||||||||||||||||||||||
2047 / 2048 |
0.5 | 0.1 | 0.1 | 0.0 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.7 | 0.1 | 0.6 | ||||||||||||||||||||||||||||||||||||||||||
2048 / 2049 |
0.4 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.5 | 0.1 | 0.4 | ||||||||||||||||||||||||||||||||||||||||||
2049 / 2050 |
0.3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.4 | 0.1 | 0.3 | ||||||||||||||||||||||||||||||||||||||||||
2050 / 2051 |
0.2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.3 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2051 / 2052 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.2 | 0.0 | 0.2 | ||||||||||||||||||||||||||||||||||||||||||
2052 / 2053 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2053 / 2054 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2054 / 2055 |
0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.1 | ||||||||||||||||||||||||||||||||||||||||||
2055 / 2056 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.1 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2056 / 2057 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2057 / 2058 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2058 / 2059 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2059 / 2060 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2060 / 2061 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2061 / 2062 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2062 / 2063 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2063 / 2064 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2064 / 2065 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2065 / 2066 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2066 / 2067 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2067 / 2068 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2068 / 2069 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2069 / 2070 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2070 / 2071 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2071 / 2072 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
2072 / 2073 |
0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||||||||||||||||||||||||||||||||||||||||||
TOTAL |
1,316.1 | 204.0 | 65.9 | 49.6 | 133.4 | 10.3 | 2.0 | 6.1 | 0.7 | 6.1 | 32.1 | 1,762.0 | 230.5 | 1,531.5 | ||||||||||||||||||||||||||||||||||||||||||
Page 172
Pre cost savings | Post cost savings in NSW only | Post cost savings Australia-wide | ||||||||||||||||||||||||||||||||||
$m | $m | $m | ||||||||||||||||||||||||||||||||||
Gross of | Net of | Gross of | Net of | Gross of | Net of | |||||||||||||||||||||||||||||||
insurance | Insurance | insurance | insurance | Insurance | insurance | insurance | Insurance | insurance | ||||||||||||||||||||||||||||
Total projected
cashflows in current
dollars (uninflated and
undiscounted) |
1,718.7 | 239.7 | 1,479.0 | 1,676.8 | 234.5 | 1,442.3 | 1,649.0 | 231.0 | 1,417.9 | |||||||||||||||||||||||||||
Future inflation
allowance (base and
superimposed inflation) |
2,038.2 | 273.3 | 1,764.9 | 1,995.6 | 269.0 | 1,726.6 | 1,967.3 | 266.3 | 1,701.0 | |||||||||||||||||||||||||||
Total projected cash-flows with inflation
allowance |
3,756.9 | 512.9 | 3,244.0 | 3,672.3 | 503.5 | 3,168.9 | 3,616.3 | 497.4 | 3,118.9 | |||||||||||||||||||||||||||
Discounting allowance |
(1,929.0 | ) | (275.0 | ) | (1,654.0 | ) | (1,884.0 | ) | (270.0 | ) | (1,614.0 | ) | (1,854.2 | ) | (266.9 | ) | (1,587.4 | ) | ||||||||||||||||||
Net present value
liabilities |
1,827.9 | 237.9 | 1,590.0 | 1,788.3 | 233.5 | 1,554.8 | 1,762.0 | 230.5 | 1,531.5 |
Page 173
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation | valuation | valuation | ||||||||||
Mesothelioma |
6,510 | 6,518 | 6,528 | |||||||||
Asbestosis |
2,791 | 2,217 | 2,214 | |||||||||
Lung Cancer |
893 | 904 | 893 | |||||||||
ARPD & Other |
915 | 835 | 849 | |||||||||
Wharf |
186 | 180 | 168 | |||||||||
Workers Compensation |
1,772 | 1,859 | 2,075 |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||||||||||||||
2006 valuation | valuation | valuation | ||||||||||||||||||||||
Std | Std | |||||||||||||||||||||||
Mean | Dev | Mean | Dev | Mean | Std Dev | |||||||||||||||||||
(years) | (years) | (years) | (years) | (years) | (years) | |||||||||||||||||||
Mesothelioma |
35 | 10 | 35 | 10 | 35 | 10 | ||||||||||||||||||
Asbestosis |
30 | 10 | 30 | 10 | 30 | 10 | ||||||||||||||||||
Lung Cancer |
35 | 10 | 35 | 10 | 35 | 10 | ||||||||||||||||||
ARPD & Other |
30 | 11 | 30 | 11 | 30 | 11 | ||||||||||||||||||
Wharf |
n/a | n/a | n/a | n/a | n/a | n/a | ||||||||||||||||||
Workers Compensation |
n/a | n/a | n/a | n/a | n/a | n/a |
Page 174
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation | valuation | valuation | ||||||||||
Mesothelioma |
2010/11 | 2010/11 | 2010/11 | |||||||||
Asbestosis |
2006/07 | 2005/06 | 2005/06 | |||||||||
Lung Cancer |
2010/11 | 2010/11 | 2010/11 | |||||||||
ARPD & Other |
2006/07 | 2006/07 | 2006/07 | |||||||||
Wharf |
2000/01 | 2000/01 | 2000/01 | |||||||||
Workers
Compensation |
2006/07 | 2006/07 | 2006/07 |
Notes for F.4 to F.7: | ||
1 | Average costs at 30 September 2006 valuation are in mid 2006/07 money terms |
|
2 | Average costs at 31 March 2006 valuation are in mid 2005/06 money terms | |
3 | Average costs at 30 June 2005 valuation are in mid 2005/06 money terms |
Page 175
F.4 | Projected average Liable Entities share of claim award costs of non-nil settlements (pre cost savings) |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation 1 | valuation 2 | valuation 3 | ||||||||||
Mesothelioma |
260,000 | 260,000 | 265,000 | |||||||||
Asbestosis |
97,500 | 100,000 | 100,000 | |||||||||
Lung Cancer |
125,000 | 135,000 | 140,000 | |||||||||
ARPD & Other |
90,000 | 90,000 | 90,000 | |||||||||
Wharf |
100,000 | 90,000 | 90,000 | |||||||||
Workers Compensation |
135,000 | 135,000 | 135,000 | |||||||||
F.5 Projected average Liable Entities defendant costs of nil settlements (pre cost savings) | ||||||||||||
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation 1 | valuation 2 | valuation 3 | ||||||||||
Mesothelioma |
17,500 | 20,000 | 22,500 | |||||||||
Asbestosis |
15,000 | 15,000 | 3,500 | |||||||||
Lung Cancer |
7,500 | 7,500 | 7,500 | |||||||||
ARPD & Other |
10,000 | 15,000 | 15,000 | |||||||||
Wharf |
2,500 | 1,500 | 1,500 | |||||||||
Workers
Compensation |
2,500 | 7,500 | 7,500 |
Page 176
F.6 | Projected average Liable Entities share of defendant claims legal costs of non-nil settlements (pre cost savings) |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation 1 | valuation 2 | valuation 3 | ||||||||||
Mesothelioma |
25,000 | 30,000 | 35,000 | |||||||||
Asbestosis |
25,000 | 25,000 | 25,000 | |||||||||
Lung Cancer |
20,000 | 12,500 | 12,500 | |||||||||
ARPD & Other |
25,000 | 30,000 | 35,000 | |||||||||
Wharf |
15,000 | 15,000 | 15,000 | |||||||||
Workers
Compensation |
15,000 | 15,000 | 25,000 |
Page 177
F.7 | Large claims loading (for claims in excess of $1m in 2005/06 money terms) |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation 1 | valuation 2 | valuation 3 | ||||||||||
Mesothelioma
|
$1,650,000 average claim 1.6% incidence rate $26,400 per claim | $1,500,000 average claim 1.5% incidence rate $22,500 per claim | $1,500,000 average claim 1.5% incidence rate $22,500 per claim | |||||||||
Asbestosis
|
Nil | Nil | Nil | |||||||||
Lung Cancer
|
Nil | Nil | Nil | |||||||||
ARPD & Other
|
Nil | Nil | Nil | |||||||||
Wharf
|
Nil | Nil | Nil | |||||||||
Workers Compensation
|
Nil | Nil | Nil | |||||||||
F.8 Nil claim settlement rate
|
||||||||||||
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation | valuation | valuation | ||||||||||
Mesothelioma |
12 | % | 11.5 | % | 14 | % | ||||||
Asbestosis |
9.5 | % | 9.5 | % | 10 | % | ||||||
Lung Cancer |
30 | % | 30 | % | 32 | % | ||||||
ARPD & Other |
20 | % | 20 | % | 20 | % | ||||||
Wharf |
25 | % | 35 | % | 35 | % | ||||||
Workers
Compensation |
92 | % | 90 | % | 90 | % |
Page 178
F.9 | Cross-claim recoveries and Other Recoveries rate |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation | valuation | valuation | ||||||||||
Cross-claim recoveries
rate |
2.00 | % | 2.00 | % | 1.40 | % | ||||||
Other Recoveries rate |
0.00 | % | 0.00 | % | 0.00 | % | ||||||
Total recoveries rate |
2.00 | % | 2.00 | % | 1.40 | % |
F.10 | Margin in case estimates |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
2006 valuation | valuation | valuation | ||||||||||
Assumed
surplus as a % of case estimates |
15.0% of the |
0.0 | % | 0.0 | % | |||||||
award amount |
30 September | 31 March 2006 | 30 June 2005 | ||||
2006 valuation | valuation | valuation | ||||
Base inflation
|
4.25% per annum | 4.25% per annum | 4.00% per annum | |||
Superimposed inflation
|
2.25% per annum | 2.00% per annum | 2.00% per annum | |||
Total claim inflation
|
6.60% per annum | 6.34% per annum | 6.08% per annum |
Page 179
F.12 | Discount rate by year |
30 September | 31 March 2006 | 30 June 2005 | ||||||||||
Year | 2006 valuation | valuation | valuation | |||||||||
1 |
6.02 | % | 5.44 | % | 5.33 | % | ||||||
2 |
5.84 | % | 5.41 | % | 5.08 | % | ||||||
3 |
5.69 | % | 5.44 | % | 5.09 | % | ||||||
4 |
5.57 | % | 5.46 | % | 5.11 | % | ||||||
5 |
5.48 | % | 5.49 | % | 5.14 | % | ||||||
6 |
5.42 | % | 5.51 | % | 5.17 | % | ||||||
7 |
5.38 | % | 5.54 | % | 5.20 | % | ||||||
8 |
5.37 | % | 5.56 | % | 5.23 | % | ||||||
9+ |
5.37 | % | 5.57 | % | 5.25 | % |
Page 180
Page 181
| Projection of future claim payments by year of notification using triangulation techniques as described in Section 5.5 and compare with the case reserves for those claims; and |
| Projection of future average cost per claim for reported, but not finalised claims, by year of notification. The average cost is assessed by reference to the delay from when the claim was reported to when the claim settles (this method is known as the PPCF method). |
Selected | % projected | |||||||||||
Notification Year | Case Reserve | IBNER | saving | |||||||||
2002 |
949,500 | 906,341 | 5 | % | ||||||||
2003 |
2,632,487 | 1,701,708 | 35 | % | ||||||||
2004 |
5,549,754 | 4,298,610 | 23 | % | ||||||||
2005 |
8,268,268 | 6,362,390 | 23 | % | ||||||||
2006 |
8,230,260 | 8,640,642 | -5 | % | ||||||||
Total |
27,825,308 | 22,739,486 | 18 | % |
Page 182
Selected | ||||||||||||
Notification Year | Case Reserve | IBNER | % saving | |||||||||
2002 |
2,482,075 | 1,907,708 | 23 | % | ||||||||
2003 |
1,536,020 | 3,572,069 | -133 | % | ||||||||
2004 |
6,311,604 | 4,510,218 | 29 | % | ||||||||
2005 |
8,084,342 | 5,402,408 | 33 | % | ||||||||
2006 |
5,533,604 | 3,367,799 | 39 | % | ||||||||
Total |
28,600,345 | 21,082,597 | 26 | % | ||||||||
Estimated savings on pending claims All | ||||||||||||
Selected | ||||||||||||
Notification Year | Case Reserve | IBNER | % saving | |||||||||
2002 |
3,431,575 | 2,814,049 | 18 | % | ||||||||
2003 |
4,168,507 | 5,273,777 | -27 | % | ||||||||
2004 |
11,861,358 | 8,808,828 | 26 | % | ||||||||
2005 |
16,352,610 | 11,764,798 | 28 | % | ||||||||
2006 |
13,763,864 | 12,008,441 | 13 | % | ||||||||
Total |
56,425,653 | 43,822,083 | 22 | % |
Page 183
Year | Production | Import | Export | Consumption | ||||||||||||
1920 |
0 | 0 | 0 | 0 | ||||||||||||
1921 |
1,182 | 0 | 0 | 1,182 | ||||||||||||
1922 |
742 | 0 | 0 | 742 | ||||||||||||
1923 |
217 | 0 | 0 | 217 | ||||||||||||
1924 |
78 | 0 | 0 | 78 | ||||||||||||
1925 |
51 | 0 | 0 | 51 | ||||||||||||
1926 |
0 | 0 | 0 | 0 | ||||||||||||
1927 |
11 | 0 | 0 | 11 | ||||||||||||
1928 |
12 | 0 | 0 | 12 | ||||||||||||
1929 |
255 | 3,679 | 0 | 3,934 | ||||||||||||
1930 |
82 | 0 | 0 | 82 | ||||||||||||
1931 |
128 | 1,200 | 0 | 1,328 | ||||||||||||
1932 |
130 | 0 | 0 | 130 | ||||||||||||
1933 |
279 | 2,676 | 0 | 2,955 | ||||||||||||
1934 |
170 | 2,471 | 0 | 2,641 | ||||||||||||
1935 |
170 | 4,423 | 0 | 4,593 | ||||||||||||
1936 |
239 | 7,817 | 0 | 8,056 | ||||||||||||
1937 |
298 | 6,199 | 0 | 6,497 | ||||||||||||
1938 |
173 | 11,179 | 0 | 11,352 | ||||||||||||
1939 |
78 | 10,081 | 0 | 10,159 | ||||||||||||
1940 |
489 | 14,097 | 0 | 14,586 | ||||||||||||
1941 |
251 | 14,220 | 0 | 14,471 | ||||||||||||
1942 |
331 | 20,176 | 0 | 20,507 | ||||||||||||
1943 |
678 | 14,229 | 0 | 14,907 | ||||||||||||
1944 |
764 | 14,091 | 0 | 14,855 | ||||||||||||
1945 |
1,629 | 9,131 | 32 | 10,728 | ||||||||||||
1946 |
620 | 18,697 | 496 | 18,821 | ||||||||||||
1947 |
1,377 | 14,246 | 652 | 14,971 | ||||||||||||
1948 |
1,327 | 14,857 | 278 | 15,906 | ||||||||||||
1949 |
1,645 | 14,767 | 346 | 16,066 | ||||||||||||
1950 |
1,617 | 29,536 | 385 | 30,768 | ||||||||||||
1951 |
2,558 | 25,289 | 588 | 27,259 | ||||||||||||
1952 |
4,059 | 24,686 | 868 | 27,877 | ||||||||||||
1953 |
4,970 | 28,784 | 1,631 | 32,123 | ||||||||||||
1954 |
4,713 | 26,406 | 2,298 | 28,821 | ||||||||||||
1955 |
5,352 | 42,677 | 3,287 | 44,742 | ||||||||||||
1956 |
8,670 | 32,219 | 6,859 | 34,030 | ||||||||||||
1957 |
13,098 | 23,235 | 11,644 | 24,689 | ||||||||||||
1958 |
13,900 | 34,721 | 9,315 | 39,306 | ||||||||||||
1959 |
15,959 | 34,223 | 11,584 | 38,598 | ||||||||||||
1960 |
13,940 | 36,609 | 7,410 | 43,139 | ||||||||||||
1961 |
14,952 | 32,947 | 7,196 | 40,703 | ||||||||||||
1962 |
16,443 | 34,915 | 8,695 | 42,663 | ||||||||||||
1963 |
11,941 | 32,704 | 2,347 | 42,298 | ||||||||||||
1964 |
12,191 | 38,299 | 6,500 | 43,990 | ||||||||||||
1965 |
10,326 | 46,179 | 4,295 | 52,210 | ||||||||||||
1966 |
12,024 | 49,243 | 4,146 | 57,121 | ||||||||||||
1967 |
647 | 46,950 | 2,254 | 45,343 | ||||||||||||
1968 |
799 | 59,590 | 718 | 59,671 | ||||||||||||
1969 |
734 | 52,739 | 162 | 53,311 | ||||||||||||
1970 |
739 | 57,250 | 367 | 57,622 | ||||||||||||
1971 |
756 | 71,777 | 174 | 72,359 | ||||||||||||
1972 |
16,884 | 61,682 | 2,387 | 76,179 | ||||||||||||
1973 |
43,529 | 61,373 | 27,810 | 77,092 | ||||||||||||
1974 |
30,863 | 57,051 | 29,191 | 58,723 | ||||||||||||
1975 |
47,922 | 69,794 | 24,524 | 93,192 | ||||||||||||
1976 |
60,642 | 60,490 | 40,145 | 80,987 | ||||||||||||
1977 |
50,601 | 54,267 | 20,510 | 84,358 | ||||||||||||
1978 |
62,383 | 42,061 | 37,094 | 67,350 | ||||||||||||
1979 |
79,721 | 23,735 | 54,041 | 49,415 | ||||||||||||
1980 |
92,418 | 25,239 | 51,172 | 66,485 | ||||||||||||
1981 |
45,494 | 20,960 | 38,576 | 27,878 | ||||||||||||
1982 |
18,587 | 20,853 | 15,578 | 23,862 | ||||||||||||
1983 |
3,909 | 10,113 | 4,460 | 9,562 | ||||||||||||
1984 |
0 | 14,432 | 22 | 14,410 | ||||||||||||
1985 |
0 | 12,194 | 0 | 12,194 | ||||||||||||
1986 |
0 | 10,597 | 0 | 10,597 | ||||||||||||
1987 |
0 | 6,294 | 0 | 6,294 | ||||||||||||
1988 |
0 | 2,072 | 0 | 2,072 | ||||||||||||
1989 |
0 | 2,128 | 0 | 2,128 | ||||||||||||
1990 |
0 | 1,706 | 0 | 1,706 | ||||||||||||
1991 |
0 | 1,342 | 0 | 1,342 | ||||||||||||
1992 |
0 | 1,533 | 0 | 1,533 | ||||||||||||
1993 |
0 | 2,198 | 0 | 2,198 | ||||||||||||
1994 |
0 | 1,843 | 0 | 1,843 | ||||||||||||
1995 |
0 | 1,488 | 0 | 1,488 | ||||||||||||
1996 |
0 | 1,366 | 0 | 1,366 | ||||||||||||
1997 |
0 | 1,556 | 0 | 1,556 | ||||||||||||
1998 |
0 | 1,471 | 0 | 1,471 | ||||||||||||
1999 |
0 | 1,316 | 0 | 1,316 | ||||||||||||
2000 |
0 | 1,246 | 0 | 1,246 | ||||||||||||
2001 |
0 | 945 | 0 | 945 | ||||||||||||
2002 |
0 | 515 | 0 | 515 |
Page 184
30 September 2006 | 31 March 2006 | |||||||||||
A$m | A$m | Source | ||||||||||
(1) | Discounted Central Estimate |
1,554.8 | 1,517.0 | KPMGA report, Appendix D, column 6 | ||||||||
(2) | Discounting Impact |
1,614.0 | 1,562.2 | KPMGA report, Appendix D, column 6 | ||||||||
(3) = (1)+(2) | Inflated, Undiscounted Central Estimate |
3,168.9 | 3,079.2 | KPMGA report, Appendix D, column 6 | ||||||||
(4) | Inflation Allowance |
1,726.6 | 1,677.4 | KPMGA report, Appendix D, column 6 | ||||||||
(5) = (3)-(4) | Uninflated & Undiscounted Central Estimate |
1,442.3 | 1,401.8 | KPMGA report, Appendix D, column 6 | ||||||||
(6) | Equitas Bad Debt Charge (on UIUD basis) |
2.3 | 2.0 | [KPMGA Model of UIUD cashflows] | ||||||||
(7) | Cross-Claim recoveries (on UIUD basis) |
29.1 | 28.7 | [KPMGA Model of UIUD cashflows] | ||||||||
(8) = (5)+(6)+(7) | KPMGA Uninflated & Undiscounted Provision for Accounting |
1,473.8 | 1,432.5 | |||||||||
(9) | Claims handling Costs of SPF |
tbc | 67.7 | [to be assessed by JHINV / Amaca] | ||||||||
(10) | Net Assets of MRCF |
tbc | 71.6 | [to be assessed by JHINV / Amaca] | ||||||||
(11) = (8)+(9)-(10) | Accounting Liability pre-tax |
tbc | 1,428.6 | [to be assessed by JHINV] | ||||||||
(12) = 70% x (11) | Accounting Liability post-tax |
tbc | 1,000.0 | [to be assessed by JHINV] | ||||||||
Page 185
Australia | ||||||||||||||||||||
Six months ended | Twelve months ended | |||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | March 31, 2004 | March 31, 2003 | ||||||||||||||||
Number of claims filed |
218 | 346 | 489 | 379 | 402 | |||||||||||||||
Number of claims dismissed |
73 | 97 | 62 | 119 | 29 | |||||||||||||||
Number of claims settled or otherwise resolved |
206 | 405 | 402 | 316 | 231 | |||||||||||||||
Average settlement amount per claim (AU$) |
146,177 | 151,883 | 157,594 | 167,450 | 204,194 | |||||||||||||||
New Zealand | ||||||||||||||||||||
Six months ended | Twelve months ended | |||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | March 31, 2004 | March 31, 2003 | ||||||||||||||||
Number of claims filed |
0 | 0 | 0 | 0 | 0 | |||||||||||||||
Number of claims dismissed |
0 | 0 | 0 | 0 | 2 | |||||||||||||||
Number of claims settled or otherwise resolved |
0 | 0 | 0 | 0 | 1 | |||||||||||||||
Average settlement amount per claim (AU$) |
0 | 0 | 0 | 0 | 2,000 | |||||||||||||||
Unknown Court not identified | ||||||||||||||||||||
Six months ended | Twelve months ended | |||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | March 31, 2004 | March 31, 2003 | ||||||||||||||||
Number of claims filed |
0 | 6 | 7 | 1 | 7 | |||||||||||||||
Number of claims dismissed |
2 | 10 | 20 | 15 | 0 | |||||||||||||||
Number of claims settled or otherwise resolved |
2 | 12 | 2 | 0 | 3 | |||||||||||||||
Average settlement amount per claim (AU$) |
7,356 | 198,892 | 47,000 | 0 | 37,090 | |||||||||||||||
USA | ||||||||||||||||||||
Six months ended | Twelve months ended | |||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | March 31, 2004 | March 31, 2003 | ||||||||||||||||
Number of claims filed |
0 | 0 | 0 | 0 | 0 | |||||||||||||||
Number of claims dismissed |
1 | 0 | 3 | 1 | 0 | |||||||||||||||
Number of claims settled or otherwise resolved |
0 | 0 | 1 | 0 | 0 | |||||||||||||||
Average settlement amount per claim (AU$) |
0 | 0 | 228,293 | 0 | 0 | |||||||||||||||
Australia | ||||||||||||||||||||
As of | ||||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | ||||||||||||||||||
Number of claims pending |
503 | 556 | 712 | |||||||||||||||||
New Zealand | ||||||||||||||||||||
As of | ||||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | ||||||||||||||||||
Number of claims pending |
| | | |||||||||||||||||
Unknown Court not identified | ||||||||||||||||||||
As of | ||||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | ||||||||||||||||||
Number of claims pending |
17 | 20 | 36 | |||||||||||||||||
USA | ||||||||||||||||||||
As of | ||||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | ||||||||||||||||||
Number of claims pending |
| 1 | 1 | |||||||||||||||||
As of | ||||||||||||||||||||
September 30, 2006 | March 31, 2006 | March 31, 2005 | March 31, 2004 | March 31, 2003 | ||||||||||||||||
Number of open cases at beginning of year |
586 | 749 | 743 | 814 | 671 | |||||||||||||||
Number of new cases |
218 | 352 | 496 | 380 | 409 | |||||||||||||||
Number of closed cases |
284 | 524 | 490 | 451 | 266 | |||||||||||||||
Number of open cases at end of year |
520 | 577 | 749 | 743 | 814 | |||||||||||||||
Average Settlement per Settled Claim (AU$) |
144,843 | 153,236 | 157,223 | 167,450 | 201,200 | |||||||||||||||
Average Settlement per Closed Claim (AU$) |
106,082 | 121,945 | 129,949 | 117,327 | 177,752 |
Notes: | ||
1. | Data for 2006 only relates to 11 months data as that was the information upon which the 31 March 2006 valuation report was based and the 12 months data was not available at the time of release of the financial statements of James Hardie Industries NV | |
2. | The location of the court has been used as the location indicator with any Australian state implying Australia. Unknown Court not identified refers to claims where the location of the Court is blank or described as Other in the current claims database. | |
3. | The Average Settlement per Settled Claim (AU$) is defined as the sum of settlement amount divided by the numnber of claims settled where the settlement amount does not equal zero. | |
4. | The Average Settlement per Closed Claim (AU$) is the sum of settlement amount divided by the number of closed claims, so including claims where the settlement amount is equal to zero. | |
5. | A claim being dismissed relates to the case being closed and the MRCFs share of the settlement amount being equal to zero. | |
6. | The settlement amount is equal to the MRCFs share of the plaintiff award and plaintiff legal fees, so this excludes any legal costs relating to defence by the MRCF. |
Page 186
(a) | any Proven Claim; | ||
(b) | Operating Expenses; | ||
(c) | Claims Legal Costs; | ||
(d) | any claim that was made or brought in legal proceedings against a Former James Hardie Company commenced before 1 December 2005; | ||
(e) | Statutory Recoveries within the meaning and subject to the limits set out in the Final Funding Agreement; | ||
(f) | a claim or category of claim which James Hardie and the NSW Government agree in writing is a AICF Funded Liability or a category of AICF Funded Liability. |
Page 187
(a) | for contribution by a Concurrent Wrongdoer against a Former James Hardie Company or a member of the James Hardie Group in relation to facts or circumstances which give rise to a right of a person to make a Personal Asbestos Claim or a Marlew Claim; or | ||
(b) | by another person who is entitled under common law (including by way of contract) to be subrogated to such a first mentioned cross-claim or other claim; |
(i) | personal injury or death claims arising from exposure to Asbestos outside Australia; |
||
(ii) | personal injury or death claims arising from exposure to Asbestos made outside Australia; | ||
(iii) | claims for economic loss (other than any economic loss forming part of the calculation of an award of damages for personal injury or death) or loss of property, including those relating to land remediation and/or Asbestos or Asbestos products removal, arising out of or in connection |
Page 188
with Asbestos or Asbestos products manufactured, sold, distributed or used by or on behalf of the Liable Entities; | |||
(iv) | any Excluded Marlew Claim; | ||
(v) | any liabilities of the Liable Entities other than AICF Funded Liabilities. |
(a) | covered by the indemnities granted by the Minister of Mineral Resources under the deed between the Minister, Fuller Earthmoving Pty Limited and James Hardie Industries Limited dated 11 March 1996; or | ||
(b) | by a current or former employee of Marlew in relation to an exposure to Asbestos in the course of such employment to the extent: |
(i) | the loss is recoverable under a Workers Compensation Scheme or Policy; or | ||
(ii) | the Claimant is not unable to recover damages from a Marlew Joint Tortfeasor in accordance with the Marlew Legislation; |
(c) | by an individual who was or is an employee of a person other than Marlew arising from exposure to Asbestos in the course of such employment by that other person where such loss is recoverable from that person or under a Workers Compensation Scheme or Policy; or | ||
(d) | in which another defendant (or its insurer) is a Marlew Joint Tortfeasor from whom the plaintiff is entitled to recover compensation in proceedings in the Dust Diseases Tribunal, and the Claimant is not unable to recover damages from that Marlew Joint Tortfeasor in accordance with the Marlew Legislation. |
Page 189
(a) | any present or future personal injury or death claim by an individual or the legal personal representative of an individual, for damages under common law or other law (excluding any law introduced or imposed in breach of the restrictions on adverse regulatory or legislative action against the James Hardie Group under the Final Funding Agreement, and which breach has been notified to the NSW Government in accordance with the Final Funding Agreement) which: |
(i) | arose or arises from exposure to Asbestos in the Baryulgil region from Asbestos Mining Activities at Baryulgil conducted by Marlew, provided that: |
A. | the individuals exposure to Asbestos occurred wholly within Australia; or | ||
B. | where the individual has been exposed to Asbestos both within and outside Australia, the amount of damages included in the Marlew Claim shall be limited to the amount attributable to the proportion of the exposure which caused or contributed to the loss or damage giving rise to the Marlew Claim which occurred in Australia; |
(ii) | is commenced in New South Wales in the Dust Diseases Tribunal; and | ||
(iii) | is or could have been made against Marlew had Marlew not been in external administration or wound up, or could be made against Marlew on the assumption (other than as contemplated under the Marlew legislation) that Marlew will not be in the future in external administration; |
(b) | any claim made under compensation to relatives legislation by a relative of a deceased individual (or personal representative of such a relative) or (where permitted by law) the legal personal representative of a deceased individual in each case where the individual, but for such individuals death, would have been entitled to bring a claim of the kind described in paragraph (a); or | ||
(c) | a Contribution Claim relating to a claim described in paragraphs (a) or (b). |
Page 190
(a) | any Proven Claim (whether arising before or after the date of this deed); | ||
(b) | Operating Expenses; | ||
(c) | Claims Legal Costs; | ||
(d) | any liability of a Former James Hardie Company to the AICF, however arising, in respect of any amounts paid by the AICF in respect of any liability or otherwise on behalf of the Former James Hardie Company; | ||
(e) | any claim that was made or brought in legal proceedings against a Former James Hardie Company commenced before 1 December 2005; | ||
(f) | if regulations are made pursuant to section 30 of the Transaction Legislation and if and to the extent the AICF and James Hardie have notified the NSW Government that any such liability is to be included in the scope of Payable Liability, any liability of a Former James Hardie Company to pay amounts received by it from an insurer in respect of a liability to a third party incurred by it for which it is or was insured under a contract of insurance entered into before 2 December 2005; and | ||
(g) | Statutory Recoveries within the meaning and subject to the limits set out in the Final Funding Agreement, |
Page 191
(a) | arises from exposure to Asbestos occurring in Australia, provided that: |
(i) | the individuals exposure to Asbestos occurred wholly within Australia; or | ||
(ii) | where the individual has been exposed to Asbestos both within and outside Australia, damages included in the Marlew Claim shall be limited to the amount attributable to the proportion of the exposure which caused or contributed to the loss or damage giving rise to the Personal Asbestos Claim which occurred in Australia; |
(b) | is made in proceedings in an Australian court or tribunal; and |
||
(c) | is made against: |
(i) | all or any of the Liable Entities; or |
||
(ii) | any member of the James Hardie Group from time to time; |
(d) | any claim made under compensation to relatives legislation by a relative of a deceased individual (or personal representative of such a relative) or (where permitted by law) the legal personal representative of a deceased individual in each case where the individual, but for such individuals death, would have been entitled to bring a claim of the kind described in paragraph (a); or | ||
(e) | a Contribution Claim made in relation to a claim described in paragraph (a) or (b) |
Page 192
(i) | from the date on which the principal obligations under the Final Funding Agreement will commence to 31 March 2045, | ||
(ii) | as may be extended in accordance with the terms of the Final Funding Agreement. |
(a) | any workers compensation scheme established by any law of the Commonwealth or of any State or Territory; | ||
(b) | any fund established to cover liabilities under insurance policies upon the actual or prospective insolvency of the insurer (including without limitation the Insurer Guarantee Fund established under the Workers Compensation Act 1987 (NSW)); and | ||
(c) | any policy of insurance issued under or pursuant to such a scheme. |
Page 193